Inst ToolsInst ToolsInst Tools
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Search
  • Books
  • Software
  • Projects
  • Process
  • Tools
  • Basics
  • Formula
  • Power Plant
  • Root Cause Analysis
  • Electrical Basics
  • Animation
  • Standards
  • 4-20 mA Course
  • Siemens PLC Course
Reading: PLC Program for Daily Production Record
Share
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • Design
  • PLC
  • Interview
  • Control System
Search
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > PLC Tutorials > PLC Program for Daily Production Record

PLC Program for Daily Production Record

PLC Program for Daily Production Record. Learn the problem description with a detailed explanation of the ladder logic.

Last updated: November 3, 2023 10:16 am
Editorial Staff
PLC Tutorials
No Comments
Share
5 Min Read
SHARE

PLC Program for Daily Production Record. Learn the problem description with a detailed explanation of the ladder logic.

Contents
Daily Production RecordProblem DiagramPLC SolutionList of Inputs/OutputsLadder Diagram for Daily Production RecordPLC Program DescriptionRuntime Test Cases

Daily Production Record

Problem Description

In many industries, It is required to count the number of products that are made in one day and it is very necessary for selling the products or tracking the production quantity on a daily basis.

In the olden days, human operators were allotted for counting the final products but because of some human errors, precise counting is not possible. Therefore we cannot get proper counting of all products and are unable to track the production quantity effectively.

Mostly these types of problems occur in food and beverage industries, box packaging industries, bottle filling applications etc. So we can use a simple PLC based logic to track the daily production and to record it electronically.

Problem Diagram

PLC Program for Daily Production Record

PLC Solution

Here we will solve the problem of counting of final products by using sensors and PLC programming. First sensor sense the product and counts the quantity and the value will be shown on the digital display (as shown in above figure).

For easy explanation, we will consider one simple example of empty box counting system. In this system empty boxes are travelling form first process to second process (say one place to another).

Sensor is used for counting the empty boxes. So when sensor will detect empty box then display will start , say starts count from  1 and this is done by simple logic.

Every 24 hours / after one day, we can reset the counter value by using RESET button. Here we will consider two batches of production for easy explanation.

And also we have considered two batches completion indications for operator for each batch which will display on the Local Panel. By PLC logic we will implement the desired logic.

So when any batch will be completed then indication lamp will be ON as per PLC program.

Once production target will be completed, display counter can be reset by using RESET button.

List of Inputs/Outputs

Inputs List

  • Box detector Sensor: I0.0
  • Reset: I0.1
  • Main SWITCH: I0.2

Outputs List

  • Target completed: Q0.0
  • Batch 1 completed: Q0.1
  • Batch 2 completed: Q0.2

Ladder Diagram for Daily Production Record

Ladder Logic for Daily Production Record

PLC Program Description

In this application, we have used Siemens S7-1200 PLC and TIA Portal Software for programming.

Network 1:

In Network 1 we used Main SWITCH (I0.2) to start the system/batch and we used NO contact of box detector sensor (I0.0) in series. Here we considered one UP counter so when box detector sensor (I0.0) detects  the box then counter will starts counting.

Here also we have taken target completed output (Q0.0) for target completion indication for the operator indication on the panel. By pressing RESET button (I0.1) operator can RESET the old production record.

Counter operation is used to count the products, in which RESET (I0.1) used for reset the production record. And Preset value (PV) is 20 products. Counter value (CV) is MW2 indicates the actual number of products detected by sensor & this value will be used in the following rungs to track the batch status.

Network 2:

In Network 2 we used batch1 logic from counter block output CV. Here we used comparator for counting 10 boxes for batch 1 and when it will be completed then batch 1 completed lamp (Q0.1) will ON. In this add equal to equal comparator in which input is (MW2) and for 10 products.

Network 3:

In network 3 we used batch 1 logic from counter block output CV. Here we used comparator for counting 20 boxes for batch 2 and when it will be completed then batch 2 competed lamp (Q0.2) will ON

And this way we can decide that how many products and batches are produced.

Runtime Test Cases

PLC Production

Note: The above PLC Logic provided for basic idea about application of PLC in industrial production record. The Logic is limited and not complete application.

Author: Bhavesh

If you liked this article, then please subscribe to our YouTube Channel for PLC and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • SR Flip Flop using PLC
  • PLC Program using Logic GATE
  • Asynchronous Motor Control PLC
  • PLC I/O addressing
  • Alarms in Process Control
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Allen Bradley RSLogix 500 PLC Programming
Modbus Communication between PLC and Energy Meter
Step-by-Step Guide to Choose Right Fuse for a Panel
4-20 mA Transmitter Wiring Types : 2-Wire, 3-Wire, 4-Wire
How to Choose the Right Industrial Automation Solution?
Allen Bradley SLC 500 PLC Programming
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
210kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

Automatic Car Washing using PLC
Classroom Bell System – PLC Programming Practice Examples
Comparison Instructions in PLC Programming
Product Sticker Machine with Weighing PLC Program
Two Hand Control Logic using PLC
How to Convert an Electrical Diagram into PLC Program?
Studio 5000 Tutorial: PLC Programming for Digital Alarms
PLC Based Product Sorting Machine System – Lift Control

Keep Learning

PLC Project Examples for EcoStruxure Machine Expert

PLC Project Examples for EcoStruxure Machine Expert

Parameters of SRT_DINT instruction

Tia Portal – OB20 Time Delay Interrupt Organization Block

PLC Program Backup in Siemens Tia Portal

How to Take Program Backup from Physical PLC? – Siemens PLC

Communication Protocols in PLC

Various Communication Protocols in PLC

Difference Between PLC and CNC Machine

Difference Between PLC and CNC Machine

Architecture of Allen Bradley PLC

Architecture of Allen Bradley PLC

Structured Text Selector Machine Logic

Write a PLC Program for Selector Machine using Structured Text

HMI configuration for Delta VFD

Modbus Communication between Delta PLC with VFD

Learn More

A Large Gate Valve Failed Motorized Operation

A Large Gate Valve’s Failed Motorized Operation

butt weld end Plug Valves Leaks Stopped

PTFE lined 6” 300# butt weld end Plug Valves Leaks Stopped Forever

Belt Conveyor Weighing System

Belt Conveyor Weighing System – Weigh Bridge – Speed Sensor

Top 100 Zigbee Projects for Engineering Students

Top 100 Zigbee Projects for Engineering Students

Instrumentation Engineer Interview Questions

Interview Questions on PID Controllers

Door Lock with Delay PLC Exercise Problems

Door Lock with Delay PLC Exercise Problems

Power Systems Questions & Answers

Power Systems MCQ Series 8

Analog Electronics Objective Questions

Analog Electronics Objective Questions – Set 9

Menu

  • About
  • Privacy Policy
  • Copyright

Quick Links

  • Learn PLC
  • Helping Hand
  • Part Time Job

YouTube Subscribe

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?