Inst ToolsInst ToolsInst Tools
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: Repeat Failures of Letdown Valves
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > Repeat Failures of Letdown Valves

Repeat Failures of Letdown Valves

Instrumentation engineering root cause analysis (RCA) of letdown valves repeat failures in industrial plant.

Last updated: September 28, 2022 3:02 pm
S Raghava Chari
Root Cause Analysis (RCA)
No Comments
Share
4 Min Read
SHARE

Instrumentation engineering root cause analysis (RCA) of letdown valves repeat failures in industrial plant.

Contents
Repeat Failures of Letdown ValvesFinal SolutionRCA solution Benefits
Article Type:Root Cause Analysis (RCA)
Category:Instrumentation
Equipment Type:Control Valves
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Repeat Failures of Letdown Valves

As foreseen, within a week failed PCV 205 S shut down the plant chaotically.

Crew bolted the as soon as possible (ASAP) readied and carbon-steel flanges screwed valve PCV 205 to the pipeline and production resumed in 6 hours. The wisely screwed-in CS flanges reduced the downtime by 2 hours. 

As before crew readied spare valve PCV 205S too ASAP and vigorously considered plug to stem strengthening.

Also Read: First Time Letdown Valve Problem

Final Solution

The SS 329 plug broke into two while welding to the stem. Hence, the author decided to use No Joint Inner Valve (NJIV) braving the below given two constraints and the valve maker not approving it.

  1. The manufacturer neither supplied the NJIV nor approved making it out of SS 329 citing reasons of standards permit only resilient SS 316 stem screwed to erosion resistant hard SS 329 plug and 329’s non-weldability.
  2. Still the author got SS NJIV turned overcoming the below given constraints:
  3. Suitable size SS 329 bar stock non-availability
  4. Excessive materials and efforts waste by turning the Max 40 mm dia NJIV out of the only 124 mm dia x 1.5 m long carbomate pump discarded plunger.
  5. He got a 800 mm long piece cut, tacked it vertically to a large plate. A crew of 2 working for two hours and another taking over hacksawed it into 4 quadrants in 12 hours. The shop turned out the two NJIVs one each for PCV 205 and PCV 205 S. They saved remaining two for other uses.
  6. Instrument crew readied PCV 205 with the NJIV. It went on the line at a soonest shutdown opportunity. It failed never! The author believes no joint and the generous fillet radius he provided where the dia reduces from 38 to 25.4 mm are the reasons for the IVs success. 

Crew readied PCV 205 S with NJIV. However, it has become a non-moving spare!

RCA solution Benefits

A lasting and least-cost solution for a DDUDP.

The valve PCV 205 inspected at 3‑years intervals is excellent.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Valve Positioners Failed
  • Errors and Faults in Siemens PLC
  • Electrical Engineering Problems
  • Pressure Taps Block Valves Leaks
  • Unstable & Drifting Values of Transmitter
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Pipeline Shakes Torn apart Valve Positioners
Too often done riskily repaired Roof Hot Spots eliminated forever
Within Few Weeks Failing Acid Dozing Pumps
Antifriction Bearings Caused Machine Changeovers Posed Outages
Magnetic Flow Meter Liner Damaged and Winding Burnt
Doubtful Temperature Readings threatens Soaking Pit Wrecks 
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

Control Panel Instruments Problem Threatened Plant Shutdown
Rupture Discs bursts caused too many Urea Plant Shutdowns
Root Cause Analysis for Tank Overflow due to Valve Problem
Centrifugal Compressor Outage Reduced – Root Cause Analysis
High-pressure Service Level Transmitters Misunderstood Zero Drifts
18 Temperature Sensors Fault Leads to Plant Shutdown
Repeat Control Valve Plug Stem and Gland Leaks
Erratic Radar Level Gauges Delays a Refinery Commissioning
Premature Arc Fault Breaker Failures
Cooling Tower fan FRP fan blades saves and saves

Keep Learning

Piston No-Diaphragm Seal Instrument

Seal Pressure Instruments Root Cause Analysis

Gearbox within week Failing Journal Bearing upset Plant Operations

Gearbox within week Failing Journal Bearing upset Plant Operations

Rolled & Seal Welded Tube to Tube sheet joints

Gas Cooler Re-tubing Done Successfully (Root Cause Analysis)

Fired Boiler Induced Draft Fan (IDF) Failures

Fired Boiler Induced Draft Fan (IDF) Failures Upset all Plants Operations

Totally Enclosed Fan Cooled (TEFC) Motor

Totally Enclosed Fan Cooled (TEFC) Motors Rampant Winding Burnouts

Chemical Reactor Vessel P and ID

Wrong Operation Internals Destroyed Demineralization Mixed Bed Vessel

Rotary Drier Shell to Split Gear drive

Rotary Drier Shell to Split Gear drive eliminates too frequent drive failures

Packing Compressing Die Set

Carbamate Plunger Pump Packing Problems Eliminated

Discover More

displacer level transmitter cylindrical weighs

Displacer Level Transmitter 5-point Calibration

DOL Starter Testing

DOL Starter – Working, Circuit, Advantages, Disadvantages, Applications

WirelessHART Principle

Wireless HART Communication Protocol Overview

Fieldbus Transducer blocks

Foundation Fieldbus Standard Function Blocks

7 Marketing Strategies for Engineering Companies

7 Marketing Strategies for Engineering Companies

Power Electronics Objective Questions

Dual Converters Quiz

Digital Electronics Multiple Choice Questions

Multiplexers Objective Questions – Part 2

Allen Bradley PLC communication is established

Procedure for Connecting Allen Bradley PLC and PC – RS Logix 500

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?