Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.
The pipe elbow burst problem discussed under Mechanical Problems wrecked the NH3 plant control panel instruments also entirely.
The general manager (GM) requested the author Instrument Engineer then to restore the instrumentation by hook or crook to under-platy the situation gravity and for morale-boosting.
Restoration details follow:
The below-listed constraints made the task Difficult, Unattainable, and Despairing Problem (DDUDP).
Yet the author and his team trusting in God and other teams’ whole-hearted cooperation started the job after a vigorous prayer and completed it.
Description follows:
Panel Pneumatic Receivers Restoration proceeded thus:
The assurance that all pneumatic receivers and controllers are restorable boosted the morale so high that they took other jobs too enthusiastically.
An instrument tech and an electrician took out all the panel electronic instruments – temperature recorders and selector switches – and sent them to a firm who helped us with electronic instrument problems.
While the pneumatic and electronic instruments restorations were progressing, the author formed an Instrument Technician and an operator, an Electrician, and an operator team.
The operator closed all field transmitters and valve positioners’ air supplies. He opened e.g. PT 101 air supply.
The instrument technician in the control room would immerse the damaged tube ends in a beaker of water one by one, identified, and tagged as PT 101 the tube that bubbles.
The operator – Electrician team identified and tagged the from the receiver PRESSURE 101 damaged tube end likewise. This laborious process was necessary, as the site assembled tube bundle had no individual tubes identifying number.
They araldite coated the identified tube ends and inserted in a tight-fitting PVC tube for reliable and pull out free joints. Then they confirmed PT 101 connects to PRESSURE 101.
The twine-tied the jointed tubes and wrapped 25 mm wide tightly gripping electrical insulation tape to prevent mechanical damages. Thus, the damaged air signal tubes bundles were ready in 8‑days.
Two nos. two electricians team crew removed the terminals wires connections preserving their original geometry, from the home wired contactor trip panels, took those out, water washed, oven-dried, discarded the existing contactors, positioned new bought out contactors, and connected the wires.
The trip panels were ready in two days.
The electronics expert delivered the electronic temperature recorders, indicators, and selector switches in 8 days. He declined to share his special know-how!
Faced Constraints and overcoming details follow:
Make red pen bucket duplicating a store held spare; the PM folded 0.3 mm thick brass sheet as a rectangular bucket as the original and soldered the seams.
He recovered the tubes only from the bought-out syringes discarding the rest, bent like the original, and soldered to the bucket.
In addition, soldered cut portions from discarded steel measuring tapes as pen holders for inserting into receiver arm socket. The red pen is ready.
Likewise, he made green and blue pens also. Required quantities all types of pens were ready in two days
The plant took these face-lift steps to prevent past gruesome incident reminders and assuring maximum possible safety.
The DDUDP instrumentation restoration was ready in a record 10-days. The plant started with a puja and prasad distribution smoothly.
The share-holding US partner sent the former US citizen General Manager to make sure of necessary plant changes to prevent the accident recurrence. He remarked, “Chari, you and your team have re-built a truck run-over egg; hats off to you and your team.”
Author: S. Raghava Chari
Do you face any similar issues? Share with us through the below comments section.
If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.
You can also follow us on Facebook and Twitter to receive daily updates.
Read Next:
Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…
Rotating equipment packages such as pumps, compressors, turbines need the lube oil consoles for their…
This article explains how to blink lights in ladder logic with a detailed explanation video…
In this article, a simple example will teach you the conversion from Boolean algebra to…
In this article, you will learn the PLC cooking timer example for kitchen automation using…
Learn an example PLC program to control a pump based on level sensors using ladder…