Inst ToolsInst ToolsInst Tools
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: Urea Reactor Top Bolted Plug developed Leaks
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > Urea Reactor Top Bolted Plug developed Leaks

Urea Reactor Top Bolted Plug developed Leaks

After several years of service the urea reactor top bolted plug developed leaks. This root cause analysis solved the problem.

Last updated: September 28, 2022 3:08 pm
S Raghava Chari
Root Cause Analysis (RCA)
No Comments
Share
4 Min Read
SHARE

After several years of service the urea reactor top bolted plug developed leaks. This root cause analysis solved the problem.

Contents
Urea Reactor Top Bolted Plug LeaksCrew’s leak stop attemptRepair Attempts
Article Type:Root Cause Analysis (RCA)
Category:Mechanical
Equipment Type:Pipelines and Miscellaneous Problems
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Urea Reactor Top Bolted Plug Leaks

After several years of service the urea reactor 400 mm, dia x 280 mm thick top bolted plug (fig A) developed leaks.

Tightening the studs loads the 30o included angle plug (fig B) and the 20o included angle reactor body opening conical portion line contact resulting in leak tight joint.

Crew usually repair such leaks by lapping the plug cone and reactor opening cone with a cast iron lap paste smeared lap block.

Usually the task takes several shutdown days. Since, the minor leak posed neither serious safety nor environment hazard; the plant lived with the leak awaiting a suitable repair opportunity.

Reactor Opening & Plug
Fig A

Crew’s leak stop attempt

Crew leader showed the CI lapping block showing only cone to lap the reactor 20o included angle opening using the reactor drawing given information (fig B), and another lap block for lapping the 30o plug sketch.  

The author appreciated the crew leader sketch. In addition, he suggested cutting the plug cone-lapping portion also on the same block to save costs. The lapping block was ready in few days.

Reactor Top lid lapped
Fig B

Repair Attempts

Severe draught forced an indefinite plant shutdown. The crew started the task. The leader reported two days later that two nos. cover studs defy unscrewing from the reactor body even with violent efforts. It would prevent Tommy bar Clockwise (CW) and CCW lap block rotation. Hence, lapping has not yet started.

The author chided himself for overlooking this possibility when he reviewed the lap block sketch.

He educated the crew to avoid unscrewing studs from vessels and valves as this could damage the body threads. Their repair is lengthy and time taking and often beyond field crew’s resources.

Site visit and few minutes thinking flashed him an idea: just drill a hole in the lapping block center and tighten a long stem to accept the Tommy bar well above the studs (fig B). Often site visits will generate ideas, which sometimes don’t occur on the office table drawing studies.

The crew lapped the reactor seat with the tall stem fitted lap block. They removed the stem, inverted the lap block and lapped the plug also. The entire task was over in a week working general shift hours only.

Operation crew 300 bars hydro-tested reactor with chlorides free condensate using the air operated piston pump that came with the plant. No leaks cheered all.

In addition, the crew learned the evils of violently unscrewing studs from vessel and valve bodies.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Gas Cooler Re-tubing
  • Rotary Granulator Drive
  • Problems with Demister Pads
  • Steam Letdown Station Problems
  • Bucket elevators Chain Problems
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Recommended Articles

Repeat Safety Valve Popping caused Urea Plant Shutdown
Leaky Boiler Drum Level Switch Stops NH3 Plant Commissioning
Steam Turbine Driven Centrifugal Compressors Leak due to Broken Instrument
Fasteners and General Corrosion of Electrical Motors
Panel and Field Pneumatic Controller’ Bumpless Transfer Issues
Lessons Learned from Actuator Passing Incidents
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Recent Comments

  • William Snyder on Top Non-PLC Certification Courses for Automation Professionals
  • Kamli on Top Free PLC Software
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals

Related Articles

Steam Pressure Taps Primary Block Valves Glands and Bonnets Leaks

Instrument Steam Pressure Taps Primary Block Valves Glands and Bonnets Leaks

Plunger Pump

Within Few Weeks Failing Acid Dozing Pumps

Bently Nevada Proximity Probe

Root Cause Analysis for Vibration Probe Not Responding

Erratic Stroking Control Valves

Erratic Stroking Control Valves Delaying the Shutdown Plant Restart

Thermocouple Extension Lead Minimizer Circuit

Thermocouple Wires and Extension Lead Issues

Steam Letdown Station Problems

Steam Letdown Station Problems and their Solutions

Demister Pads Problem

Problems with Demister Pads – Root Cause Analysis (RCA)

Lightning Arrester Bursts Problem

Frequent Feeder-A Lightning Arrester (LA) Bursts – Root Cause Analysis

More Articles

bourdon-tube-pressure-gauge-working-animation

Working Principle of Pressure Gauge

Advantages & Disadvantages of AC power and DC power

Advantages & Disadvantages of AC power and DC power

Ozone analyzer principle

Ozone Analyzer Working Principle

Pressure Transmitters Installation Factors

Pressure Transmitters Installation Tips

Calculate Density and Specific Gravity

Calculate Density and Specific Gravity

Variable Area Flow Meters

All About Variable Area Flow Meters

IPv4 vs IPv6 - What’s the Difference Between IP addresses

IPv4 vs IPv6 – What’s the Difference Between IP addresses?

Fieldbus Flow Transmitter Calibration

Foundation Fieldbus Transmitter Calibration

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?