Inst ToolsInst ToolsInst Tools
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: Aluminum Cable Terminations Repeat Failures
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > Aluminum Cable Terminations Repeat Failures

Aluminum Cable Terminations Repeat Failures

Electrical engineering root cause analysis (RCA) related to aluminum cable terminations repeat failures and solved problems.

Last updated: September 28, 2022 3:08 pm
S Raghava Chari
Root Cause Analysis (RCA)
No Comments
Share
4 Min Read
SHARE

Electrical engineering root cause analysis (RCA) related to aluminum cable terminations repeat failures.

Contents
Aluminum Cable Terminations FailuresAuthors Root Cause AnalysisSolution
Article Type:Root Cause Analysis (RCA)
Category:Electrical
Equipment Type:Bus ducts, Switchgear, Transformers,
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Aluminum Cable Terminations Failures

Many failed Aluminum (Al) cable conductor’s terminations particularly at electric motors during the seventies because of technology infancy posed pain in the neck problems to electrical crew and reduced production.

Aluminum Cable Terminations
Example Image

Authors Root Cause Analysis

Why problems with aluminum conductor terminations?

The motors’ copper cable terminal boxes were too small for the much larger aluminum cables.  Hence, the field crew substituted homemade sheet steel with larger terminal blocks (TBs).

Unfortunately, these were not as water and dust-tight as the originals. High contact resistance terminations because of easily entered water vapors and pollutants corrosion worsened the knowhow lack done aluminum (Al) conductors terminations’ already high contact resistances.

Consequent, hot terminals, charred insulation, and phase to phase and or phase to earth shorts, long motors restoration times reduced production and increased maintenance costs.

Solution

The authors below given RCA solution steps eliminated the problems forever:   

  1. Install purchased from motor vendor large enough to accept aluminum (Al) cables IP 55 class external corrosion resistant cast iron TBs
  2. Enter the cables via TB bottom screwed glands only. No top entry. Follow best gland practice to prevent dust and moisture entry
  3. Internally delta-connect direct on line (DOL) start motor windings as 3‑terminalas motors, to eliminate field jumpers and their potential loose connections problems. The clutter free and roomy TB helps easy Al cable connections. Specify internal delta connection in new motor orders / rewinding orders.
  4. Strictly supervise and ensure crew sticking to the below given Al lead termination procedure till they imbibe as a habit:
  5. Terminate even aluminum (Al) leads on tinned copper lugs only
  6. Stock required sizes no stud hole copper (Cu) lug only
  7. Drill stud hole of dia 1 mm more than stud dia
  8. Emery clean each lead strand and smear oxidation inhibiting compound immediately. Bunch the emery cleaned and compound smeared strands, immediately insert into Cu lug and specified pressure crimp it.
  9. Lug the other conductors also like wise
  10. The aluminum (Al) cable lasts as good as the former copper cables

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Poorly Built Switchgears
  • Pulverizer Electrical Problem
  • Frequent Lightning Arrester Burst
  • 110 KV Connection to Feeder
  • Transformer Problem Solved
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Recommended Articles

Target Flow Transmitters Failed the Very Midnight
Control Valves Leak Tightness Restoration Pose Difficulties
Rupture Discs bursts caused too many Urea Plant Shutdowns
Primary Reformer RFG main Hot Spots threaten Indefinite Outage
Control Panel Instruments Problem Threatened Plant Shutdown
Magnetic Flow Meter Liner Damaged and Winding Burnt
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Recent Comments

  • William Snyder on Top Non-PLC Certification Courses for Automation Professionals
  • Kamli on Top Free PLC Software
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals

Related Articles

Finned Heater Leaks Sealed

Finned Tube Steam Leaks – Root Cause Analysis

Pipe Elbow Sudden Burst

A Pipe Elbow Sudden Burst Fatalities and Wrecked Panel Instrumentation

Under and Over-Capacity Control Valve

Under and Over-Capacity Control Valve Pose Poor Controllability

Thermocouple Extension Lead Minimizer Circuit

Thermocouple Wires and Extension Lead Issues

Flash Vessel All Level Instruments Stopped Working

Ammonia Flash Vessel All Level Instruments Stopped Working

Capacitor Bank

Poor Power Factor Boosted – Industrial Electrical Problems

Plant Shutdown Analysis: Valve Closed and SOV Coil Failure

Plant Shutdown Analysis: Valve Closed and SOV Coil Failure

Damaged Magnetic Flow Meter Flow Tube

None Could Repair Slightly Damaged Magnetic Flow Meter Flow Tube

More Articles

Resistance Temperature Detectors Troubleshooting Tips

Resistance Temperature Detectors Troubleshooting Tips

D’Arsonval Movement

D’Arsonval Meter Movement

How to do Control Valve Sizing

How do you do control valve sizing in Layman’s terms?

Motor Cooling Methods

Motor Cooling Methods

Capacitor Principle

Capacitor

Totally Enclosed Fan Cooled (TEFC) Motor

Totally Enclosed Fan Cooled (TEFC) Motors Rampant Winding Burnouts

Selection of Weighing Balance

Selection of Weighing Balance and Weight for Calibration

Electrical Machines Questions and Answers

Excited Magnetic System Quiz

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?