Inst ToolsInst ToolsInst Tools
  • Ask
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: NH3 Storage Tanks Ammonia Gas Venting Issue – Root Cause Analysis
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Ask
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > NH3 Storage Tanks Ammonia Gas Venting Issue – Root Cause Analysis

NH3 Storage Tanks Ammonia Gas Venting Issue – Root Cause Analysis

Root Cause Analysis (RCA): NH3 Storage tanks 12 T/d ammonia gas venting issue and financially cripples a fertilizer plant.

Last updated: September 28, 2022 3:19 pm
S Raghava Chari
Root Cause Analysis (RCA)
No Comments
Share
4 Min Read
SHARE

Root Cause Analysis (RCA): NH3 Storage tanks 12 T/d ammonia gas venting issue and financially cripples a fertilizer plant besides attracting pollution authorities’ factory closure threat.

Contents
NH3 Storage Tanks Ammonia Gas Venting ProblemRCA Queries & AnswersFinal solutionPreparations & Package Commissioning
Article Type:Root Cause Analysis (RCA)
Category:Mechanical
Equipment Type:Miscellaneous Rotating Machine Problems
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

NH3 Storage Tanks Ammonia Gas Venting Problem

Tanks’ pressure controller constantly vented ≈ 12 t/d of NH3, to hold the tank top vapor space pressure at 300-mm WC due to poor availability of NH3 refrigeration compressors.  

RCA Queries & Answers

RCA queries and answers follow:

Q- Explain liquid NH3 storage

A-Storing liquid ammonia at -28o C at atmospheric pressure in cylindrical tanks is the most economical bulk storage method. Around 500 Kg/H NH3 evaporates from the state-of-the-art insulated 20-m tall 5000 T storage tank.

A refrigeration system draws, compresses, liquefies, and puts the liquid NH3 into the tank. The provided refrigeration system compressors’ availabilities were < 20%.

Hence, the tank pressure controller vents the gas to hold the tank pressure below the permitted 300 mm WC; hence, the plant suffered 12 T/day ammonia losses.

The author found the compressors so poorly built that improving was impossible. He recalled an ad on a screw-compressor package refrigeration system. Users’ feedback was exemplary. He ordered one package.

Final solution

Plant crew bolted the rush ordered and 4‑months hence received package skid less motor on the pre-readied foundation,

Reasons for less motor order were:

  1. A surplus 450 KW, 3000 RPM 3.3 KV motor was available in the warehouse
  2. US standard 60 Hz motors run too hot with India 50 Hz power supply
  3. Insisting on a 50-Hz motor would delay the delivery by 3 months
  4. In addition, even 50 HZ labeled US motors often run too hot in India

Preparations & Package Commissioning

  1. The plant crew readied the foundation based on the vendors package footprint drawing and loads detail.
  2. Fortunately, 2-spare breakers were available in the 3.3 KV load center. The electrical crew laid the breaker to foundation cable and readied the motor protection system

Mech crew bolted the package on the foundation within 6-hours of receipt. In addition, they bolted the 450 HP motor, aligned it, and coupled it to the package screw compressor.

The electrical crew dressed and connected the already laid cable to the motor.

The instrument crew connected the air supply to the package pressure controller, its output to the throughput control slide valve, and tuned the controller.

The package hummed within 20 hours of arrival. For the first time in ten years fully closed tank vent valve cheered everyone! The ten yearlong ammonia vapor venting ceased forever! The package was indeed a ‘fit and forget system.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Turbo-Compressor Problem
  • Compressor Anti-Surge Control
  • Process Air Compressor Overhauls
  • NH3 Plant Turbo-compressor Problem
  • Failing Plant Air Compressor Drives
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !
How Kalrez O-rings Seal So effectively So Long?
Gas Cooler Re-tubing Done Successfully (Root Cause Analysis)
Replace Failed Motors Quickly and Easily
Recurring Short Circuit Flash Overs Safety Hazards & Damages
CO2 Stripper Collapsed Internals Revamp
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Recent Comments

  • Kamli on Top Free PLC Software
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • MIHARITSOA Aina Sitraka on Top Non-PLC Certification Courses for Automation Professionals

Related Articles

Jacket Added Seawater Pipe Spool

Seawater Pipeline Spools from day-1 leaks threaten Plant Shutdown

Arc Fault Breaker (AFB) Electrical Problem Solved

Arc Fault Breaker (AFB) Electrical Problem Solved

Bently Nevada Proximity Probe

Root Cause Analysis for Vibration Probe Not Responding

Control Valve Passing Problem after Overhauling Job

Control Valve Passing Problem after Overhauling Job

Damaged Magnetic Flow Meter Flow Tube

None Could Repair Slightly Damaged Magnetic Flow Meter Flow Tube

Transformers Coolers Weld Joints Oil

Transformers Coolers Weld Joints Oil Oozes Were Eye Sores

Chemical Reactor Vessel P and ID

Wrong Operation Internals Destroyed Demineralization Mixed Bed Vessel

Rotary Granulator Drive

Rotary Granulator Drive Root Cause Analysis (RCA)

More Articles

memory types in siemens plc

Memory Structure of Siemens PLC

Motor ON OFF Logic in PLC

Motor ON OFF Logic in PLC

Solar Arrays

Solar Photovoltaic Cells – Parts of the Solar Panel

safety control system

Safety Instrumented Burner Management System

Track PLC Operating Modes

#2 PLC Best Practices – Track Operating Modes

Industrial Automation Protocols

Industrial Automation Protocols

Power Electronics Objective Questions

PWM Inverters Objective Questions

Voting System in PLC

Voting Concept in Package Safety System

Follow US