Inst ToolsInst ToolsInst Tools
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: Too often done riskily repaired Roof Hot Spots eliminated forever
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > Too often done riskily repaired Roof Hot Spots eliminated forever

Too often done riskily repaired Roof Hot Spots eliminated forever

Root Cause Analysis (RCA) related to the roof hot spots repairs and their problem eliminated forever.

Last updated: September 28, 2022 3:15 pm
S Raghava Chari
Root Cause Analysis (RCA)
No Comments
Share
8 Min Read
SHARE

Root Cause Analysis (RCA) related to the roof hot spots repairs and their problem eliminated forever.

Contents
Roof Hot Spots ProblemSolutionPre-TA ActivityTA activitiesBenefits of fiber blanket liningSidewall Refractory
Article Type:Root Cause Analysis (RCA)
Category:Mechanical
Equipment Type:Pipelines and Miscellaneous Problems
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Roof Hot Spots Problem

20 to 30% of the cast bricks thermally insulating the reformer room fell off randomly yearly, after two years of service. Hazardous emergency repairs of welding cast refractory lined box over the hot spots (HS) avoided plant shutdowns.

The hot spotted parent roof portions plus some adjacent areas disintegrated in time. The plant felt a keen need to stop the recurring, annoying, expensive, and hazard-prone emergency hot spot boxing for safety-enhancing and eliminating the repeated expensive roof metal renewal at the two-yearly turnarounds (TA).

Solution

The plant lined the revamped roof during the IN 529 RT change (earlier Problem) with the vendor suggested 12600C grade non-ceramic Fiber blankets (FB). More details follow:

Ceramic Fiber Lined Reformer Furnace Roof
Fig 1

Pre-TA Activity

Below listed are pre-TA tasks:

  1. Technicians flame cut 3650 x 2950 x 12 mm carbon Steel Roof Plate panels, ground weld edge prepared the ends, chalk marked vendor recommended flat anchor – described later – positions, and cut 220×170 oval openings to insert the 150-mm OD reformer tubes with welded bottom outlet nozzles. The chosen panel dimensions minimizes wastage while cutting out of standard 7500x610x20 mm sized rolls.
  2. Crew calibrated the vendor furnished welding gun popularly called ‘Six-shooter’ thus: they clamped vendor furnished Inconel Flat Anchor (FA fig 2) to the gun plugged to a 220 V AC outlet; pressing the ‘on button’ they touched the FA to the panel at the marked location. Presto, the FA welds on to the panel instantly and so strong that the weld did not break even on hammering the studs flat with the panel
  3. Without disturbing the calibrated setting, they welded the flat anchors to the panel (fig 1) at specified longitudinal and lateral pitch. The welding ease and speed of 20 welds / minute surprised all.
  4. FA underhand shop welding to panels took 50% of the estimated field overhead welding time on the finished roof
  5. In, addition, saved the scaffold building and stud welding during numerous other revamp activities progress during TA. It saved 6-TA days, and enabled reformer tubes installation and catalyst loading concurrently and rapidly
  6. Then they spread Fiber Blankets (FB) 4‑layers (fig 2) one at a time on to the panels piercing the FAs. After spreading the 4-blanket layers they inserted the ceramic cup locks (CCL) keeping its top slot parallel to stud width all the way and on more pushing possible, they turned 90O. The CCL top locked in the stud slot and support the blanket sag free and efficiently insulate the roof from the flame and flue gases  
  7. Final mastic fill prevents cup-locks accidentally unlocking, heat conduction to the roof and strengthens FB securing.
repairs of welding cast refractory lined box over the hot spots
Figure 2

TA activities

Reformer Tubes were out of the reformer for new HK-40 RTs insertion. Technicians tore off the old roof and welded the lined panels to form the lined roof.

The 50-mm blanket protrusions beyond the panel sides butting into dense layer prevents hot flue gases wetting the roof plates at the joints assures cooler root top metal. After an area blanketed roof top completion, the crew moved to another far away area.

Other crews installed the new RTs and welded the outlet pigtails. They welded the inlet pigtails new flanges. The operation started filling catalysts in OPT welded RTs.

Roof crews packed fiber blanket pieces in the RT annuluses to prevent leaks, positioned 20 mm thick CS split cover halves, and tack welded to the roof metal.

Thus, many crews working simultaneously w/o interfering with one other in a coordinated manner completed the RT and Roof change in 14 record days. 

FB lining an existing good roof with RTs in position though not as easy and quick as above, is practical, cheaper, lot easier and quicker than cast blocks restoration and living with the expenses and hazards of frequent hot boxing.

Benefits of fiber blanket lining

Below listed are the benefits:

  1. Roof revamp took just 4-TA days only, against the most tightly estimated 30 days of conventional refractory lined roof
  2. It permitted new RTs insertion and catalyst fill concurrently
  3. Zero curing time and just a day of temperature ramp time saved further 5 days, i.e. total (30+5 -4=31) on stream days gain
  4. The rooftop looks elegant and plain thanks to no protruding studs and nuts. No stud holes leaks is a bonus benefit.
  5. 500C cold-face temperature against the former 70o C, saves recurring 16% energy i.e. hundreds of thousands of rupees of fuel costs yearly and eases working on reformer top – both invaluable benefits. Though the existing structure can easily support several more FB layers, we settled for 4 layers only, as more layers’ incremental cost was higher than the energy loss savings.   
  6. The 20% lower re-roofing costs over conventional refractory roof is an additional bonus
  7. Estimated service life is nearly 20 years with practically negligible maintenance; on the other hand, the refractory roof initial and ownership costs are very high             

Sidewall Refractory

The conventional sidewall refractory was in very good condition. The crew shutdown the reformer at two-year catalyst change intervals only. Hence, it stayed.

However, a much larger 1987-built Saudi 1500T/d Ammonia Plant reformer and a near equal-sized 1998 built world’s largest petroleum refinery reformer are FB lined all over – walls and roof.

Both perform exemplarily maintenance-free even after 5-years of their 20 years life expectancy. Their much lighter structural supports save 30 to 35% steel than that of the author re-roofed reformer.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Plug Valves Leaks
  • Rupture Discs bursts
  • Trip Throttle Valve RCA
  • Repeat Safety Valve Popping
  • Steam Letdown Station Problems
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Finned Tube Steam Leaks – Root Cause Analysis
Failing Weigh Feeders and Mechanical Variable Speed Drives (VSD)
Thermowell Shank to Flange Repeat Weld Leaks
Pressure Correction Pneumatic Instrumentation
Repeat Control Valve Plug Stem and Gland Leaks
Process Air Compressor too Frequent & too Lengthy Overhauls Eliminated
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

Compressor Anti-Surge Control near-miss incident
Pulverizer Electrical Problem Solved
Solving Control Valve Hunting: Instrument Troubleshooting
Pitot-tube Replaced with Innovative Segment Orifice Plate
Too Low-Temperature Readings after a Failed Thermocouple Change
Centrifugal Compressor near ½-RPM Frequency High Magnitude Shaft Vibrations
Less than 40% available Plant Air Compressors made available 100% for Operations
None Could Repair Slightly Damaged Magnetic Flow Meter Flow Tube
Multistage Flash Drums Erratic Level Readings
Aluminum Cable Terminations Repeat Failures

Keep Learning

Root Cause Analysis on Hunting of Control Valves

Hunting of Control Valves

Lightning Arrester Bursts Problem

Frequent Feeder-A Lightning Arrester (LA) Bursts – Root Cause Analysis

Rotary Drier Shell to Split Gear drive

Rotary Drier Shell to Split Gear drive eliminates too frequent drive failures

Poorly Built Switchgears

Poorly Built Switchgears – Why Breaker Parts Tear apart or don’t work?

NH3 Storage Tanks Ammonia Gas

NH3 Storage Tanks Ammonia Gas Venting Issue – Root Cause Analysis

Turbine Flow Meter (TFM) Field Calibration

Turbine Flow Meter (TFM) Field Calibration Uncommon Request

Doubtful Temperature Readings

Doubtful Temperature Readings threatens Soaking Pit Wrecks 

BP Refinery Explosion

Learnings from the BP Refinery Explosion at Texas City

Discover More

What is Barring Gear Logic? Why is it Required in the Steam Turbine?

Leaky Boiler Drum Level Switch

Leaky Boiler Drum Level Switch Stops NH3 Plant Commissioning

Types-of-diodes

Different Types of Diodes

Definitions of Electrical Grounding

Definitions of Electrical Grounding

Vacuum Circuit Breaker Principle

What is Vacuum Circuit Breaker?

Digital Electronics Multiple Choice Questions

Programmable Read Only Memory Objective Questions – Part 1

Non-variable reducing valves

What is Reducing Valve ?

PLC-Complete-Training-Package

Free PLC Training Software Download

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?