Inst ToolsInst ToolsInst Tools
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: CO2 Absorber Corroded Wall Thickness & Weld Building
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > CO2 Absorber Corroded Wall Thickness & Weld Building

CO2 Absorber Corroded Wall Thickness & Weld Building

Every turnaround (TA) done CO2 Absorber corroded wall thickness weld building – a perennial problem resolved.

Last updated: September 28, 2022 3:08 pm
S Raghava Chari
Root Cause Analysis (RCA) Process Fundamentals
No Comments
Share
4 Min Read
SHARE

Every turnaround (TA) done CO2 Absorber corroded wall thickness weld building – a perennial problem resolved.

Contents
ProblemAuthor immediate repairRoot Cause Identification and eliminationBenefits of the RCA solution
Article Type:Root Cause Analysis (RCA)
Category:Mechanical
Equipment Type:Pipelines and Miscellaneous Problems
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Problem

Continuous thickness monitoring identified CO2 absorber certain section was just 40 mm thick – discard thickness 36 mm for the operating pressure of 35 bars – against original 50 mm.

Author immediate repair

Fortunately nearly 1000 Kgs of 8-mm thick CS welding rods and radiation type stress relieving heaters procured for a canceled NH3 convertor job was available handy.

During the turnaround (TA), operators water washed the absorber internally, dried with hot air and handed it over for repairs.

The author got the absorber wall weld built and the welds ground as smooth as practical using several hired welding machines, hand held grinders, welders and grinding machine operators round the clock.

He took care to weld build a 2 m high 60o segment and weld built the diametrically opposite segment next to avoid absorber bending under heat.

This facilitated stress relieving the welded section while other sections are ground or welded i.e. many tasks proceeded simultaneously and saved turnaround (TA) time.

Root Cause Identification and elimination

The author pondered why so much corrosion despite using process licensor furnished corrosion inhibitor to make the corrosive K2CO3, the CO2 absorbing solution as non-corrosive catalytic K2CO3 solution.

An idea flashed after few days of thinking. He, asked in a joint plant problem solving meeting, “We do monitor all catalysts and schedule replacements at unacceptable activity levels; how come never of catalytic K2CO3?” The group laughed as if a silly joke!

Few days later a sheepish grinning tech services engineer, told the author, “Sir, you are right; I reviewed; the literature; it instructs rejuvenating the catalytic K2CO3 solution at > 100 ppm CO2 slip, by adding ‘rejuvenators’ a proprietary item the firm supplies;

Unfortunately, we overlooked it! In fact, this answers our years of lot higher CO2 slip, consequent higher methanator load, more purging and 2 to 3% lost ammonia production.

I guess the non-rejuvenation is excess CO2 slip and highly corroded absorber wall Root Cause”.

The author convened a meeting and let the tech services engineer present his idea. All felt low missing a vital link.

Benefits of the RCA solution

Rejuvenating the K2CO3 solution at CO2 slips >100 ppm at small cost, eliminated both the above-described ammonia production loss and vessel wall corrosion – both costing enormously.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Problems with Demister Pads
  • Steam Letdown Station Problems
  • Demineralization Mixed Bed Vessel
  • Screen Vibrators Perennial Problems
  • Urea Reactor Top Bolted Plug Leaks
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Recommended Articles

Cement kilns, Rotary Drum Driers Simplest Electrical Drive
Flame Arrester Principle
Pressurizer
8000 RPM 8000 kW Turbine Problem
Alternate 110 KV Connection to Feeder A
NH3 Storage Tanks Ammonia Gas Venting Issue – Root Cause Analysis
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Recent Comments

  • William Snyder on Top Non-PLC Certification Courses for Automation Professionals
  • Kamli on Top Free PLC Software
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals

Related Articles

Junction Box Cooler

Junction Box Internal Corrosion Problems and Solutions

Boiler Feed Water Heater Shell Flange Leaks

Boiler Feed Water Heater Shell Flange Leaks

Control Loop

What is a Control Loop ?

old Pressure Switches

Pressure Switch Frozen Screwed Cover Extends the Plant Shutdown

Deep-Bed Filter

Deep-Bed Filters

Target Flow Transmitter Problem

Target Flow Transmitters Failed the Very Midnight

What is a Dosing Pump? - Types, Advantages, Applications

What is a Dosing Pump? – Types, Advantages, Applications

Components of a Water Treatment Plant

Components of Water Treatment Plant

More Articles

How to Remove Control Valve Stem Packing Procedure

The Replacement Procedure for Control Valve Stem Packing

Power Electronics Objective Questions

Three Phase Converters Objective Questions

Pressure Control Loop

Pressure Control Loop Wiring Connections

What is Energy Monitoring System

What is Energy Monitoring System ?

Digital Electronics Multiple Choice Questions

BCD Adder Objective Questions

Float level gauge Principle

Float Type Level Indicator Principle

Generator Action in a Motor

What is Synchroscope ?

Field Instrument package

Package System Architecture – Control & Instrumentation

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?