Inst ToolsInst ToolsInst Tools
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Search
  • Books
  • Software
  • Projects
  • Process
  • Tools
  • Basics
  • Formula
  • Power Plant
  • Root Cause Analysis
  • Electrical Basics
  • Animation
  • Standards
  • 4-20 mA Course
  • Siemens PLC Course
Reading: CO2 Absorber Corroded Wall Thickness & Weld Building
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • Design
  • PLC
  • Interview
  • Control System
Search
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > CO2 Absorber Corroded Wall Thickness & Weld Building

CO2 Absorber Corroded Wall Thickness & Weld Building

Every turnaround (TA) done CO2 Absorber corroded wall thickness weld building – a perennial problem resolved.

Last updated: September 28, 2022 3:08 pm
S Raghava Chari
Root Cause Analysis (RCA) Process
No Comments
Share
4 Min Read
SHARE

Every turnaround (TA) done CO2 Absorber corroded wall thickness weld building – a perennial problem resolved.

Contents
ProblemAuthor immediate repairRoot Cause Identification and eliminationBenefits of the RCA solution
Article Type:Root Cause Analysis (RCA)
Category:Mechanical
Equipment Type:Pipelines and Miscellaneous Problems
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Problem

Continuous thickness monitoring identified CO2 absorber certain section was just 40 mm thick – discard thickness 36 mm for the operating pressure of 35 bars – against original 50 mm.

Author immediate repair

Fortunately nearly 1000 Kgs of 8-mm thick CS welding rods and radiation type stress relieving heaters procured for a canceled NH3 convertor job was available handy.

During the turnaround (TA), operators water washed the absorber internally, dried with hot air and handed it over for repairs.

The author got the absorber wall weld built and the welds ground as smooth as practical using several hired welding machines, hand held grinders, welders and grinding machine operators round the clock.

He took care to weld build a 2 m high 60o segment and weld built the diametrically opposite segment next to avoid absorber bending under heat.

This facilitated stress relieving the welded section while other sections are ground or welded i.e. many tasks proceeded simultaneously and saved turnaround (TA) time.

Root Cause Identification and elimination

The author pondered why so much corrosion despite using process licensor furnished corrosion inhibitor to make the corrosive K2CO3, the CO2 absorbing solution as non-corrosive catalytic K2CO3 solution.

An idea flashed after few days of thinking. He, asked in a joint plant problem solving meeting, “We do monitor all catalysts and schedule replacements at unacceptable activity levels; how come never of catalytic K2CO3?” The group laughed as if a silly joke!

Few days later a sheepish grinning tech services engineer, told the author, “Sir, you are right; I reviewed; the literature; it instructs rejuvenating the catalytic K2CO3 solution at > 100 ppm CO2 slip, by adding ‘rejuvenators’ a proprietary item the firm supplies;

Unfortunately, we overlooked it! In fact, this answers our years of lot higher CO2 slip, consequent higher methanator load, more purging and 2 to 3% lost ammonia production.

I guess the non-rejuvenation is excess CO2 slip and highly corroded absorber wall Root Cause”.

The author convened a meeting and let the tech services engineer present his idea. All felt low missing a vital link.

Benefits of the RCA solution

Rejuvenating the K2CO3 solution at CO2 slips >100 ppm at small cost, eliminated both the above-described ammonia production loss and vessel wall corrosion – both costing enormously.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Problems with Demister Pads
  • Steam Letdown Station Problems
  • Demineralization Mixed Bed Vessel
  • Screen Vibrators Perennial Problems
  • Urea Reactor Top Bolted Plug Leaks
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Rotary Drier Shell to Split Gear drive eliminates too frequent drive failures
Phosphate Dozing System Problems
Arc Fault Breaker (AFB) Electrical Problem Solved
Instrument Steam Pressure Taps Primary Block Valves Glands and Bonnets Leaks
Thermocouple Extension Lead Problem
Gas Cooler Re-tubing Done Successfully (Root Cause Analysis)
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
210kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

Strainers
Poorly Built Switchgears – Why Breaker Parts Tear apart or don’t work?
Deep-Bed Filters
Seal Pressure Instruments Root Cause Analysis
Compressor Anti-Surge Control near-miss incident
Minimum Oil Circuit Breaker (MOCB) No Vendor Spares & Service
Centrifugal Compressors
Multistage Flash Drums Erratic Level Readings

Keep Learning

Antifriction bearings (AFB) Problems

Antifriction bearings (AFB) Problems and Delays Plant Restarts

Instrumentation Engineering Root Cause Analysis

Instrumentation Engineering Problems Solved – Root Cause Analysis

Target Flow Transmitter Problem

Unreliable Ammonia Flow Transmitter Reading and Problems

Valve Actuator Passing

Lessons Learned from Actuator Passing Incidents

Repeat Safety Valve Popping

Repeat Safety Valve Popping caused Urea Plant Shutdown

Pumps Quiz

Pumps Quiz

Single-Acting Air Compressor Cylinder

Reciprocating Compressors

Types of Heat Exchangers

Types of Heat Exchangers

Learn More

Tank car bonding at siding

Electrical Static Grounding Techniques

Pressure Switch Questions

Pressure Switch Questions

Power Systems Questions & Answers

Power Systems MCQ Series 16

NO NC Contact Animation

Equivalent Logic Gates using PLC Ladder Diagrams

What is NEST loading=

What is Nest Loading? – DCS and PLC Control Systems

Coriolis mass flowmeter Density Measurement

How Coriolis Mass Flow Meter Measure Density?

Determine Voltage Drops at Respective Flow Rates

Determine Voltage Drops at Respective Flow Rates in Loop Diagram

Float Level Switch Principle

Float Level Switch Working Principle Animation

Menu

  • About
  • Privacy Policy
  • Copyright

Quick Links

  • Learn PLC
  • Helping Hand
  • Part Time Job

YouTube Subscribe

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?