Inst ToolsInst ToolsInst Tools
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Search
  • Books
  • Software
  • Projects
  • Process
  • Tools
  • Basics
  • Formula
  • Power Plant
  • Root Cause Analysis
  • Electrical Basics
  • Animation
  • Standards
  • 4-20 mA Course
  • Siemens PLC Course
Reading: Alternate 110 KV Connection to Feeder A
Share
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • Design
  • PLC
  • Interview
  • Control System
Search
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > Alternate 110 KV Connection to Feeder A

Alternate 110 KV Connection to Feeder A

Electrical engineering root cause analysis (RCA) related to Alternate 110 KV connection to Feeder A.

Last updated: September 28, 2022 3:08 pm
S Raghava Chari
Root Cause Analysis (RCA)
No Comments
Share
2 Min Read
SHARE

Electrical engineering root cause analysis (RCA) related to Alternate 110 KV connection to Feeder A.

Contents
Alternate 110 KV Connection ProblemThe job done finallyAlternative 110 KV Supply Benefits
Article Type:Root Cause Analysis (RCA)
Category:Electrical
Equipment Type:Bus ducts, Switchgear, Transformers,
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Alternate 110 KV Connection Problem

The State Electricity Board (SEB) had tapped both Feeder-A and Feeder-B from a certain thermal station bus (TSB). This resulted in no power supply to the plant during TSB Maintenance Shutdowns.

The plant had paid a huge sum to provide an alternate connection to Feeder‑A to avoid total electrical outage to the plant. Years rolled on. However, the project remained in the paper only!

The job done finally

During the national internal emergency, the author agreed to loan materials to the board for their rush work, only after completing the plant’s above long overdue project. They did the job this time!

Alternative 110 KV Supply Benefits

Thanks to this, plant gets uninterrupted power even during the TSB maintenance.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Insulation Resistance (IR) Problems
  • Failing Weigh Feeders and Drives
  • Transformers Coolers Problems
  • Motor Rampant Winding Burnout
  • Frequent Lightning Arrester Bursts
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Heat Exchanger Tubes Corroded Root Cause Analysis
Compressor IP Case Discharge Temperature Gradually Increases
Ammonia Flash Vessel All Level Instruments Stopped Working
Serious Constraints Prevent using an Available Turbine Flow Meter
Compressor Cracked Shaft Spacers
Failed Letdown Valve Shuts down a Urea Plant Several Hours
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
210kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

CO2 Stripper Collapsed Internals Revamp
Wrong Operation Internals Destroyed Demineralization Mixed Bed Vessel
Plant Shutdown Analysis: Valve Closed and SOV Coil Failure
A Large Gate Valve’s Failed Motorized Operation
11 KV Bus A to Bus B Phase Check Problem
Junction Box Internal Corrosion Problems and Solutions
Thermowell Shank to Flange Repeat Weld Leaks
HT Motor Problem appears after Disassembly and Reassembly

Keep Learning

Weigh Feeder Drive

Failing Weigh Feeders and Mechanical Variable Speed Drives (VSD)

old Pressure Switches

Pressure Switch Frozen Screwed Cover Extends the Plant Shutdown

Steam Letdown Station Problems

Steam Letdown Station Problems and their Solutions

Welding Machine Fail in Dusty and Corrosive Areas

Welding Machine Fail in Dusty and Corrosive Areas

Cooling Water Circulating Pump Low throughput

Cooling Water Circulating Pump Low throughput Resolved

Damaged Magnetic Flow Meter Flow Tube

None Could Repair Slightly Damaged Magnetic Flow Meter Flow Tube

Captive Power Plant Trip Root Cause Analysis

Captive Power Plant Trip Root Cause Analysis

Innovative Segment Orifice

Stuck Segment Orifice Dimensions Calculations

Learn More

ORP Measurement

Basics of ORP Measurement

thermocouple voltages

Manually Interpreting Thermocouple Voltages

Smart Drip Irrigation System Using PLC

Scheduled Daily Plant Watering PLC Program

On Delay Timer TON in Tia Portal

Timers in PLC Programming – Siemens Tia Portal Tutorials

Calculate Amount of Weight Indicated by the Scale

Calculate Amount of Weight Indicated by the Scale

Communication between Factory IO and Siemens Tia Portal

Communication between Factory IO and Siemens Tia Portal

Power Electronics Objective Questions

Power Electronics Diode Circuits Quiz

Instrumentation and Control Course

Free Instrumentation Course for Trainee Engineers

Menu

  • About
  • Privacy Policy
  • Copyright

Quick Links

  • Learn PLC
  • Helping Hand
  • Part Time Job

YouTube Subscribe

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?