Inst ToolsInst ToolsInst Tools
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
Search
  • Books
  • Software
  • Projects
  • Process
  • Tools
  • Basics
  • Formula
  • Power Plant
  • Root Cause Analysis
  • Electrical Basics
  • Animation
  • Standards
  • 4-20 mA Course
  • Siemens PLC Course
Reading: Monsoon Protection for Field Instruments and Junction Boxes
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • Design
  • PLC
  • Interview
  • Control System
Search
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Erection & Commissioning > Monsoon Protection for Field Instruments and Junction Boxes

Monsoon Protection for Field Instruments and Junction Boxes

You will learn about the monsoon protection activities carried out by an instrumentation engineer for field Instruments and Junction Boxes.

Last updated: May 29, 2022 11:49 am
Editorial Staff
Erection & Commissioning Instrumentation Design
No Comments
Share
5 Min Read
SHARE

Every Instrumentation engineer attends to problems of field instruments as well as control systems in day-to-day life. Industrial problems keep on changing with time and thus their solutions also.

But every Instrumentation engineer does one common job every year i.e. Monsoon Protection job for instruments and other equipment in the field.

It seems a very easy task but still, we see problems due to improper monsoon protection on Instruments or a junction box or others.

Monsoon Protection for Field Instruments

Let us discuss the monsoon Protection job details. We will discuss what things to be taken care of while doing the monsoon protection job from an instrument engineer. 

1) Ensure all transmitters, analyzers and junction boxes are having proper canopy. 

2) Ensure all transmitters and analyzers covers are properly protected with silastic. Here silastic is nothing but a flexible silicone rubber.

3) The junction boxes should also be protected with silastic.

For points 2 and 3 you can also use Monsoon Tape (Aluminium tape). 

4) If any bolts on junction boxes are missing, try to put them or if not available, then cover the missing bolt hole with silastic and ensure junction boxes are properly closed.

Junction Box with Canopy and Silastic

Else try to arrange bolts as soon as possible and fix them. Because if the junction box cover is slightly open, then moisture can definitely go inside and create problems.

(Note: We use two types of bolts on the junction boxes which are hex and allen)

5) If any spare cable entry holes are found, then use a proper blind there. Also, apply silastic on the blind to ensure proper sealing.

Silastic

6) For all cables entering the junction box, ensure that the respective cable gland is not loose. Proper silastic is a must requirement.

7) Cable glands in the transmitter, analyzer, and valves should be tight, and also silastic should be properly applied to them.

8) We use stanchions or support stands for all transmitters, analyzers, and junction boxes installation and those stands must be stiff.

Sometimes corroded support stands break during wind blowing in monsoon. So, if found issues in the support stand, immediately replace them.

Monsoon Protection for Field Instruments and Junction Boxes

9) DP type transmitter may be used for measuring level or pressure. If there is any reference tapping point open towards atmospheric pressure then it should be specially taken care of.

The tapping in the atmosphere should not be in an open area. The monsoon water may enter the tapping point if it is open and it may affect the measurement.

The tapping point should face downward (towards the ground) so that water from rain or due to wind does not go inside the impulse tube. Also, for such impulse tubes at the end, a filter should be attached for protection against bugs.

10) Some valves may fail open and some fail close. So, one port will be open to the atmosphere.

Now if the port is facing toward the ground, then there is no issue. Only a bug arrestor is sufficient for the port facing the ground.

But if the port is facing the sky, then only the bug arrestor will not help. One should use an inverted U-like impulse tube there and point its face towards the ground. This way the rain water will not go into the actuator.

Most important things to keep in mind

  • Always prepare sufficient stock of silastic and monsoon tape before the monsoon session.  Also, keep necessary stocks that can be used throughout the year for day-to-day use.
  • Properly dump the waste. Don’t throw used monsoon tape and silastic here and there.

If you liked this article, then please subscribe to our YouTube Channel for Electrical, Electronics, Instrumentation, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • What is Pump Cavitation?
  • Compressor Control System
  • pH Analyzer Do’s and Don’ts
  • Transformer Testing Procedure
  • Bently Nevada Vibration System
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

What is Double Block and Bleed Valves?
Detail Design Engineering Competency Aspects
Important Factors Consider during Piping Design
Response Time Test of RTD and Thermocouple
Thermowell Outer Diameter Larger than Nozzle Inside Diameter?
Remote Seal Transmitters Temperature Error
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

History of 3-15 psi, 10-50 mA, and 4-20 mA signals
How to Select a pH or ORP Meter
Installation and Calibration of Pressure Transmitter
I&C Engineer Roles & Responsibilities – Instrumentation Design
Why We use Shielded Cable and Twisted Pair Cables ?
Instrumentation and Electrical Teams Interactions (Detail Design Engineering)
Motor Control Signal Interface
Difference Between a Flow Control & a Needle Valve

Keep Learning

Pneumatic Piping Design and Specification

Pneumatic Piping Design and Specification

Instrument Process Datasheet

Why is an Instrument Process Datasheet Required?

Instrumentation and Control (I&C) Design

Instrumentation and Control (I&C) Design

Instrumentation Project Documents

List of Instrumentation Project Engineering Documents

Hook-up Diagram for Pressure Gauge

What is Instrument Hook Up Diagram ?

Controller Output Current Loop

DCS Controllers to Output Current Loops

Voting System in PLC

Voting Concept in Package Safety System

Basics of Thermistors, Thermocouples and RTD's

Basics of Thermistors, Thermocouples and RTD’s

Learn More

Tomography Objective Questions

Tomography Objective Questions

How to Update the Firmware Version of your PLC

How to Update the Firmware Version of your PLC? – TIA Portal

Closed-tank-DP-Level-Transmitter-with-cleaning-leg-Calibration

Closed tank DP Level Transmitter with cleaning leg Calibration

What is a Servo Valve?

What is a Servo Valve? – Principle and Advantages

Induction Motor Interview Questions Answers

Electrical Measurements and Instrumentation Objective Questions & Answers

Siemens SIMATIC S7 PLC GSD File

How to import GSD files into the TIA Portal? – Siemens PLC

Real-time and historical SCADA Trends

What are Trends in SCADA?

Induction Motor Protection Interview Questions

Induction Motor Protection Interview Questions Answers

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?