Inst ToolsInst ToolsInst Tools
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: Reformer Fan Bearing Change Times cut by 90%
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > Reformer Fan Bearing Change Times cut by 90%

Reformer Fan Bearing Change Times cut by 90%

Root Cause Analysis (RCA) provides a solution to Reformer Fan Bearing Change Times cut by 90%.

Last updated: September 28, 2022 3:19 pm
S Raghava Chari
Root Cause Analysis (RCA)
No Comments
Share
3 Min Read
SHARE

Root Cause Analysis (RCA) provides a solution to Reformer Fan Bearing Change Times cut by 90%.

Contents
Fan Bearing Change Times cut by 90%Author SolutionThe study-based solution Benefits
Article Type:Root Cause Analysis (RCA)
Category:Mechanical
Equipment Type:Miscellaneous Rotating Machine Problems
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Fan Bearing Change Times cut by 90%

Unbolt the over 250 Nos. 10 mm dia casing bolts

Position a crane suitably before plant shutdown (SD), after SD lift the casing upper half (above figure), place it nearby; lift the rotor 20 mm using a chain pulley block suspended from crane hook for Antifriction bearings (AFB) pull out; change the failed AFB, assemble back, etc.

Author Solution

Though the crew assured the instruction manual offered no easier bearing changing method, the author felt designers would have envisaged an easier bearing changing method:

Reformer Fan Bearing Change Times cut by 90%

He carefully viewed the fan 10 minutes and suggested to replace the AFBs thus:

  1. Arrange bearing pullers and electric bearing heaters close by before fan SD.
  2. Unbolt both side Pillow Block’s upper halves
  3. Unbolt both sides the top ½ ring bolted to the fan entry filter
  4. Lift the fan rotor with a crane carefully and slowly till it contacts the casing top; the rotor tip to case bore distance is usually sufficiently large and bearing OD will be clear the pillow block step
  5. With the crane holding the rotor, replace both the bearings.
  6. Lower the rotor carefully and guide both end AFBs into the pillow block seat
  7. Mallet tap the shaft and seat the both end AFBs in the pillow block
  8. Tighten Pillow Block top halves. The fan is ready for use! Just 2 hours task- not 2 shifts i.e., 16 hours.

The study-based solution Benefits

The plant resumed full capacity production within 3 hours and with just a few easy maintenance efforts and needless 13 hours ½ capacity runs.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Dozing System Problems
  • Pump Low throughput Eliminated
  • Fan Motor Journal Bearing Failures
  • Turbine to Gearbox Alignment Drifts
  • Storage Tanks Ammonia Gas Venting Issue
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Seal Level Differential Pressure Transmitter Problems
Fan Motor Frequent Journal Bearing Failures Posed Plant Outages
How Kalrez O-rings Seal So effectively So Long?
Frequent Feeder-A Lightning Arrester (LA) Bursts – Root Cause Analysis
30 Electrical Engineering Problems – Root Cause Analysis
Fired Boiler Induced Draft Fan (IDF) Failures Upset all Plants Operations
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

Pump 3-monthly Seal Leaks threaten entire Plant Shut down Indefinitely
Mechanical Temperature Indicators (MTI) Problem
Phosphate Dozing System Problems
Control Valve Passing Problem after Overhauling Job
Heat Exchanger Tubes Corroded Root Cause Analysis
Turbine Flow Meter (TFM) Field Calibration Uncommon Request
Too often done riskily repaired Roof Hot Spots eliminated forever
Compressor Cracked Shaft Spacers
Primary Reformer – Each Turnaround done expensive Tubes Repairs
Rotary Granulator Drive Root Cause Analysis (RCA)

Keep Learning

Replace Failed Motors Quickly and Easily

Replace Failed Motors Quickly and Easily

Plant Shutdown Analysis: Valve Closed and SOV Coil Failure

Plant Shutdown Analysis: Valve Closed and SOV Coil Failure

Minimum Oil Circuit Breaker (MOCB) Spares & Service

Minimum Oil Circuit Breaker (MOCB) No Vendor Spares & Service

Leaking Plug Valves pose Safety Hazards and Lead to Plant Shutdown

Leaking Plug Valves Pose Safety Hazards and Lead to Plant Shutdown

Bucket Elevator Wrecks

Many Bucket Elevator Wrecks rob crew morale

Control Panel Instruments

Control Panel Instruments Problem Threatened Plant Shutdown

Recurring Short Circuit Flash Overs Safety Hazards

Recurring Short Circuit Flash Overs Safety Hazards & Damages

Compressor IP Case Discharge Temperature Gradually Increases

Compressor Anti-Surge Control near-miss incident

Discover More

Process Control Instrumentation Objective Questions

Process Control & Instrumentation Objective Questions – Set 4

Types of Instructions in PLC Programming

Types of Instructions in PLC Programming

Pollution Monitoring Instruments Questions and Answers

Nitrogen Oxides Questions & Answers

Instrumentation Books Free Download

Lessons in Industrial Instrumentation

Analog Electronics Objective Questions

Analog Electronics Objective Questions – Set 6

PLC Programming Course Online Free

PLC Programming Course Online Free

Nuclear Level Measurement

Nuclear Level Detectors Cascade or Master/Slave concept

Switched Mode Power Supply (SMPS)

How does SMPS Works? – Switched Mode Power Supply

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?