Inst ToolsInst ToolsInst Tools
  • Ask
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: Urea Reactor Top Bolted Plug developed Leaks
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Ask
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > Urea Reactor Top Bolted Plug developed Leaks

Urea Reactor Top Bolted Plug developed Leaks

After several years of service the urea reactor top bolted plug developed leaks. This root cause analysis solved the problem.

Last updated: September 28, 2022 3:08 pm
S Raghava Chari
Root Cause Analysis (RCA)
No Comments
Share
4 Min Read
SHARE

After several years of service the urea reactor top bolted plug developed leaks. This root cause analysis solved the problem.

Contents
Urea Reactor Top Bolted Plug LeaksCrew’s leak stop attemptRepair Attempts
Article Type:Root Cause Analysis (RCA)
Category:Mechanical
Equipment Type:Pipelines and Miscellaneous Problems
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Urea Reactor Top Bolted Plug Leaks

After several years of service the urea reactor 400 mm, dia x 280 mm thick top bolted plug (fig A) developed leaks.

Tightening the studs loads the 30o included angle plug (fig B) and the 20o included angle reactor body opening conical portion line contact resulting in leak tight joint.

Crew usually repair such leaks by lapping the plug cone and reactor opening cone with a cast iron lap paste smeared lap block.

Usually the task takes several shutdown days. Since, the minor leak posed neither serious safety nor environment hazard; the plant lived with the leak awaiting a suitable repair opportunity.

Reactor Opening & Plug
Fig A

Crew’s leak stop attempt

Crew leader showed the CI lapping block showing only cone to lap the reactor 20o included angle opening using the reactor drawing given information (fig B), and another lap block for lapping the 30o plug sketch.  

The author appreciated the crew leader sketch. In addition, he suggested cutting the plug cone-lapping portion also on the same block to save costs. The lapping block was ready in few days.

Reactor Top lid lapped
Fig B

Repair Attempts

Severe draught forced an indefinite plant shutdown. The crew started the task. The leader reported two days later that two nos. cover studs defy unscrewing from the reactor body even with violent efforts. It would prevent Tommy bar Clockwise (CW) and CCW lap block rotation. Hence, lapping has not yet started.

The author chided himself for overlooking this possibility when he reviewed the lap block sketch.

He educated the crew to avoid unscrewing studs from vessels and valves as this could damage the body threads. Their repair is lengthy and time taking and often beyond field crew’s resources.

Site visit and few minutes thinking flashed him an idea: just drill a hole in the lapping block center and tighten a long stem to accept the Tommy bar well above the studs (fig B). Often site visits will generate ideas, which sometimes don’t occur on the office table drawing studies.

The crew lapped the reactor seat with the tall stem fitted lap block. They removed the stem, inverted the lap block and lapped the plug also. The entire task was over in a week working general shift hours only.

Operation crew 300 bars hydro-tested reactor with chlorides free condensate using the air operated piston pump that came with the plant. No leaks cheered all.

In addition, the crew learned the evils of violently unscrewing studs from vessel and valve bodies.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Gas Cooler Re-tubing
  • Rotary Granulator Drive
  • Problems with Demister Pads
  • Steam Letdown Station Problems
  • Bucket elevators Chain Problems
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !
Supplied Screen Vibrators Perennial Problems
Erratic Stroking Control Valves Delaying the Shutdown Plant Restart
Transformers Coolers Weld Joints Oil Oozes Were Eye Sores
Compressor Cracked Shaft Spacers
Rotary Drier Shell to Split Gear drive eliminates too frequent drive failures
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Recent Comments

  • Kamli on Top Free PLC Software
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • MIHARITSOA Aina Sitraka on Top Non-PLC Certification Courses for Automation Professionals

Related Articles

Modern Cement Kiln Drive

Cement kilns, Rotary Drum Driers Simplest Electrical Drive

Steam Turbine Driven Centrifugal Compressors Leak due to Broken Instrument

Discharge Head 3‑monthly leaks of Steam Turbine Driven Centrifugal Compressors

Erratic H2 Flow Rotameter

Erratic H2 Flow Rotameter

Totally Enclosed Fan Cooled (TEFC) Motor

Totally Enclosed Fan Cooled (TEFC) Motors Rampant Winding Burnouts

Multistage Flash Drums Erratic Level Readings

Multistage Flash Drums Erratic Level Readings

Pipe Elbow Sudden Burst

A Pipe Elbow Sudden Burst Fatalities and Wrecked Panel Instrumentation

Turbine to Gearbox Alignment Drifts Caused Pump Transfers Problems

RCA Related to Trip Throttle Valve (TTV)

Junction Box Cooler

Junction Box Internal Corrosion Problems and Solutions

More Articles

Pressure gauge mechanism

How Measurement Span of Pressure Gauge Could be Changed?

Robotic Automation

Robotic Process Automation (RPA) in AI – Market Growth & Business Benefits

Configuration of Siemens VFD Using TIA Portal

Configuration of Siemens VFD Using TIA Portal Start drive

C programming language

What is C Programming Language? Fundamentals, Pros & Cons

Rewire Tool

What is Rewire Tool in Simatic Manager?

Sensor Based Projects List - Electronics & Electrical

350+ Sensor-Based Projects List – Electronics & Electrical

feedforward control theory

Proportioning Feedforward action

Computer Science and Technology Certifications

Computer Science and Technology Majors Certifications

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?