Inst ToolsInst ToolsInst Tools
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Search
  • Books
  • Software
  • Projects
  • Process
  • Tools
  • Basics
  • Formula
  • Power Plant
  • Root Cause Analysis
  • Electrical Basics
  • Animation
  • Standards
  • 4-20 mA Course
  • Siemens PLC Course
Reading: Supplied Screen Vibrators Perennial Problems
Share
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • Design
  • PLC
  • Interview
  • Control System
Search
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > Supplied Screen Vibrators Perennial Problems

Supplied Screen Vibrators Perennial Problems

Home developed motor vibrators lot better than provided vibrators boost safety and production.

Last updated: September 28, 2022 3:15 pm
S Raghava Chari
Root Cause Analysis (RCA)
No Comments
Share
2 Min Read
SHARE

Home developed motor vibrators lot better than provided vibrators boost safety and production.

Contents
Screen VibratorsAuthors Solution
Article Type:Root Cause Analysis (RCA)
Category:Mechanical
Equipment Type:Pipelines and Miscellaneous Problems
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Screen Vibrators

The product screens came with linear motion vibrators actuated by an I-shaped core attracted and released by E-shaped fixed laminated block, powered by electrical pulses provided by a solidstate electronic circuit. Such vibrators required very precise adjustments and locking.

At such vibration frequencies, the adjustments worked loose and necessitated frequent adjustments, which is extremely difficult in the high ambient temperature and pungent ammonia odorous screen room.

As a result screen availabilities were poor affecting production significantly.  

Authors Solution

The author replaced the entire E/I core vibrators with motorized vibrators.

The rotor shaft carries adjustable eccentric weights because of which rotor rotation vibrates. Suitable links and spring transmit the motor vibration to the screen.

Supplied Screen Vibrators Perennial Problems

Thanks to the high reliability of the motorized vibrators production limitations vanished and plant produced at far higher than rated capacities.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Gas Cooler Re-tubing
  • Rotary Granulator Drive
  • Problems with Demister Pads
  • Steam Letdown Station Problems
  • Bucket elevators Chain Problems
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Erratic Stroking Control Valves Delaying the Shutdown Plant Restart
Turbine to Gearbox Alignment Drifts Caused Pump Transfers Problems
Transformers Coolers Weld Joints Oil Oozes Were Eye Sores
Target Flow Transmitters Failed the Very Midnight
Flanged Rotameter Caused Pipe Weld Cracks and Gives Wrong Readings
Totally Enclosed Fan Cooled (TEFC) Motors Rampant Winding Burnouts
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
210kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

Reformer Fan Bearing Change Times cut by 90%
Plant Shutdown Analysis: Valve Closed and SOV Coil Failure
Condensate Pump Frequent Wrecks Threatens Long Plant Outages
Lessons Learned from Actuator Passing Incidents
Control Panel Instruments Problem Threatened Plant Shutdown
Seawater Pipeline Spools from day-1 leaks threaten Plant Shutdown
Stuck Segment Orifice Dimensions Calculations
Plant Air Storage Tank Pressure Fluctuations Root Cause Analysis

Keep Learning

Compressor IP Case Discharge Temperature Gradually Increases

Compressor Anti-Surge Control near-miss incident

Captive Power Plant Trip Root Cause Analysis

Captive Power Plant Trip Root Cause Analysis

CO2 Absorber Graphics in DCS

CO2 Absorber Corroded Wall Thickness & Weld Building

Unstable & Drifting Values of Differential Pressure Transmitter

Unstable & Drifting Values of Differential Pressure Transmitter Problem

HT motors Corrosion Problem

HT motors Corrosion Problem

Magnetic Flow Meter Liner Damaged

Magnetic Flow Meter Liner Damaged and Winding Burnt

Erratic Radar Level Gauges

Erratic Radar Level Gauges Delays a Refinery Commissioning

Pipe Elbow Sudden Burst

A Pipe Elbow Sudden Burst Fatalities and Wrecked Panel Instrumentation

Learn More

Pneumatic Valves and Cylinders Sizing

Pneumatic Valves and Cylinders Sizing – Part 1

Landline Telemetry Objective Questions

Landline Telemetry Objective Questions

Difference Between Earth and Neutral

Difference Between Earth and Neutral

circuit-breaker-interview-questions-answers

Circuit Breaker Interview Questions & Answers

Difference Between Adhesion and Cohesion

Difference Between Adhesion and Cohesion

Oscillating Piston Flow Meters Animation

Oscillating Piston Flow Meters Working Principle

Analog Indicators Objective Questions

Analog Indicators Objective Questions

Siemens PLC

#20 PLC Best Practices – Identify Critical Alerts

Menu

  • About
  • Privacy Policy
  • Copyright

Quick Links

  • Learn PLC
  • Helping Hand
  • Part Time Job

YouTube Subscribe

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?