Inst ToolsInst ToolsInst Tools
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Search
  • Books
  • Software
  • Projects
  • Process
  • Tools
  • Basics
  • Formula
  • Power Plant
  • Root Cause Analysis
  • Electrical Basics
  • Animation
  • Standards
  • 4-20 mA Course
  • Siemens PLC Course
Reading: Grounding of Telecommunication Systems
Share
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • Design
  • PLC
  • Interview
  • Control System
Search
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Control Systems > Grounding of Telecommunication Systems

Grounding of Telecommunication Systems

Last updated: October 22, 2019 2:25 pm
Editorial Staff
Control Systems
1 Comment
Share
6 Min Read
SHARE

When a metallic mesh is embedded in the structural concrete subfloor, it may be used for an electronic signal reference grid (SRG). When this is done the problem becomes how to make connections to the SRG. The typical approach is to embed a ground plate at each intersection of the SRG’s conductors, but on a spacing of around 2×2 or 4×4 feet square. This conforms to the standard practices for SRGs such as those used in conjunction with a computer room’s cellular raised floor.

Contents
GroundingSome Further Thoughts on Networked Workstation EquipmentSuggestion #1Suggestion #2Suggestion #3Grounding of Telecommunication Systems

In other cases where connection points on 2-foot centers are not needed, a ground connection plate per Figure may be installed wherever necessary. The exposed surface of the embedded stud or tie-plate is then used to make connections to and from the SRG that is below the surface of the concrete.

Grounding

Grounding of Telecommunication Systems

Note that for electrical equipment and mechanical equipment rooms, spacings of 2×2 feet are often closer than is needed— especially if the floorplan is known in advance. In these cases the concrete embedded SRG studs or ground plates are installed to place them close to the equipment that is planned to be permanently installed in the room. Spacings of around 4 to 6 feet square are common in these kinds of cases.

The concrete floor embedded SRG is often combined with the steel reinforcing bar system that is installed in the poured concrete. In some cases where the reinforcing steel system is welded together, it can serve as the actual SRG, otherwise the reinforcing steel is simply periodically welded to the SRG at those points where the two structures have nearby or intersecting elements.

Some Further Thoughts on Networked Workstation Equipment

Workstations that are part of a network and use Local Area Network (LAN) interface plug-in cards or modems, or are connected to servers, printers, or similar peripheral devices that are not located at the workstation, typically need special attention to be paid to how they are grounded so that common-mode noise will not be a significant problem with their operation.

Accordingly, here are some suggestions:

Suggestion #1

Provide an externally applied supplementary equipment grounding conductor network that is connected to each item of the workstation and to the “greenwire” of the branch circuit(s) serving the workstation.

Suggestion #2

If there is any excess length in the ac power line cords or data signal cables used to connect the workstation’s equipment to the branch circuit or network’s signal circuits, loop the excess into a small coil whose loops are secured by tie-wraps or plastic electrical tape.

This creates a “choke” effect that can reduce the higher frequency common-mode noise currents in the path to which the technique is applied, and without affecting the power or signal transport process. Observe bending radius limits of conductors to avoid overstressing the insulation or causing excessive heat rise.

Suggestion #3

Electromagnetic Interference (EMI) in the form of coupled radio waves into signal cables, is not a common problem in most installations.

However, it is not an unknown problem either, especially if the source of the EMI is located close to the affected cable and its served circuits. Where interference with low-level signal processes is encountered and if traced to EMI at radio frequencies such as from a radio transmitter or some other industrial process occurring at radio frequencies, additional signal cable shielding and in extreme cases signal filtering at the cable’s ends, may need to be provided on the affected circuits.

The application of such filters may need to be carried out inside of the related equipment, so close involvement of the equipment’s original manufacturer (OEM) is very important.

Grounding of Telecommunication Systems

Grounding of telecommunications systems, such as voice and data grade telephone circuits, has become a well defined area of grounding.

The rules are explicit. If not followed, the systems will be more sensitive to noise disturbances.

As with other forms of electronic systems grounding, there is no conflict between a safe system and a reliable one. In all cases, the NEC’s requirements fully apply to all aspects of the telecommunications wiring.

The proper installation of telecommunications circuits is generally beyond the scope of this document, but some helpful references are provided as follows:

(1) ANSI/EIA/TIA Standard 569A-1997 Commercial Building Telecommunications Cabling Standard

(2) ANSI/EIA/TIA Standard 569-1990, Commercial Building Standard for Telecommunications Pathways and Spaces

(3) ANSI/EIA/TIA Standard 570-1991, Residential and Light Commercial Telecommunications Wiring Standard

Do you face any problems with grounding? Share with us.

Reference: erico

Read Next:

  • Importance of Grounding System
  • What is a Ground Detector?
  • Neutral Grounding in Power System
  • Step and Touch Potential in Ground
  • Cable Fault Identification Methods
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Electrical Drives – Modes, Types, Speed Control Applications
Feedforward Control with Dynamic Compensation
What is a Active Barrier ?
Boiler Three Element Controller Philosophy
Waste Water Control System
What is Feedforward Control ?
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
1 Comment
  • AVINASH SHINDE says:
    October 23, 2019 at 9:37 am

    Dear Team

    Very good information sharing regarding the Grounding on various system
    Thanks for the same.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
210kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

SCADA Systems
What is Energy Monitoring System ?
How to Do Loop Checks During Plant Pre-Commissioning
Split Range Control Working Principle
Single Loop Controller Questions
Integrating Processes – Liquid Level Control
Difference Between the Sinking and Sourcing?
What is Timeout in Communication Protocols?

Keep Learning

Hot Well Level Control System in Condensing Turbine

Hot Well Level Control System in Condensing Turbine

How to choose between PLC and DCS Systems

How to choose between PLC and DCS Systems ?

Steady-state process gain

Steady-State Process Gain

Electrical and Instrument Engineers Job Profile

Instrumentation and Electrical Teams Interactions (Detail Design Engineering)

Instrumentation and Control (I&C) Design

Instrumentation and Control (I&C) Design

DCS Marshalling Cabinet Checks

PLC, DCS, and ESD Marshalling Cabinet Checks

Derivative Controller Response

Derivative Controller Principle

Why 4-20 mA Current Signal is used instead of Voltage Signal

Troubleshooting a 4-20mA Current loop

Learn More

PLC SCADA Water Pump

PLC Program for Controlling a Water Pump with 3 Power Sources

Distribution transformer

Different Types of Transformers

Magnetostrictive Transducers Objective Questions

Magnetostrictive Transducers Objective Questions

Electrical Machines Questions and Answers

Measurement of Xd and Xq – Synchronous Machine

Level Measurement Objective Questions

Level and Density Measurement Objective Questions

Remote User Authentication

Security of Industrial Automation Systems

Gas Filter Correlation (GFC) spectrometer

Gas Filter Correlation (GFC) Spectroscopy

Schneider Electric Modicon M340 PAC

PLC vs PAC – Understanding the Key Differences and Similarities

Menu

  • About
  • Privacy Policy
  • Copyright

Quick Links

  • Learn PLC
  • Helping Hand
  • Part Time Job

YouTube Subscribe

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?