Inst ToolsInst ToolsInst Tools
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Search
  • Books
  • Software
  • Projects
  • Process
  • Tools
  • Basics
  • Formula
  • Power Plant
  • Root Cause Analysis
  • Electrical Basics
  • Animation
  • Standards
  • 4-20 mA Course
  • Siemens PLC Course
Reading: What is Nest Loading? – DCS and PLC Control Systems
Share
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • Design
  • PLC
  • Interview
  • Control System
Search
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Control Systems > What is Nest Loading? – DCS and PLC Control Systems

What is Nest Loading? – DCS and PLC Control Systems

Nest loading is the overall footprint of all the inputs and outputs of the control system (PLC, DCS, etc).

Last updated: September 28, 2022 12:40 pm
Jatin Katrodiya
Control Systems Instrumentation Design PLC Tutorials
No Comments
Share
7 Min Read
SHARE

Have you ever visited an unknown place? If yes, then I am sure that you must have followed this way.

Contents
Nest LoadingBest Practices for Nest LoadingExample Nest Loading List

Go to Country → State → City → Local Area → then place to be visited.

When you have a process plant wherein the control system has I/Os in the range of thousands, it is very difficult to identify their exact location especially when you need to do some troubleshooting.

Nest Loading

Nest loading is the overall footprint of all the inputs and outputs of the control system (PLC, DCS, etc). Nest loading in simple terms means I/O Assignment or I/O allocation.

Every I/O channel in the control system has unique addresses. These addresses are assigned in a specific format as mentioned below. The nest loading document covers these details for each tag number wired to the control system.

Domain No → Station No → Node No/Rack No → Slot No → Channel No.

For example,

Nest Loading

Depending upon controller capability, the number of nodes and slots can be connected. Each slot means the I/O module itself. I/O modules have their channels depending upon the type.

For example 8 channel AI module or 4 channel AO module or 16 channel DI module.

Each tag number can be assigned to an individual I/O channel. Hence the I/O address is unique for each tag number. This can be illustrated with the following figure for better clarity.

What is NEST loading in DCS

Best Practices for Nest Loading

The below are the some of the best practices for the I/O Assignment or I/O Allocation

1) All the tag numbers should be covered as per system-wise database e.g. DCS, ESD, FGS, PLC, etc

SIL rated I/O modules and controller are different than non-SIL rated. I/O module model no should be checked for DCS and ESD.

2) System diagnostic alarms such as Fan failure alarm, Power supply module failure, Temperature high, Earth leak detected or common alarm should be included in Nest loading. Sometimes I/O List document is prepared without these diagnostic I/Os.

3) Redundancy requirement of I/Os should be properly checked. e.g. Critical close-loop I/Os of DCS system shall be redundant, ESD & FGS I/Os shall be redundant. Redundant modules shall be installed and configured for redundant I/Os.

4) I/O allocation should be based on the Controller segregation philosophy. Sometimes controller for utility (like IA compressors, chemical dosing systems, drainage system, etc) and controller for the main process is different so that I/O assignment should be reviewed in a view of same that utility package related I/Os should not be connected to Process controller I/O modules and vise versa.

5) Closed-loop I/Os (i.e. Analog input and Analog Output) should be assigned in one I/O module.

6) 2oo3 / 1oo2 / 2oo2 Voting I/Os should be allocated in different I/O modules.

7) F&G detector I/Os which are part of 2ooN should be allocated in different I/O modules.

8)  Main and standby equipment (parallel equipment’s) related I/Os should be assigned in different I/O cards (Pump A, Compressor A related I/Os can be combined but Pump A and Pump B related I/Os should not be assigned in one module). Also LT and HT motors related I/Os should not be considered in One I/O module.

9) MCC related I/Os and Process/utility related I/Os should not be mixed in one I/O card.

The reason for having Sr no 5,6,7,8,9 is to avoid a single point of failure should not impact more than one instrument/equipment or process.

10) Relay location is important for I/Os identified as DO with Relay output. (Relay at Marshalling panel or separate cabinet such as IRP cabinet). Sometimes relay adaptor is part of the I/O Module (e.g Yokogawa‘s NIO based A2MMM843  Card with A2SDV505 or A2SDV506) adaptors. These relay adapters/relay boards should be cross-checked in Panel GA/IA drawings.

11) Multiple I/O channels  (for delivering higher current) or Wetted relay output can be considered for Digital Output signals identified as high powered 24V DC instruments such as solenoids, sounders, beacons, etc. Agreed philosophy should be followed.

12) Hardwired I/Os should not be considered between DCS and ESD if these systems are on an integrated network. E.g. ESD DO to DCS input. It should be considered when the different make of DCS and ESD systems is installed.

13) Some clients do not prefer to mix all types of I/O in One Universal I/O module (As universal I/O module can be used for AI, AO, DI, DO those I/Os can be mixed in one I/O card). Non-mixing can result in higher I/O modules and related wired spares etc

14) Wired Spare (installed spare) related I/Os and their tag assignment philosophy should be as per the Client‘s requirement.

15) When using electronic marshaling where field cables are connected directly on the I/O module (not on terminal blocks), the number of main cables terminated in one cabinet should be reviewed properly for ease of maintenance.

16) When you have remote I/O (RIO) panels then I/Os related to that area should be assigned in that particular Rack and slots of RIO. Otherwise, you will end up with a higher length of main cables from the field to the Control system.

17) The Rack no/ Node no, slot no. and module no. indicated on the nest loading document should be cross-checked with the system GA drawing.

18) Quantity of I/O modules and Spare space (for future I/O installation) should be cross-checked with the system GA drawing.

Example Nest Loading List

Nest Loading List

Author: Jatin Katrodiya

If you liked this article, then please subscribe to our YouTube Channel for PLC and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • UPS Selection Factors
  • Flow Compensation
  • DCS System Architecture
  • Wiring Diagrams of PLC
  • Interposing Relay Panel
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Sorting & Distribution Line PLC Programming – Advanced Logic
Package Control and Safety Systems Implementation Methods
Solenoid Operated Valves and Latching Valves
PLC Wiring Questions for Technicians and Engineers
Orifice Sizing Guidelines and Thumb Rules with Flowchart
PLC Automatic Control of Two Outputs with one Input
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
210kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

What is Thin Client in SCADA? – Purpose, Advantages
How O-Ring Failure caused NASA’s shuttle to Blast ?
What is Hot Standby in PLC?
S7-1200 Hardware Configuration – Siemens PLC Tutorials
PLC Programming using Level Switches
Implement UDT in PLC Programming: User-Defined Data Type
Car Wash Program using Functional Block Diagram (PLC)
Instrumentation Cyber Security Glossary

Keep Learning

What is Ground

What is Ground, and importance of a Grounding System?

Add On Instructions Programming – Analog Input Devices in Studio 5000

Troubleshooting PLC Current Loops

Troubleshooting Current Loops with Voltage Measurement

Split Range Control for Temperature Control Application

Split Range Control Working Principle

How to Link SQL With Indusoft Web Studio

How to Use an SQL Server with Indusoft Web Studio?

Difference between PLC and Computers

Difference between PLC and Computers

PLC Programming Example with Pushbutton and Motor

PLC Programming Example with Pushbutton and Motor

Example Program Logic in Allen Bradley PLC

PLC Programming Examples on Industrial Automation

Learn More

Pressure Gauge Installation

Pressure Gauge Installation at Pump Discharge

Analog to Digital Converters Objective Questions

Analog to Digital Converters Objective Questions

Thermocouple Temperature Measurements Errors

Thermocouple Temperature Measurement Errors

Cathode Ray Oscilloscope Questions & Answers

Cathode Ray Oscilloscope Questions & Answers

Pressure Gauge Selection

Pressure Gauge Selection

Formulas to calculate ma from PV

Formulas to calculate mA from PV, LRV and URV

What is a GSD File and Why it is required?

What is a GSD File and Why it is required?

Types of Switches

Electrical Switches Principle & Types

Menu

  • About
  • Privacy Policy
  • Copyright

Quick Links

  • Learn PLC
  • Helping Hand
  • Part Time Job

YouTube Subscribe

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?