Get the latest Quality Control (QC) Inspector interview questions and answers for your technical job preparation.
It is a process of verifying the method and application utilizing by means of following certain documented and authenticated instruction standards are known as inspection
The following are the extraordinary responsibilities that any QC Inspector is supposed to execute at the time of carrying out any inspection.
The following are the inspection records
Following are the characteristics of a perfect inspector:
The following are the requirements at the time of execution of an inspection.
Cable tray is made of corrosion-resistant metal such as aluminum alloy, Stainless steel, and low carbon steel, and is used to provide support and protection to the laid cables inside the building or outside pipe rack.
The material used according to specification.
Steam tracing and insulation as per hookup.
Seal fitting installed and filled.
Isolation and equalization valves or manifold installed.
Vent and drain manifold installed.
Tubing slope checked.
Verifying tubing connection to HP, LP side.
The leak test is done.
Pressure test of impulse tubing.
Instrument calibration before installation and documentation checked.
Instrument mounted as per the hookup drawing.
Check the instrument as per P&ID drawing.
Check for the Instrument securely installed on a stand.
Check the correct elevation relative to process tapping.
Check for stand and support.
Sunshade installation.
Fabrication of stand as per the drawing
Deburred, primed and painted.
Stand and support are secure.
Stand ground point.
Access to stand is unobstructed and clear for maintenance.
Materials inspection as per approved specifications, material, type and size, Installation as per Hook-up, check impulse line route to avoid any obstruction, check tube bending, and check tube support, compression fitting, or ferrules, and then pressure test (hydro test) shall be done.
Check the cable material as per approved specifications, size, and type, tray’s hook-up, and a proper tray to tray distance. I.e. power cable, control cable signal cable, low voltage and high voltage, support and fixed strongly free from shaking.
Cable inspection as per the approved materials, types and size, meggering data, cable routing drawing, completion of cable routing of the tray, conduit or trench, etc. and cable numbering (Tag), cable bending,
Ensure the use of proper tools and equipment for cable pulling.
JB to be checked for IP rating, type, size as per the approved specification, installation hook-up for the frame, bracket or stands, fixed properly for shaking free, Name Plate, and tag number.
When the QA/QC department of a contractor is satisfied that the comprehensive work in the construction RFI is completed, then request shall be submitted for inspection to the QA/AC department of the client.
In case any change occurs to the standard approved drawing while the project is being constructed or tested the relevant drawing will be redlined.
The following color coding shall be used for this purpose.
Red: if any addition is required in the existing document.
Green: if any deletion required from the existing document
Blue: if any comment is added.
Inspection: work can be executed without the client’s inspection and it can be inspected the same part of them.
Witness: work can be carried out without client inspection, and then it can be inspected upon the completion of work.
Hold point: work cannot be executed without client inspection.
The QA activity means adopted method for verification of the execution of QC activity in turn it focuses on the importance of implementation of QC role in the industrial and other sectors related to maintenance, production, and construction especially.
The QC activity means the direct involvement in maintaining quality standards as per the adopted standard by the way of carrying out inspection and making the documentation related to that. It also involves the activity involving the project’s quality maintainability and process execution.
QCP – Quality Control Procedure.
QMP – Quality Management Procedure.
ITP – Inspection and Test Plan.
Learn the example of flip-flop PLC program for lamps application using the ladder logic to…
In this article, you will learn the STAR DELTA programming using PLC controller to start…
Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…
Rotating equipment packages such as pumps, compressors, turbines need the lube oil consoles for their…