Take appropriate work permit and take necessary approvals from the concerned persons.
Bypass the logic if the pressure transmitter is having any interlocks (Always take bypass approval from operations and fill the Interlock Bypass Form).
If a pressure transmitter (PT) is used for process control using a control valve, then ask the operation engineer to put the PID controller (control loop) in manual mode.
Ask the operation engineer to arrange for the isolation of the pressure transmitter through a process isolation valve. (if needed)
Verify the pressure transmitter tag number. You should always ask the value shown by the pressure transmitter on the DCS/SCADA/PLC systems and cross-check the value on the transmitter installed in the field. This is a double confirmation for identifying the proper tag. (optional)
Note down the value shown by the pressure transmitter before starting the PM job.
Open the back cover of the pressure transmitter and you will find the cable connections and terminals.
Note down all the cable connections. So that after job completion, all cable connections are properly restored back.
Confirm that the pressure transmitter is isolated with the process tapping point.
Isolate and check the zero of the pressure transmitter. Open the equalization valve and
Properly drain the fluid if needed and check the zero reading (for hazardous service close drain if required).
Connect the Scandura or Pressure Pump or Pressure Source to the pressure transmitter.
Cross-check the range from the datasheet and the pressure transmitter configured range.
Apply the required pressure to the pressure transmitter with the help of a pressure pump or pressure source.
Note down the pressure transmitter reading in the field and also note down the control room reading (DCS/PLC/SCADA).
Repeat the above step for different pressure points like 0%, 25%, 50%, 75%, and 100% of the pressure transmitter configured range. Log the values in the below table.
% of Range
Input from TCI
Value on field display
Value on DCS/SCADA/PLC
0
0
25
2.5
50
5
75
7.5
100
10
75
7.5
50
5
25
2.5
0
0
Note: Above table shows a pressure transmitter range of 0 to 10 kg/cm2
Keep checking for leakages with Snoop liquid leak detector (or any other solution) after increasing pressure at regular intervals.
If the pressure transmitter generates the output with an error less than the maximum permissible error, then both readings are ok. If the transmitter is having errors more than the maximum permissible error, then calibrate the transmitter. And after calibration, recheck all the values.
Restore the original connections. Take transmitter in line.
Close the back cover of the pressure transmitter and apply monsoon tape or silastic whichever is applicable.
After normalizing the pressure transmitter, check the present PT values with the old values taken before the job and ask for operations that they are correct or not (sometimes due to ongoing process values may differ). If found not ok, then recheck the connections. (Optional)
Apply a calibration sticker on the pressure transmitter with the appropriate calibration due date.
Clean the pressure transmitter.
Restore the interlocks if any and also ask the operation engineer to put the control loop again in auto mode if taken in manual mode.
Close the work permit.
Fill up the calibration record of the pressure transmitter.