Inst ToolsInst ToolsInst Tools
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Search
  • Books
  • Software
  • Projects
  • Process
  • Tools
  • Basics
  • Formula
  • Power Plant
  • Root Cause Analysis
  • Electrical Basics
  • Animation
  • Standards
  • 4-20 mA Course
  • Siemens PLC Course
Reading: Industrial Automation Pre-Engineering Design Documents – Project & Process
Share
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • Design
  • PLC
  • Interview
  • Control System
Search
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Control Systems > Industrial Automation Pre-Engineering Design Documents – Project & Process

Industrial Automation Pre-Engineering Design Documents – Project & Process

Learn the various pre-engineering design documents related to industrial automation, which are necessary to finalize a project.

Last updated: December 12, 2022 10:24 am
Viral Nagda
Control Systems Instrumentation Design PLC Tutorials
No Comments
Share
7 Min Read
SHARE

Designing industrial automation is a very detailed engineering task, as it involves knowledge of electronics, electrical and instrumentation control. As it involves so many departments, it will thus require strong documentation to fulfill it.

Contents
Industrial Automation Pre-Engineering DocumentsDocument Control IndexMaterial Control IndexProject ScheduleCommissioning ScheduleP and ID DiagramProcess Flow Diagram

Documentation is always the first step in successfully executing a project. If the documents are proper, then the concerned persons involved can properly execute the task.

Industrial automation has many design documents related to pre-engineering (before starting and finalizing the project).

Industrial Automation Pre-Engineering Documents

Industrial Automation Pre-Engineering Documents

In this post, we will have a look at the various pre-engineering design documents related to industrial automation, which are necessary to finalize a project. This post is divided into two parts, as it is lengthy and cannot be covered in one topic. We will see the first part which deals with the project and process. You can read the second part related to electrical and instrumentation engineering documents.

Document Control Index

The Document Control Index is one of the main documents in preparing a project. It is a way of linking all digital documents with some attributes or labels.

Simply say, if you have “n” number of document parts. You don’t know which document is related to which subject and what is its meaning. So, this index will be used in every document to help it identify the type and its purpose.

Document Control Index document makes discovering files easier and so allows the user to access any document at any moment with a few clicks. If you have done proper indexing, then you can properly arrange them in sub-folders according to their category.

A simple example will be tagging a document based on the client name, consultant name, date, purchase order number, and its heading title (which means the type of document). When you are designing a project, this index is a must in pointing to various types and meanings of them.

Material Control Index

You are giving materials in a project and if you have no control over it, then the project is a waste of time. Material control index is a special type of document which helps in dealing with it. It starts from procurement and goes till the last usage stage.

Material Control Index document includes purchasing or procurement of materials, receiving of materials, an inspection of materials, storage of materials, issuing of materials, maintenance of material records and materials, or stock audit.

If you have a proper idea of this, then only you commit a customer how long a project will take to complete. This will also help in the following things – uninterrupted protection by continuous availability, minimum wastage and loss of materials, financial control, less delay in production, and high-quality assurance and efficiency. This document must be available in hand before taking on any project.

Project Schedule

You must maintain proper dates with the customer in the completion of a project. Every project has many stages – like machine design, material management, GA approval, electrical drawings submission, and approval, commissioning team manpower timelines, electrical panel manufacturing, software development, FAT, and dispatch.

If the dates are approximately decided between you and the customer, it will help in the proper and timely execution of a project.

Every project stage must be completed within the set time, which will eventually help finish the project. So, it is important to maintain the project schedule with the customer before taking the order in hand.

Commissioning Schedule

When you have decided on the project schedule, it is necessary to share the commissioning schedule with the customer.

The commissioning Schedule document will contain information regarding the project completion date, material receive at the site, commissioning team arrival dates, pre-commissioning activities start (utility, electrical and mechanical), actual commissioning activities start with process start-up, and operational readiness.

Though these dates are not always actual, they have to be met tentatively which will help in a successful completion.

P and ID Diagram

P & ID stands for pipeline and instrumentation diagram. Basically, this drawing gives you an overall look at detailed piping, instrument location, tank location, utility transfer source and destination, and construction process.

Identify Process Variables in P&ID

After understanding client requirements and conveying your possibilities, you design the P and ID. This document will then help to understand how the process will look like, flow, and complete. P&ID is also a very important document for programmers to understand process flow, which will help them to design the program accordingly.

Process Flow Diagram

Process Flow Diagram can be termed as the parent of the P and ID diagrams. Actually, on the basis of this diagram, the P and ID diagram is designed.

Simple, consider you have five processes in a plant.  If you know how a process will flow from start to end, then you can easily design the system accordingly. It is a type of flowchart that illustrates the relationships between major components at an industrial plant. They use a series of symbols and notations to depict a process.

The symbols vary in different places, and the diagrams may range from simple, hand-drawn scrawls or sticky notes to professional-looking diagrams with expandable detail, produced with software.

These are some general project and process documents required. In the next post, we will see the documents related to electrical, instrumentation, and ITP. In this way, we saw the pre-engineering design documents related to industrial automation (projects and process).

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • What are FAT and SAT?
  • Instrumentation Problems
  • Instrument Numbering Philosophy
  • How to Fill up Instrument Datasheet?
  • Tagging Philosophy for Junction Box
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

How to Troubleshoot a PLC System?
Actuator Sensor Interface (ASi) Protocol in PLC
EasyBuilder Pro Online Simulation of Mitsubishi FX3U PLC
Types of Allen Bradley PLC
Parking Lights PLC Program Explained with Video
PLC Programming to Control Lights in a Sequence
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
210kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

PLC Program for Counting Moving Objects on Conveyor
PLC Program for Star Delta Starter using Functional Block Diagram
PLC Ladder Program for Automatic Car Wash using Siemens TIA Portal
Liquid Flow Control Loop Controller Action
Identify Process Variables in P&ID
Testing of Pneumatic Systems
OMRON PLC Math Instructions: +(400), -(410), *(420), /(430)
PLC Permissive for Motor Control

Keep Learning

Structured Text PLC Programming for Two-Tanks Level Control

Structured Text PLC Programming for Two-Tanks Level Application

PLC offline data of a project are compared

Compare Two Offline PLC Projects

How to Select the Right Encoder for Your Machine

How to Select the Right Encoder for Your Machine?

Sorting and Counting Products on Conveyors by Color

PLC Programming for Multi-Color Sorting Conveyor System

PLC Program for Burglar Alarm Security System

PLC Program for Alarm Security System

Why 24 Volts DC Power Supply

Why 24 Volts DC Power Supply is used? – Industrial Automation Systems

Sink or source PNP or NPN Normally Open or Normally Closed Input v. output. output

Sink or Source? Normally Open or Normally Closed?

ICS System Design

ICS System Design Considerations

Learn More

Shockley Diode Working Principle

Shockley Diode Working Principle

Proportional Controller Response Curve

Proportional Controller Principle

Amine Pump Trip - Root Cause Analysis

Amine Pump Trip – Root Cause Analysis

Free Online Control Valves Course

Free Control Valves Course

DC machines and Induction Machines Viva Questions & Answers

Determine Calibration Range of Pneumatic Pressure Transmitter

Determine Calibration Range of Pneumatic Pressure Transmitter

Temperature Coefficient of Resistance

Temperature Coefficient of Resistance (α)

Probe Thermometer

What is a Probe Thermometer? How to Calibrate and Use it?

Menu

  • About
  • Privacy Policy
  • Copyright

Quick Links

  • Learn PLC
  • Helping Hand
  • Part Time Job

YouTube Subscribe

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?