Inst ToolsInst ToolsInst Tools
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Search
  • Books
  • Software
  • Projects
  • Process
  • Tools
  • Basics
  • Formula
  • Power Plant
  • Root Cause Analysis
  • Electrical Basics
  • Animation
  • Standards
  • 4-20 mA Course
  • Siemens PLC Course
Reading: PLC Program for Bank Counter Application
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • Design
  • PLC
  • Interview
  • Control System
Search
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > PLC Tutorials > PLC Program for Bank Counter Application

PLC Program for Bank Counter Application

Last updated: March 4, 2021 3:48 pm
Editorial Staff
PLC Tutorials
No Comments
Share
2 Min Read
SHARE

A bank having three counters for Deposit /Withdraw cash in which totally 15 people are allowed for a day. When people count reaches 15, display will show Counter Closed and should not allow the 16th person to check-in. Develop a suitable program for this plc programming example.

Contents
PLC Program for Bank CounterList of Inputs and OutputsPLC Counter ExampleLadder Logic DescriptionConclusion:

PLC Program for Bank Counter

PLC Counter Example for Bank

List of Inputs and Outputs

PLC Counter Example Inputs and Outputs

PLC Counter ExamplePLC Bank Counter Logic

Counter Example in PLC Programming

Ladder Logic Description

RUNG000

Latching rung to operate the system through Master Start and Stop PB.

RUNG001

When a person enters Counter 1, Sw 1 is pressed by the bank person to make count .One shot is used to give single pulse input which will be store in O:0/1

RUNG 0002

When a person enters Counter 2, Sw 2 is pressed by the bank person to make count .One shot is used to give single pulse input which will be store in O:0/2.Counter done bit is used to restrict the 16th person to enter.

Rung 0003

When a person enters Counter 3, Sw 3 is pressed by the bank person to make count .One shot is used to give single pulse input which will be store in O:0/3

Rung 0004

Collected outputs from the above rungs are accumulate in Counter block. Comparator block is used to limit the count by 15.

Rung 0005

Counter (C5:0) done bit is used to refresh the Process from beginning

Program runs continuously until STOP PB is pressed.

Conclusion:

The above explained Bank counter  using PLC is for example only. It may vary from real time. We can use this example program to understand the working of Counters function in AB PLC.

Author : Hema Sundaresan

If you liked this article, then please subscribe to our YouTube Channel for PLC and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

PLC Timers Program

DeltaV System Download

PLC Quiz Questions

Mixing Process PLC

PLC System Documents

Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

How to Create Templates in FactoryTalk View Studio?
#18 PLC Best Practices – Store PLC Hard Stop Events from Faults
Basic PLC Exercise on Heater and Cooler for Students
Chemical Mixing Process using PLC
Comparison Instructions in PLC Programming
Commissioning Checklists for Industrial Automation Systems
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
210kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

Controlling of Tank Level Using Proportional Controller in PLC
PLC Ladder Logic Example
Node-RED in PLC Industrial Automation
Comparison of Proportional Integral Derivative Controllers (PID)
How to Upload Siemens PLC Programs?
What is Function Module in Siemens PLC?
Safety Door Interlock PLC Program
#15 PLC Best Practices – Safe State when PLC Restarts

Keep Learning

PLC Example to Control LEDs Via Switches

PLC Example to Control LEDs Via Switches

Convert an Electrical Diagram into PLC Program

How to Convert an Electrical Diagram into PLC Program?

Liquid Tank Filling and Emptying PLC System

Auto and Manual Liquid Tank System: PLC Program Example

Playground Swing Logic Exercise Program in PLC

Playground Swing Logic Exercise Program in PLC

SCADA System

What is SCADA System?

Lights with Adjustable Timers PLC Programming

Flip-Flop PLC Programming: Lights with Adjustable Timers

PROFIBUS is also a Master Slave protocol

Compare Modbus, Fieldbus, and Profibus

Industrial Automation Cold and Hot Standby

Difference between Cold Standby and Hot Standby

Learn More

Analyzers Questions and Answers

Analyzers Based on Gas Density Questions & Answers

Material Certificate versus Positive Material Identification (PMI)

Material Certificate versus Positive Material Identification (PMI)

LED Indications on PLC

Getting to Know the LED Indications on GE Make PLC

Fieldbus Flow Transmitter Configuration

Fieldbus Flow Transmitter Configuration

Identification of Equipment Standards

Identification of Equipment

Calibration of Weight

Calibration of Weight using the ABBA Method

Types of Generators

What are Switchgear Interlocks?

What are Switchgear Interlocks?

Menu

  • About
  • Privacy Policy
  • Copyright

Quick Links

  • Learn PLC
  • Helping Hand
  • Part Time Job

YouTube Subscribe

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?