Inst ToolsInst ToolsInst Tools
  • Ask
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: Unknown Do’s Need to Know as a PLC Programmer
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Ask
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > PLC Tutorials > Unknown Do’s Need to Know as a PLC Programmer

Unknown Do’s Need to Know as a PLC Programmer

This article will help the PLC programmer who is just started. These unknown do’s will help you to save the mistakes in the ladder logic.

Last updated: March 12, 2023 10:23 am
Editorial Staff
PLC Tutorials
No Comments
Share
5 Min Read
SHARE

When we are working with PLC programming we take all precautions and try to avoid the problems with proper planning and implementation of the logic.

Contents
PLC Programmer Unknown Do’sAware of Normally Closed (NC) OutputsBe on the Safer SideI/O ListUnderstand the ProcessFollow the Rules

But we may do little mistakes during the programming and we have no clues about them until we face some issue with our PLC functionality.

With experience, we can minimize these issues and have better exposure to practical PLC coding problems.

PLC Programmer Unknown Do’s

PLC Programmer Unknown Do's

This article will help the PLC programmer who is just started. These unknown do’s will help you to save the mistakes in the ladder logic programming.

Aware of Normally Closed (NC) Outputs

The NC is abbreviated as normally closed. By the name itself, it talks about the function of contact in a relay or a ladder logic.

We must take care when we are using NC contact in our PLC programming as it supplies the power or control signals to the field instrument or any other local panels by default without any need for input signals status (considering input off state).

So in some situations, the NC contacts may cause problems like during PLC startup or during unplanned shutdowns as NC contact outputs may supply the power or control signals to other instruments or panels which may further lead to unwanted actions and damage of equipment.

Hence PLC programmers must consider these types of conditions also before finalizing the PLC logic.

Note: We may not find these types of issues during normal working conditions or during SAT or FAT.

Be on the Safer Side

Safety is very important in our daily work routine in industries. The same applies to our software, ladder logic programs, and other control systems.

Always take project backups before doing any task like modifying, new configuration, upgrades, etc.

So it is always recommended to take project backups when you are upgrading from an old PLC system or during creating new programs.

Always save your PLC logic multiple times when you are working on the PLC projects during configuration, testing, commissioning, etc. Save your backups at different locations like external hard disks, CD/DVD, dedicated Pen Drives, and other computers on your network.

I/O List

The I/O list is a standard document required when we work on PLC or DCS control systems.

During writing the PLC program we need to use a lot of I/O addresses as per our logic requirement. So I/O list helps us to use the I/O’s with proper planning.

So it is always recommended to follow the I/O list during the PLC programming. Avoid using random I/O addresses in the PLC project even if it is a small application.

The I/O list also helps us during troubleshooting and it saves us lots of time.

Understand the Process

It is one of the important aspects of any field. First, we need to be clear about the requirements of your client and understand the project requirement clearly.

Understand the process sequence clearly, according to it you have to write the PLC program, it will make a big difference. Hence study the plant control philosophy document where you can learn the process operations.

Follow the Rules

There are certain standards that recommend the best practices in every field. Example: IEC standards. There are different sets of standards available as per the country or region.

These standards will help us to implement the already proven methods to achieve the desired task like the selection of cables as per application, hazards practices in oil & gas industries, control system design rules, safety-related logic, etc.

Author: Mohamed Shahul Hameed

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • PLC Best Practices
  • Hot Standby in PLC
  • PLC Memory Usage
  • Converter in Siemens PLC
  • Simulation in Schneider PLC
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !
Move, Move Bit, Move Digit – Examples of Omron PLC Programs
Siemens S7-300 CPU Suffix Explanation
#16 PLC Best Practices – Create Trend for Cycle Time on HMI
PLC Program for Traffic Light Sequence using Functional Blocks
InTouch SCADA Login Password Security
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Recent Comments

  • Kamli on Top Free PLC Software
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • MIHARITSOA Aina Sitraka on Top Non-PLC Certification Courses for Automation Professionals

Related Articles

PLC Circuit with Switches

PLC Example with Switches

How to Blink Lights in Ladder Logic

How to Blink Lights in Ladder Logic?

SCADA Software and their Comparison

SCADA Software and their Comparison

Problem on PLC, HMI, VFD, and Motor Circuit

Problem on PLC, HMI, VFD, and Motor Circuit

Free WinCC SCADA Training Course

Free SCADA Training Course

OFF Delay Timer using PLC

OFF Delay Timer using PLC

CPU Communication Ports in Siemens PLC

Types of CPU Communication Ports in Siemens PLC

FIFO and LIFO Sequences in PLC

What are FIFO and LIFO Sequences in PLC?

More Articles

Difference Between Metering CT and Protection CT

Difference Between Metering CT and Protection CT

Electrical Machines Questions and Answers

Induction Motor Phasor Diagram

Measurement and Instrumentation Objective Questions

Measurements & Instrumentation Quiz – Set 8

Voltage Polarities

Voltage Polarity and Current Direction

Steam flow to the heat exchanger

Analytical Process Control Question

Thermowell Design Guidelines

Raspberry Pi Projects

200 Raspberry Pi Projects

Burner Management System (BMS) Principle

What is Burner Management System (BMS)?

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?