Inst ToolsInst ToolsInst Tools
  • Ask
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: #11 PLC Best Practices – Instrument for Plausibility Checks
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Ask
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > PLC Tutorials > #11 PLC Best Practices – Instrument for Plausibility Checks

#11 PLC Best Practices – Instrument for Plausibility Checks

Instrument the process in a way that allows for plausibility checks by cross-checking different measurements.

Last updated: September 22, 2021 6:22 am
Editorial Staff
PLC Tutorials
No Comments
Share
3 Min Read
SHARE

Instrument the process in a way that allows for plausibility checks by cross-checking different measurements.

Security ObjectiveTarget Group
The integrity of I/O valuesProduct Supplier Integration / Maintenance Service Provider

Instrument for Plausibility Checks

There are different ways of using physical plausibility for validating measurements:

a) Compare integrated and time-independent measurements

Plausibility checks can be done by integrating or differentiating time-dependent values over a period of time and comparing to time-independent measurements.

b) Compare different measurement sources

Also, measuring the same phenomenon in different ways can be a good plausibility check.

Different measurement sources do not necessarily have to be different physical sensors, but can also mean using alternative communication channels (see examples).

Example

a) Compare integrated and time-independent measurements

Metered pump and tank level gauge: volumetric change should equal integrated flow.

The burner in a boiler: added caloric heat should equal temperature rise.

b) Compare different measurement sources

Using air-speed, artificial horizon, vertical speed, and altitude in the airplane to measure the phenomenon of the climbing / descending airplane.

Comparing process parameter values from independent data loggers (tied into 4-20mA loops or relay contacts and transmitted via independent communication channels) to SCADA system data (coming in the “normal” way through PLC and HMI) and alerting on deviations and significantly off-specified values.

Why?

Beneficial for…?Why?
  SecurityFacilitates monitoring for manipulated values (assuming not all sensors are manipulated at once).
  ReliabilityPrevents acceptance or identifies (for future action) corrupted / wrong measurements as inputs.
MaintenanceRules out the possible physical causes for failures more quickly.

References

Standard/frameworkMapping
  MITRE ATT&CK for ICSTactic:  TA010 – Impair Process Control
Technique:  T0806 – Brute Force I/O
  ISA 62443-3-3SR 3.5: Input Validation
SR 3.6: Deterministic Output
  ISA 62443-4-2CR 3.5: Input Validation
CR 3.6: Deterministic Output
MITRE CWECWE-754: Improper Check for Unusual or Exceptional Conditions

Source: PLC Security

Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !
Flexible Input Output Modules
PLC Instruction List Program for Basic Instructions
PLC Timers Program
Positive and Negative Edges using Statement List Language
PLC Programming for Loss in Weight Liquid Systems
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Recent Comments

  • Kamli on Top Free PLC Software
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • MIHARITSOA Aina Sitraka on Top Non-PLC Certification Courses for Automation Professionals

Related Articles

Structured Control Language (SCL) Elements

Value Assignments in SCL Language – Single, Multiple, Combined

OSI Reference model

SCADA Communication and Protocols

PLC Based Metro Automation Project

PLC based Metro Automation Project

Configuration of Siemens Scada and PLC

#12 PLC Best Practices – Validate Inputs based on Physical Plausibility

Tank Level Control Process in PLC

Tank Level Control in PLC

Use PLC Flags as Integrity Checks

#4 PLC Best Practices – Use PLC Flags as Integrity Checks

PLC Control Panel

Inside the PLC Control Panel: How Much Do You Know?

Grounding or Earthing Scheme in DCS or PLC Systems

Grounding or Earthing Scheme in DCS or PLC Systems

More Articles

Split-Range, Auto-Selector Ratio, And Cascade Systems

Split-Range, Auto-Selector, Ratio & Cascade Systems

Multi-Cartridge Filter

Cartridge Filters

Software Troubleshooting Errors and Faults in Siemens PLC

Software Troubleshooting Errors and Faults in Siemens PLC

Power Electronics Objective Questions

Quiz on Thyristor Chopper

Rotary UPS or Dynamic UPS

What are Static UPS and Rotary UPS?

Analyzers Questions and Answers

Pulse Height Analyzer Questions & Answers

4 way solenoid valve root cause

Safety Liquid Ammonia Disconnect threatens NH3 Vapor Spill

Batteries MCQ - Multiple Choice Questions

Batteries MCQ – Multiple Choice Questions

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?