Inst ToolsInst ToolsInst Tools
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: Alternate 110 KV Connection to Feeder A
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > Alternate 110 KV Connection to Feeder A

Alternate 110 KV Connection to Feeder A

Electrical engineering root cause analysis (RCA) related to Alternate 110 KV connection to Feeder A.

Last updated: September 28, 2022 3:08 pm
S Raghava Chari
Root Cause Analysis (RCA)
No Comments
Share
2 Min Read
SHARE

Electrical engineering root cause analysis (RCA) related to Alternate 110 KV connection to Feeder A.

Contents
Alternate 110 KV Connection ProblemThe job done finallyAlternative 110 KV Supply Benefits
Article Type:Root Cause Analysis (RCA)
Category:Electrical
Equipment Type:Bus ducts, Switchgear, Transformers,
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Alternate 110 KV Connection Problem

The State Electricity Board (SEB) had tapped both Feeder-A and Feeder-B from a certain thermal station bus (TSB). This resulted in no power supply to the plant during TSB Maintenance Shutdowns.

The plant had paid a huge sum to provide an alternate connection to Feeder‑A to avoid total electrical outage to the plant. Years rolled on. However, the project remained in the paper only!

The job done finally

During the national internal emergency, the author agreed to loan materials to the board for their rush work, only after completing the plant’s above long overdue project. They did the job this time!

Alternative 110 KV Supply Benefits

Thanks to this, plant gets uninterrupted power even during the TSB maintenance.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Insulation Resistance (IR) Problems
  • Failing Weigh Feeders and Drives
  • Transformers Coolers Problems
  • Motor Rampant Winding Burnout
  • Frequent Lightning Arrester Bursts
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Heat Exchanger Root Cause Analysis (RCA)
Ammonia Feed Ball Valve to Ship Tank Closed
Turbo-Compressor Problem – Root Cause Analysis
Carbamate Plunger Pump Packing Problems Eliminated
Control Valves Leak Tightness Restoration Pose Difficulties
Serious Constraints Prevent using an Available Turbine Flow Meter
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

8000 RPM 8000 kW Turbine Problem
RCA – Compressor Did Not Trip on Suction Pressure Low Low
Totally Enclosed Fan Cooled (TEFC) Motors Rampant Winding Burnouts
Control Valve Passing Problem after Overhauling Job
Root Cause Analysis of Differential Pressure Level Transmitter
Finned Tube Steam Leaks – Root Cause Analysis
Root Cause Analysis – Burst Transformers and 11 kV Input Breakers
Inability to Test Repaired HT Motors in Workshop Posed Problems
Replace Failed Motors Quickly and Easily
Mechanical Engineering Plant Problems Solved – Root Cause Analysis

Keep Learning

Purpose of Isolation valve

Repeat Failures of Letdown Valves

Welding Machine Fail in Dusty and Corrosive Areas

Welding Machine Fail in Dusty and Corrosive Areas

Flash Vessel All Level Instruments Stopped Working

Ammonia Flash Vessel All Level Instruments Stopped Working

Compressor Cracked Shaft Spacers

Compressor Cracked Shaft Spacers

Failed Letdown Valve

Failed Letdown Valve Shuts down a Urea Plant Several Hours

Thermocouples Problem

Fire burnt Ammonia Converter Thermocouples Problem

Gearbox within week Failing Journal Bearing upset Plant Operations

Gearbox within week Failing Journal Bearing upset Plant Operations

Jacket Added Seawater Pipe Spool

Seawater Pipeline Spools from day-1 leaks threaten Plant Shutdown

Discover More

Serial Communication Data Transmission Modes

Serial Communication Data Transmission Modes

Siemens OB Blocks

Siemens PLC Organization Blocks (OB)

Open Loop Control Block Diagram

Self-regulating Processes – Liquid Flow Control

Electrical Machines Questions and Answers

DC Machines Excitation Quiz

repairs of welding cast refractory lined box over the hot spots

Primary Reformer RFG main Hot Spots threaten Indefinite Outage

PLC Math instructions

PLC Math instructions

Single Push button to ON and OFF a Bulb using Ladder Logic

Single Push button to ON and OFF a Bulb using Ladder Logic

Ground Fault Versus Short Circuit

Difference Between Short Circuit and Ground Fault

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?