Try mock test on digital electronics and check questions with corresponding answers.
1. When will be the output of a NOT gate is LOW ?
A) the input is LOW.
B) the input is HIGH.
C) none of the answers
D) the input is HIGH and LOW.
2. When will be the output of an exclusive-OR gate is HIGH?
A) The inputs are equal
B) All inputs are LOW
C) All inputs are HIGH
D) The inputs are different
3. How many input and output required for multiplexer?
A) One input and many output
B) None of the answers
C) One input and one output
D) Many input and one output
4. What is the requirement of full substractor circuit?
A) Two inputs and two outputs
B) Three inputs and two outputs
C) Three inputs and one output
D) Two inputs and three outputs
5. Which is the example of digital device from the given option ?
A) Record players
B) Thermistors
C) Microprocessors
D) Sensors
6. Choose the option which is not a code conversion standard
A) BCD code
B) Gray code
C) Excess-3 code
D) Truth code
7. The time required for a gate to change its output is called as
A) Decay time
B) run time
C) propagation time
D) start time
8. What is the radix of octal number system?
A) 2
B) 16
C) 8
D) 10
9. How many input and output required for demultiplexer?
A) one input and many output
B) one input and one output
C) number of selection inputs and one output
D) None of the answers
10. A single flip-flop can be cleared (reset) to
A) Both 1 and 0
B) 1
C) 0
D) None of the answers
Click on the below button to launch the Quiz.
All 30 questions and answers are available in the Quiz.
Share your answers with us through the below comments section.
Take All Tests :
In this article, a simple example will teach you the conversion from Boolean algebra to…
In this article, you will learn the PLC cooking timer example for kitchen automation using…
Learn an example PLC program to control a pump based on level sensors using ladder…
In the PLC timer application for security camera recording, when motion is detected then camera…
In this example, we will learn batch mixing with PLC ladder logic program using timer…
This PLC example on manufacturing line assembly is an intermediate-level PLC program prepared for the…
View Comments
Easy question