Inst ToolsInst ToolsInst Tools
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Search
  • Books
  • Software
  • Projects
  • Process
  • Tools
  • Basics
  • Formula
  • Power Plant
  • Root Cause Analysis
  • Electrical Basics
  • Animation
  • Standards
  • 4-20 mA Course
  • Siemens PLC Course
Reading: Erratic H2 Flow Rotameter
Share
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • Design
  • PLC
  • Interview
  • Control System
Search
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > Erratic H2 Flow Rotameter

Erratic H2 Flow Rotameter

Erratic H2 flow rotameter readings prevented newly charged catalyst reduction and delayed Reformed Gas Production.

Last updated: September 28, 2022 2:55 pm
S Raghava Chari
Root Cause Analysis (RCA)
No Comments
Share
2 Min Read
SHARE

Instrumentation engineering root cause analysis of erratic reading of H2 flow rotameter.

Contents
Flow Rotameter ProblemInstrument Crew’s difficultiesPipe fitters’ woesAuthor Solution
Article Type:Root Cause Analysis (RCA)
Category:Instrumentation
Equipment Type:Sensors
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Flow Rotameter Problem

Erratic H2 flow rotameter readings prevented newly charged catalyst reduction and delayed Reformed Gas Production.

Instrument Crew’s difficulties

The instrument crew complained about the pipe fitter’s inability to make the ¾ pipe exactly vertical. Hence, stuck rotameter float and unreliable readings

Pipe fitters’ woes

They too expressed the near impossibility of the slender ¾” pipeline ‘rotameter plumb’. Even if they achieve it, it does not stay that way!

Author Solution

He told the Instrument crew to do the following:

Erratic H2 Flow Rotameter
  1. Workshop to make a 2” pipe stand to mount the rotameter using instrument engineer given sketch
  2. Miscellaneous contractor to grout it vertically to the cement floor under instrument engineer supervision
  3. Instrument crew to bolt the rotameter on the stand vertical and lock the fasteners with lock nuts
  4. Pipe fitters to connect the pipe flanges to the rotameter strain free i.e. just by hand position the pipes to match the rota meter flanges

Problems vanished and reformer started smoothly.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Level Transmitters Zero Drifts
  • Target Flow Transmitters Failed
  • Pitot-tube Replaced with Orifice
  • Mechanical Temperature Indicator
  • Seal Pressure Instruments Problems
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

A Large Gate Valve’s Failed Motorized Operation
11 KV Bus A to Bus B Phase Check Problem
Failed Letdown Valve Shuts down a Urea Plant Several Hours
Poor Bagging Scale Availability Threatened Production Cuts
Control Valves Leak Tightness Restoration Pose Difficulties
An Indian Plants all turbines’ low Vacuum & Saudi Plant turbo-compressor only
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
210kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

Pressure Correction Pneumatic Instrumentation
Problem with Choked Control Valve with Whisper Trim Cage
Root Cause Analysis for Vibration Probe Not Responding
Safety Liquid Ammonia Disconnect threatens NH3 Vapor Spill
Amine Pump Trip – Root Cause Analysis
High-pressure Service Level Transmitters Misunderstood Zero Drifts
Discharge Head 3‑monthly leaks of Steam Turbine Driven Centrifugal Compressors
Heat Exchanger Root Cause Analysis (RCA)

Keep Learning

Innovative Segment Orifice

Pitot-tube Replaced with Innovative Segment Orifice Plate

Thermowell Shank to Flange Repeat Weld Leaks

Thermowell Shank to Flange Repeat Weld Leaks

Questions and Answers on Motors and Generators

HT Motor Problem appears after Disassembly and Reassembly

Pump Low throughput

[RCA] Pump Low throughput Eliminated

Plunger Pump Drive

Too Low Efficiency Torque Converter Elimination Attempt

Fasteners and General Corrosion of Electrical Motors

Fasteners and General Corrosion of Electrical Motors

Weigh Feeder Drive

Failing Weigh Feeders and Mechanical Variable Speed Drives (VSD)

Improved Sprocket Segment Bolting to body

A Plant Bucket Elevators chains too short chain lives problem eliminated

Learn More

Double-acting cylinder - 2

Fluid Power Systems

Trip Valve Shown Tripped

Trip Valve Principle

Ladder Logic Example with Timers

Ladder Logic Example with Timers

CNC Custom Machining

What is Custom Machining in CNC? Why Should You Choose It?

Industrial Automation Systems

Remote Functions in Industrial Control Systems (ICS)

PID Simulator

PID Simulator Download

DCS

DCS

Control 3 Motors with Toggle Switch

PLC Ladder Logic Design: Control 3 Motors with Toggle Switch

Menu

  • About
  • Privacy Policy
  • Copyright

Quick Links

  • Learn PLC
  • Helping Hand
  • Part Time Job

YouTube Subscribe

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?