Inst ToolsInst ToolsInst Tools
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: Phosphate Dozing System Problems
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > Phosphate Dozing System Problems

Phosphate Dozing System Problems

Small quantities of phosphate solution injection called ‘Phosphate Dozing’ into boiler drums precipitate the BFW residual salts.

Last updated: September 28, 2022 3:19 pm
S Raghava Chari
Root Cause Analysis (RCA)
No Comments
Share
3 Min Read
SHARE

Root Cause Analysis (RCA) related to the phosphate dozing system problems.

Contents
Phosphate DozingProblem Problem Root Cause IdentifiedAuthor Proposed SolutionProblem Solved
Article Type:Root Cause Analysis (RCA)
Category:Mechanical
Equipment Type:Miscellaneous Rotating Machine Problems
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Phosphate Dozing

Small quantities of phosphate solution injection called ‘Phosphate Dozing’ into boiler drums (below figure) precipitate the BFW residual salts.

Continuous or periodic small quantities drum water blow down rids of these precipitates and maintains BFW purity.

Phosphate Dozing System

Problem

The plant superintendent identified no phosphate dozing to the 100‑bars boiler drum from phosphate feed drum no make ups.

He requested the dozing plunger pump checkup. The field crew unable to solve the problem approached the author.

 Problem Root Cause Identified

The author found the pump discharge pressure 120 against the normal 110 bars.

Hence, he guessed most likely the entire the 150 Nos. 1.5 mm dia holes drilled on the 1” drum length dozing pipe plugged up.

Author Proposed Solution

The author suggested readying a new dispersing pipe with 38 Nos. never choke 3 mm dia holes of near original total flow area.

His pointing out that the drum turbulence would mix the dozed phosphate well won approval

Problem Solved

Crew did find the distributor holes plugged up during the TA. They cut out the old distributor, welded the readied distributor to the stub, and saved TA activity time.

Boiler Phosphate dozing became fit and forget system

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Turbo-Compressor Problem
  • Compressor Anti-Surge Control
  • Plant Air Compressors Problems
  • Plant Turbo-compressor Problem
  • Failing Plant Air Compressor Drives
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Recommended Articles

Thermocouple Extension Lead Problem
Arc Fault Breaker (AFB) Electrical Problem Solved
Erratic Radar Level Gauges Delays a Refinery Commissioning
[RCA] Pump Low throughput Eliminated
Learnings from the BP Refinery Explosion at Texas City
Plant Shutdown Analysis: Valve Closed and SOV Coil Failure
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Recent Comments

  • William Snyder on Top Non-PLC Certification Courses for Automation Professionals
  • Kamli on Top Free PLC Software
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals

Related Articles

Compressor IP Case Discharge Temperature Gradually Increases

Compressor Anti-Surge Control near-miss incident

Control Panel Instruments

Control Panel Instruments Problem Threatened Plant Shutdown

Alternate 110 KV Connection to Feeder A

Alternate 110 KV Connection to Feeder A

repairs of welding cast refractory lined box over the hot spots

Primary Reformer RFG main Hot Spots threaten Indefinite Outage

Magnetic Flow Meter Liner Damaged

Magnetic Flow Meter Liner Damaged and Winding Burnt

Temperature Sensors Fault

18 Temperature Sensors Fault Leads to Plant Shutdown

NH3 Plant Turbo-compressor Sudden Rise in Temperature

NH3 Plant Turbo-compressor Sudden Rise in Temperature

Cooling Water Circulating Pump Low throughput

Cooling Water Circulating Pump Low throughput Resolved

More Articles

The Principle of Dead Weight Pressure Tester

The Principle of Dead Weight Pressure Tester

SCL Language in Siemens Tia Portal

FOR DO Statement in SCL Language

Firmware Version in Siemens PLC

What is the Firmware Version of a PLC? – Siemens PLC Hardware

Level Measurement Objective Questions

Level and Density Measurement Objective Questions

Jet Pump

What is a Jet Pump? – Principle, Types, Comparison

Instrumentation loop Diagram

Instrumentation Loop Diagrams

Transmission Lines Protection Questions Answers

Transmission Lines Protection Questions Answers

solenoid valves trip

Identify Solenoid Valves Energized or de-energized?

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?