Inst ToolsInst ToolsInst Tools
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: Practical Process Control System Questions & Answers – 2
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Practical Questions > Practical Process Control System Questions & Answers – 2

Practical Process Control System Questions & Answers – 2

Last updated: June 22, 2018 11:11 am
Editorial Staff
Practical Questions
2 Comments
Share
3 Min Read
SHARE

On the job, you are sent to troubleshoot a brand-new control system, consisting of a pneumatic liquid level transmitter connected to a pneumatic controller, which in turn drives a pneumatic control valve. The process vessel, piping, control valve, controller, and level transmitter are all brand-new: they even sport a fresh coat of paint.

Practical Control Systems Questions & Answers - 2

According to the unit operator, this level control system has never worked. As she shows you, the liquid level inside the vessel is so low that the level gauge (LG) registers empty, yet the controller is commanding the valve 100% open, which of course continues to drain the vessel and prevent any liquid level from accumulating.

Being versed in process control theory, you decide to check how the controller is configured. Looking inside the controller case, you notice the controller is set for direct action: an increasing PV results in an increasing output signal (MV), which will move the air-to-close valve more toward the “closed” state.

Realizing how to fix the problem, you reach inside the controller and move a lever that switches it into reverse action mode.

Explain why this fixes the problem.

More Questions :

  1. Explain the significance of the “newness” of this process. How would your assumptions differ if you saw this process vessel was old and rusted instead of shiny-new?
  2. How do you suppose the controller got to be mis-configured in the first place?
  3. What would have to be different in this control system to permit a direct-acting controller instead of a reverse-acting controller?
  4. Suppose you did not discover the controller’s action set for direct action. If the controller had been left in manual mode instead of automatic mode, could this account for the problems exhibited by this system?

Share Your Answers via Comments

More Questions & Answers :
Practical Process Control System Questions & Answers – 1
Practical Process Control System Questions & Answers – 2
Practical Process Control System Questions & Answers – 3
Practical Process Control System Questions & Answers – 4
Practical Process Control System Questions & Answers – 5
Practical Process Control System Questions & Answers – 6
Practical Process Control System Questions & Answers – 7
Practical Process Control System Questions & Answers – 8
Practical Process Control System Questions & Answers – 9
Practical Process Control System Questions & Answers – 10
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Recommended Articles

Air Pressure Regulator Questions
Differential Pressure Transmitter with 5 Way Manifold Valve
Pressure Transmitter Re-Range Questions
How Nuclear Radiation is used to Measure Coke Dust Level?
Level Measuring Instruments Velocities of Propagation
Electric-driven Air Compressor Troubleshooting
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
2 Comments
  • Mohammed Irfan Ali says:
    July 9, 2020 at 2:22 pm

    If the LG is showing empty but the controller is in 100% open that means it’s already in reverse action. And we have to change to direct action but the above summary contradicts.

    Reply
  • Rizwan Ashraf Adil says:
    July 17, 2024 at 12:18 am

    The issue is that the controller is configured for direct action, which means that as the process variable (PV) increases, the output signal (MV) also increases, closing the valve. However, in this specific application, the goal is to control the liquid level in the vessel. When the level is low (PV is low), the valve should be open to allow more liquid to flow in. Conversely, when the level is high (PV is high), the valve should close to prevent overfilling.

    By switching the controller to reverse action mode, you’ve effectively changed the controller’s behavior to:

    – Increasing PV (level) → Decreasing MV (valve opening)
    – Decreasing PV (level) → Increasing MV (valve opening)

    Now, when the level is low (PV is low), the controller output (MV) will increase, opening the valve to allow more liquid to flow in. As the level rises (PV increases), the controller output (MV) will decrease, closing the valve to prevent overfilling.

    This fixes the problem because the controller is now working in tandem with the valve to regulate the liquid level in the vessel. The reverse action mode ensures that the valve opens when the level is low and closes when the level is high, which is the correct behavior for this specific application.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Recent Comments

  • William Snyder on Top Non-PLC Certification Courses for Automation Professionals
  • Kamli on Top Free PLC Software
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals
  • Guifty Shimica on Top Non-PLC Certification Courses for Automation Professionals

Related Articles

Motor ladder Logic

Draw a ladder logic circuit for the electric motor of an air compressor ?

Sump Tank Level Transmitter

Problem with Sump Tank Level Transmitter

Determine Calibration Range of Pneumatic Pressure Transmitter

Determine Calibration Range of Pneumatic Pressure Transmitter

Steam flow to the heat exchanger

Analytical Control System of Heat Exchanger Questions

level control system

Practical Process Control System Questions & Answers – 10

hydraulic module

Identify all Spool Valve Positions

A Question on Density Gauge

Siemens PLC Questions

Programmable Logic Controller (PLC) Questions and Answers – 11

More Articles

Electrical Machine Design Objective Questions and Answers

150+ Electrical Machine Design Objective Questions and Answers

Unbonded Strain Gauge Principle

Unbonded Strain Gauge Principle

optical fibers terminations

Fiber Optic Data Communication

100 Electronics and Electrical Projects for Engineering Students

100 Electronics and Electrical Projects for Engineering Students

Root Cause Analysis of Differential Pressure Level Transmitter

Root Cause Analysis of Differential Pressure Level Transmitter

Power Electronics Objective Questions

Single Phase Semi-Converter Multiple Choice Questions

reactor vessel

Practical Process Control System Questions & Answers – 5

Pressure Transmitter Calibration Procedure

Pressure Transmitter Calibration Procedure

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?