Inst ToolsInst ToolsInst Tools
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: P&ID Guidelines for Pig Receivers
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Erection & Commissioning > P&ID Guidelines for Pig Receivers

P&ID Guidelines for Pig Receivers

Last updated: September 29, 2016 2:58 pm
Editorial Staff
Erection & Commissioning
No Comments
Share
5 Min Read
SHARE
Typical P&ID arrangement for Pig Receivers
 
pid-guidelines-for-pig-receivers

Pig launchers and receivers are commonly used in upstream oil and gas industry for periodic cleaning of pipelines carrying crude oil, natural gas and water from oil wells. A pig is a bullet shaped object which fits the pipeline from inside. The pig launcher launches the pig into pipeline and the upstream pressure pushes the pig to other end of the pipeline where it is received by the pig launcher. Hence generally arrangement for pig launchers and receivers are essentially the same, except for the difference between ‘Kicker line’ position for launchers and receivers. The sample drawing presents this general arrangement common to pig launchers and receivers.

  1. Proper equipment symbol for pig launcher (vertical or horizontal) should be selected first of all, as shown in the presented drawing. This should be selected from the list of equipment symbols on the legend sheets of a particular project.
  2. The major and minor barrels of the pig trap should be indicated as shown in the sample drawing. Minor barrel size is equal to pipeline size and the major barrel size is slightly larger.
  3. All the nozzles on the pig launcher should then be correctly represented with size and flanges. This includes door on the launcher, pig outlet to pipeline, kicker line, balancing line, PSV connection, purge, vent, drain and instrument nozzles, as shown in the sample drawing presented here. Typicalinstrumentation on the pig launcher would be pressure gauges and transmitters and pig indicators to know if the pig has been launched (or arrived in the case of pig receivers).
  4. Different lines connected to the pig launcher are the next to be drawn up. Line number, material class, size etc. is to be correctly assigned to each of the lines.
  5. Kicker line is used to pressurize the upstream side of pig so it can be launched. In case of receiver, kicker line provides an outlet for fluids arriving in the pig trap. Normally when pigging is not being performed, kicker line is closed using normally closed valve.
  6. Balancing line connecting the kicker line to minor barrel of the pig launcher, helps lower the pressure differential so that sudden shooting of the pig will not damage downstream automatic valves.
  7. A bypass line of the pig launcher is the normal route for the fluids when pigging is not taking place. This section upstream to the shutdown valve at beginning of pipeline can be protected against overpressure as indicated in the sample drawing.
  8. The hand operated valve (HV) on the bypass line is used to create a pressure differential for launching the pig (also for receiving the pig). A pressure differential indicator (PDI) has to be available to the HV operator to monitor the pressure differential.
  9. On the outlet of the pig launcher, another hand operated automatic valve is provided to open up the launcher upon pressurization.
  10. The pig launcher (and receiver) are also protected against overpressure with a PSV which discharges to flare. Typical representation of PSVs can be referred to in another article.
  11. Isolation valves, spectacle blinds, spacers etc. to be used for maintenance should be drawn up next, on various lines to and from the pig trap. The spectacle blinds, spacers etc. are usually connected right next to the isolation valves and equipment nozzles, as indicated in the sample drawing presented here.
  12. Drains should be provided either on major or minor barrel or on both for complete draining of  the pig trap after the pig is launched or received. Sample drawing has indicated drains on both the barrels. These drains are connected to the closed drain system.
  13. Vents to flare and to atmosphere are required on pig launchers. Venting to flare for depressurization of the pig launcher can be achieved using bypass on the relief valve. For maintenance, when pig is not in operation it can be vented to atmosphere.
  14. A utility connection is required to purge the pig launcher / receiver after the pigging is done and the pig trap is depressurized and drained. A nitrogen connection should normally be provided as indicated in the sample drawing.
  15. Most of the guidelines mentioned for pig launchers also hold good for pig receivers.
  16. All the guidelines given here are very general and may be modified as per specific requirements of any particular project.
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Tube Fitting Types
Monsoon Protection for Field Instruments and Junction Boxes
Pressure Transmitter Vent fittings
Installation and Calibration of Level Transmitter
Pipeline Project Management
Installation & Commissioning Tips for HART Devices
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

Importance of Magnetic Flow Meters Grounding
Good and Bad Wiring Practices
Wrong Installation of Horn Type Radar Level Transmitter on Sloping Tank
Installation and Calibration of Pressure Transmitter
Turbine Flow Meter Installation Procedure
Instrument Tube Fitting Installation – Part 1
Installation Precautions of Thermocouple and RTD
Commissioning a Differential Pressure Transmitter in a Pressurized Boiler Steam Drum
Gas Detectors Installation Techniques
Instrument Tube Fitting Installation – Part 3

Keep Learning

Pressure Transmitters Installation Factors

Pressure Transmitters Installation Tips

P&ID Guidelines for Centrifugal Compressor Systems

P&ID Guidelines for Centrifugal Compressor Systems

Selection Guidelines for Cable Glands

Selection Guidelines for Cable Glands

Basics of Ground Loops

Basics of Ground Loops

How to Install Ultrasonic Level Transmitters 5

How to Install Ultrasonic Level Transmitters

Material Certificate versus Positive Material Identification (PMI)

Material Certificate versus Positive Material Identification (PMI)

Process flow diagram examples

What is Process Flow Diagram (PFD) ?

Hook-up Diagram for Pressure Gauge

What is Instrument Hook Up Diagram ?

Discover More

HVDC transmission compared to HVAC transmission

Comparison of HVDC transmission and HVAC transmission

Properties of Conducting Materials

Resistivity

Electromagnetic limit switch

Electromagnetic and Conductive limit switches Principle

How transformer works?

How transformer works?

Difference Between Single-stage and Multi-stage Compressor

Difference Between Single-stage and Multi-stage Compressor

How Does an Infrared Thermometer Work

How Does an Infrared Thermometer Work?

Difference Between Adhesion and Cohesion

Difference Between Adhesion and Cohesion

Wet Contacts and Dry Contacts in PLC Systems

Wet Contacts and Dry Contacts in PLC Systems

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?