Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Turbine Flow Meter (TFM) Problem

The US Process Licensor (UPL) insisted to calibrate the liquid NH3 flow through the turbine flow meter (TFM) before the urea plant guarantee test.

He turned a deaf ear to the author’s explanation that field calibration is rare and impractical; users trust the manufacturer calibration, which is stable over long periods.

Also Read: Turbine Flow Meter Calibration Procedure

Author solution

He connected a fire hydrant with a fire hose to the turbine flow meter (TFM) inlet, collected the TFM exiting the water in a chassis-mounted tanker that haul 25000 kg Phosphoric acid from the port to the plant (below figure), and weighed the empty and water-filled tanker.

Turbine Flow Meter (TFM) Field Calibration

The instrument crew set the TFM read-out counter’s scalar switches each count for 50 Kg Water flows the least the readout permits to maximize reading accuracy.

The TFM integrator read flow quantities at 33%, 66%, and 100% of max TFM flow rates differed from weighed quantities by 0.1% only against the

The turbine flow meters (TFM’s) guaranteed 0.25% uncertainties. The instrument crew calibrated and found the road weigh scale that weighed the tanker was 0.02% accurate against the guaranteed 0.046% i.e. around 6 times more accurate than the TM guaranteed accuracies.

Benefits Realized

Realized benefits are:

  1. The satisfied process licensor completed the guarantee test,
  2. The guarantee test identified 5% higher than guaranteed specific ammonia consumption per ton of urea.
  3. The licensor root cause analyzed and corrected the deficiencies
  4. The repeat guarantee test shown ammonia specific consumption was acceptable
  5. The vendor got his final payment and left
  6. The correct ammonia specific consumptions benefit the plant too forever.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

You've successfully subscribed !
Share

Recent Articles

  • PLC Tutorials

Conveyor Sorting Machine PLC Program with Calculation Function

The conveyor sorting machine is widely used in the packing industries using the PLC program…

5 days ago
  • PLC Tutorials

Example of Flip-Flop PLC Program for Lamps Application

Learn the example of flip-flop PLC program for lamps application using the ladder logic to…

5 days ago
  • PLC Tutorials

STAR DELTA Programming using PLC Controller

In this article, you will learn the STAR DELTA programming using PLC controller to start…

5 days ago
  • Instrumentation Design

Single and Three Phase Immersion Electrical Heaters Wiring Circuits

Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…

3 days ago
  • Instrumentation Design

Immersion Heaters in Lube Oil Consoles

Rotating equipment packages such as pumps, compressors, turbines need the lube oil consoles for their…

5 days ago
  • PLC Tutorials

How to Blink Lights in Ladder Logic?

This article explains how to blink lights in ladder logic with a detailed explanation video…

4 weeks ago