GATE Instrumentation Questions and Answers
Try mock test questions on GATE Electronics and Instrumentation Engineering and check questions with corresponding answers. GATE Instrumentation Questions 1.
Try mock test questions on GATE Electronics and Instrumentation Engineering and check questions with corresponding answers. GATE Instrumentation Questions 1.
Write the PLC program to read the energy meter readings in the programmable logic controller (PLC) using Modbus Communication. Energy
Commissioning is the formal process of verifying and documenting that the installed field instruments and control systems comply with and
You can download the free trial version for Siemens TIA Portal, SIMATIC STEP 7, WinCC and PLCSIM Programming Softwares and
SCADA systems installed in Industry facilities must be of such design or otherwise protected to withstand seismic effects as well
Operator interface or human-machine interface (HMI) for SCADA systems provide the functions of status indication, alarm reporting, operator intervention in
Integral Flow Orifice Assembly is used when a Differential Pressure Transmitter has to be directly mounted on the orifice assembly.
Develop a PLC program that will simulate the gate array logic as shown in the below figure. Gate Array Logic
Communication networks may be used in control systems to pass data between field devices and PLCs, between different PLCs, or
Make the example ladder logic to control the motor in forward and reverse direction using PLC Programming with limit switches