The PLC documentation is a very important engineering record of the process control steps, and, as with all technical descriptions, accurate detailed engineering records are essential.
Without accurate drawings, changes and modifications needed for upgrading and diagnostics are extremely difficult or impossible.
Every wire from the PLC to the monitoring and control equipment must be clearly marked and numbered at both ends, and recorded on the wiring diagram.
The PLC must have complete up-to-date ladder diagrams (or other approved language), and every rung must be labeled with a complete description of its function.
1. System overview and complete description of control operation;
2. Block diagram of the units in the system;
3. Complete list of every input and output, destination, and number;
4. Wiring diagram of I/O modules, address identification for each I/O point, and rack locations;
5. Ladder diagram with rung description, number, and function.
It is also necessary to have the ability to simulate the ladder program off-line on a personal computer, or in a background mode in the PLC, so that changes, upgrades, and fault simulations can be performed without interrupting the normal operation of the PLC, and the effects of changes and upgrades can be evaluated before they are incorporated.
Share via Comments, if anything is missed from the list.
Article Shared by: V Manikanta
If you liked this article, then please subscribe to our YouTube Channel for PLC and SCADA video tutorials.
You can also follow us on Facebook and Twitter to receive daily updates.
Read Next:
VFD simulator download: Master the online tool from the Yaskawa V1000 & programming software for…
The conveyor sorting machine is widely used in the packing industries using the PLC program…
Learn the example of flip-flop PLC program for lamps application using the ladder logic to…
In this article, you will learn the STAR DELTA programming using PLC controller to start…
Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…
Rotating equipment packages such as pumps, compressors, turbines need the lube oil consoles for their…
View Comments
Really helpful contents! Thank you
thanx a lot I may use for teaching if u permit
Hi,
You can use our articles (class-room) with proper citation.