Inst ToolsInst ToolsInst Tools
  • Courses
  • Videos
  • Q & A
    • Interview
      • Instrumentation
      • Electronics
      • Electrical
      • Practical Questions
    • MCQ
      • Instrumentation MCQ
      • Electrical MCQ
      • Electronics MCQ
      • Control Systems MCQ
      • Analog Electronics MCQ
      • Digital Electronics MCQ
      • Power Electronics MCQ
      • Microprocessor MCQ
      • Multiple Choice Questions
  • EE
    • Electronics
      • Electronics Q & A
      • Electronic Basics
      • Electronic Devices & Circuits
      • Electronics Animation
      • Digital Electronics
    • Electrical
      • Electrical Basics
      • Electrical Q & A
      • Power Electronics
      • Electrical Machines
      • Electrical Animation
      • Power Systems
      • Switchgear & Protection
      • Transmission & Distribution
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: CO2 Stripper Collapsed Internals Revamp
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Root Cause Analysis (RCA) > CO2 Stripper Collapsed Internals Revamp

CO2 Stripper Collapsed Internals Revamp

Renewing the CO2 stripper collapsed internal trays was a recurring and expensive turnaround job since plant commissioning a decade ago.

Last updated: September 28, 2022 3:08 pm
S Raghava Chari
Root Cause Analysis (RCA) Process Fundamentals
No Comments
Share
5 Min Read
SHARE

Every turnaround (TA) done CO2 Stripper collapsed internals revamp – a perennial problem eliminated.

Contents
CO2 Stripper ProblemAuthor SolutionBenefits of the RCA based solution
Article Type:Root Cause Analysis (RCA)
Category:Mechanical
Equipment Type:Pipelines and Miscellaneous Problems
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

CO2 Stripper Problem

Renewing the CO2 stripper collapsed internal trays was a recurring and expensive turnaround (TA) job since plant commissioning a decade ago.

The tech services engineers wastefully insisted on unachievable accuracies while shop fabricated replacement trays involving wasted time and money. It did not help.

They ridiculed the author – then instrument engineer – suggestion to increase the 6 mm dia tray fasteners to 12 mm and locking the nuts. They cautioned that step would collapse the very stripper – absurd, fantastic and unrealistic in the author’s opinion!

Author Solution

The author – by then General Manager – called meeting arrived at no practical solution. Hence, he invited Engineers India – a detailed engineering design and construction co – services to solve the decade long CO2 stripper problem.

The author too entered the stripper vessel top with the visiting engineer let us call him Ram. Immediately an idea flashed and he exclaimed, “Ram”, top tray to dome distance is hardly 1.5 m just enough for us to stand;

I think when the rich K2CO3 solution letdown from 35 bars to 1-bar enters the stripper, where is the space for the thousands of m3 of liberated CO2?

I think the enormous volumes of liberated CO2 collapse the top trays and the falling top trays collapse the remaining like in the children’s card game of one falling card fells all!

I could not visualize this during my several problem-solving drawing studies, and I see it clearly now on the spot! I do not know how to solve the problem.

Our tech services rejected my suggestion to increase the fastener sizes and locking the nuts for strengthening”.

Ram too exclaimed, “Sir, you have hit the nail on the head; lack of space for the released CO2 is trays collapse root cause; larger fasteners and nuts locking will certainly help.

In fact, I suggest doubling the support ring thickness too. You go back sir; I will study in detail and submit my report to you in the evening”. 

Ram’s day end submitted report contents are:

  1. Remove trays 36 to 40 (5 Nos.) to provide more space for the released CO2 enormous volumes
  2. Fasten the entire remaining trays with 12 mm fasteners instead of the 6 now and lock the nuts
  3. Replace the present 12 mm thick support rings with 16 or even 20 mm thick and 3 times radial width rings to increase bolt size in future if required

The author implemented 1 and 2 only, as welding thicker support rings to 25 mm thick stripper shell involves difficult post weld stress relief.

Benefits of the RCA based solution

  1. Vanished forever tray collapses, associated vanished repair expenses and shortened turnaround (TA) made all jubilant, except the contractor who revamped the stripper every TA
  2. Perhaps the trays collapsed immediately on rich K2CO3 admission at the very start after TA and the stripper worked like a packed tower and did not strip the CO2 entirely from the K2CO3 solution – the cause of the absorber exiting Syn gas high CO2 content, increased methanator load and increased purge and 2-5 tons lost ammonia production
  3. Better methanator performance after that TA confirms this conclusion

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • Problems with Demister Pads
  • Steam Letdown Station Problems
  • Demineralization Mixed Bed Vessel
  • Screen Vibrators Perennial Problems
  • Urea Reactor Top Bolted Plug Leaks
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Filters in Compressors
What is Pump Redundancy?
Introduction to Chemical Dosing System
18 Temperature Sensors Fault Leads to Plant Shutdown
Erratic H2 Flow Rotameter
Plant Shutdown Analysis: Valve Closed and SOV Coil Failure
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

Bucket elevators Chain and teeth wear Problems
Miscellaneous Electrical Tasks – Repaired Reformer Tubes Weld Stress Relief
Desuperheater Design
Control Valves Leak Tightness Restoration Pose Difficulties
Ball Float Steam Trap
Pressurizer
Replace Failed Motors Quickly and Easily
Antifriction bearings (AFB) Problems and Delays Plant Restarts
Malfunctioning Inlet Check Valves caused chaos at Compressor stop/trip
Aluminum Cable Terminations Repeat Failures

Keep Learning

Fired Boiler Induced Draft Fan (IDF) Failures

Fired Boiler Induced Draft Fan (IDF) Failures Upset all Plants Operations

Cooling Water Circulating Pump Low throughput

Cooling Water Circulating Pump Low throughput Resolved

Rupture Disc

Rupture Discs bursts caused too many Urea Plant Shutdowns

Modern Cement Kiln Drive

Cement kilns, Rotary Drum Driers Simplest Electrical Drive

Amine Pump Trip - Root Cause Analysis

Amine Pump Trip – Root Cause Analysis

Less than 40% available Plant Air Compressors made available 100%

Less than 40% available Plant Air Compressors made available 100% for Operations

Multi-Cartridge Filter

Cartridge Filters

Pumps Quiz

Pumps Quiz

Discover More

3φ AC Power Connections

Three Phase Systems

Lithium-ion Battery Charging System

Lithium-ion Battery Charging Systems

PLC Program for Valves

PLC Pump Permissive Interlocks

Pilot operated Solenoid Valve Principle

How Pilot operated Solenoid Valve Works ?

IS Loop Formula

Difference between Intrinsic Safe and Non-Intrinsic Safe Cables

Project Planning and Implementation of PLC or DCS Control System

Project Planning and Implementation of PLC or DCS Control System

Download Electrical Enclosure Book

Download Electrical Enclosure Book

Control Speed of an Induction Motor using Analog Output of PLC

Control Speed of Induction Motor using Analog Output of PLC

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?