By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Inst ToolsInst ToolsInst Tools
  • Courses
  • PLC Tutorials
  • Control Systems
Search
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Reading: Run 4 Motors Sequentially from Same Push button PLC Program
Share
Notification Show More
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • PLC Tutorials
  • Control Systems
Search
  • Ask
  • Courses
  • Videos
  • Q & A
    • Interview
    • MCQ
  • EE
    • Electronics
    • Electrical
  • Measure
    • Control Valves
    • Calibration
    • Temperature
    • Pressure
    • Flow
    • Level
    • Analyzers
    • Switches
    • Vibration
    • Solenoid Valve
  • Control
    • PLC Tutorials
    • Control Systems
    • Safety Instrumented System (SIS)
    • Communication
    • Fire & Gas System
  • More
    • Design
    • Tools
    • Animation
    • Basics
    • Formulas
    • Standards
    • TextBooks
    • Common
    • Software
    • Excel Tools
    • Erection & Commissioning
    • Process Fundamentals
    • Videos
    • Books
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > PLC Tutorials > Run 4 Motors Sequentially from Same Push button PLC Program

Run 4 Motors Sequentially from Same Push button PLC Program

Last updated: March 4, 2021 11:50 am
Editorial Staff
PLC Tutorials
No Comments
Share
3 Min Read
SHARE

In some industrial automation applications, you may need to operate more than one motor or pump in sequential order by the same digital input such as start push button.

Contents
Inputs & outputs:Run 4 Motors Sequentially from Same Push buttonPLC ProgramFirst network:Second network:Third network:Fourth network:

Write a PLC program to run 4 motors in a case that every time you press the same push button it runs one motor at a time and then press the stop pushbuttons all motors should be stopped.

Note the best practice to learn the PLC programming is to start writing the PLC program, take your time before you review the answer.

Inputs & outputs:

  • I0.0: Start (Normally open contact)
  • I0.1: Stop (Normally closed contact)
  • Q0.0: Motor_01
  • Q0.1: Motor_02
  • Q0.2: Motor_03
  • Q0.3: Motor_04
  • M0.0: marker for positive edge
  • M0.1: marker for positive edge
  • M0.2: marker for positive edge

Run 4 Motors Sequentially from Same Push button

Run 4 Motors Sequentially from Same Push button PLC Program

PLC Program

First network:

Motor # 04 will be on if the motor# 03 is on and a positive edge is detected from the Start Push Button. And will be off if the stop push button is pressed.

Second network:

Motor # 03 will be on if the motor# 02 is on and a positive edge is detected from the Start Push Button. And will be off if the stop push button is pressed.

Third network:

Motor # 02 will be on if the motor# 01 is on and a positive edge is detected from the Start Push Button. And will be off if the stop push button is pressed.

Fourth network:

Motor# 01 will be on if the start push button is pressed. And will be off if the stop push button is pressed.

Why we used positive edge detection? To avoid running all the motors in one time if the push button is pressed for the first time.

The order of all the networks is important. That’s why you can see the first network is dedicated to the 4th motor and so on, that’s because the fact that the PLC executes the program as the following it first reads all the inputs, then executes the program from the first network to the last network and then move the outputs values upon the program execution.

Author: Karim Ali Anwar

If you liked this article, then please subscribe to our YouTube Channel for PLC and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

  • FC Function in Siemens
  • Pulse Generation using PLC
  • Motor Control Circuit
  • Memory Structure of PLC
  • What is Motor Jogging?
Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !
Two Hand Control Logic using PLC
Modbus Communication between PLC and Energy Meter
Studio 5000: Programming Three Motors with Fixed Priorities
Omron PLC Logic for Washing Machine Automation
Modbus Communication between Delta PLC with VFD
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
208kSubscribersSubscribe
38kFollowersFollow

Categories

Recent Comments

  • MIHARITSOA Aina Sitraka on Top Non-PLC Certification Courses for Automation Professionals
  • Vaishnavi on Free Instrumentation Course for Trainee Engineers
  • anuj kapoor on DCS Program to Maintain Draft in Furnace
  • anuj kapoor on IoT based Smart Boiler Control System with Cloud PLC and SCADA

Related Articles

Difference Between Microcontroller and PLC

Difference Between Microcontroller and PLC

Advanced PLC Programming Training Course

Advanced PLC Course with Programming and Simulation

Omron PLC painting program

Product Painting PLC Program using Omron CX-Programmer

factorytalk view studio hmi

How to Create Templates in FactoryTalk View Studio?

Case Statement in SCL Language

Case Statement in SCL Language

Thin Client in SCADA

What is Thin Client in SCADA? – Purpose, Advantages

Proper Earthing Practices Used for PLC Control Panel

Proper Earthing Practices Used for PLC Control Panel

PLC Fault Diagnosis - PLC Training Documents

PLC Fault Diagnosis – PLC Training Documents

More Articles

Bubbler Level Measurement Animation

Bubbler Level Measurement Animation

Fiber Optic Patch Cord

What is a Fiber Optic Patch Cord? – Types, Explained

Leave Operational Logic in the PLC

#3 PLC Best Practices – Leave Operational Logic in the PLC wherever feasible

Standard Test Signals Objective Questions

Standard Test Signals Objective Questions

Control Systems Questions & Answers

Control Systems Objective Questions & Answers – Set 7

PLC Program for Forward and Reverse Motor control

3 Phase Motor Control using PLC Ladder Logic

PLC analog input scaling

PLC Analog Input Scaling

Components of Electrical Motor

What is Electrical Slip Ring? Principle, Types, Advantages, Applications

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?