Root Cause Analysis (RCA)

11 KV Bus A to Bus B Phase Check Problem

Electrical engineering root cause analysis (RCA) related to 11 KV bus A to bus B short circuit problems.

Article Type:Root Cause Analysis (RCA)
Category:Electrical
Equipment Type:Motors
Author:S. Raghava Chari

Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

11 KV Bus A to Bus B Phase Check Problem

After electricity board line maintenance, 11 KV bus-A to B-bus essential phase sequence check assures short circuit danger-free buses paralleling.

Crew wary of doing this very high voltage check, even when given certified gloves, and test probes skipped it relying on electricity board assurance.

Author Solution

The author advised:

  1. Leave the 11 KV A to B bus connecting bus‑tie
  2. Check the phase sequence at any 400 V load center Bus A to Bus B. This is adequate, since all internal connections remain the same.

Benefits of this Method

  1. Crew cheerfully and unhesitatingly performed the essential safety assurance test free from fears of working with live 11 KV conductors.
  2. Potential dangers of opening live 11 KV system panels and handheld probes touching live 11 KV buses are absent
  3. Crew perform an essential safety step cheerfully

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

You've successfully subscribed !
Share

Recent Articles

  • PLC Tutorials

Example of Flip-Flop PLC Program for Lamps Application

Learn the example of flip-flop PLC program for lamps application using the ladder logic to…

3 days ago
  • PLC Tutorials

STAR DELTA Programming using PLC Controller

In this article, you will learn the STAR DELTA programming using PLC controller to start…

4 days ago
  • Instrumentation Design

Single and Three Phase Immersion Electrical Heaters Wiring Circuits

Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…

1 day ago
  • Instrumentation Design

Immersion Heaters in Lube Oil Consoles

Rotating equipment packages such as pumps, compressors, turbines need the lube oil consoles for their…

3 days ago
  • PLC Tutorials

How to Blink Lights in Ladder Logic?

This article explains how to blink lights in ladder logic with a detailed explanation video…

3 weeks ago
  • PLC Tutorials

From Boolean Algebra to PLC Logic

In this article, a simple example will teach you the conversion from Boolean algebra to…

1 month ago