Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.

Thermocouple Extension Lead Problem

Study the previously discussed Problem: The thermocouple (TC) flange fire had burnt the 50-m long 30-pair chromel-alumel extension cable connecting the Mineral Insulated Thermocouples (MITC) JB to the control room instruments.

Airfreight from the US takes a minimum of one month. Vendors quoted min 6 months delivery and no plants could loan or sell.

Author solution

The author developed the below-given steps to solve the difficult unresolvable despairing problem (DDUDP).

  1. Run a rush purchased 30‑core 1.5 mm2 copper cable and single pair TC extension lead from JB1 to panel terminals. Luckily, sufficient length single pair extension lead was left after solving problem 19..
  2. Convertor TCs jointed extension leads (Read Previous Problem) already terminate on JB terminals; Cut measured length plus 3 meter extra EL from the EL drum used in previous problem. Connect one wires to a JB1 terminal and the other end wires to the panel instrument as in fig 1. In effect this TC is a thermocouple with measuring junction (jn) at JB1 terminals.
  3. Connect the 30-core copper cable wires to panel instrument according to fig 1
  4. The temperature system is ready
Thermocouple Extension Lead Problem
Figure 1

How does the above-described modification work?

Fig shown circuit explanation

#ParticularsData
1Convertor TC emf outputTM-TJB1
2Shorted Single pair Ext Lead emf outputTJB1 – TI
I-Panel Inst
3Fig: connections add 1+2
4Hence EMF at instrument terminals(TM-TJB1)+(TJB1-TI) = (TM-TI)
5The instrument’s cold junction compensation adds emf = TI. Hence the instrument reads the measured temperature TM Correctly

Benefits Realized

Benefits Realized are A total plant shutdown (SD) causing DDUDP resolved inexpensively.

Instrument crew and supervisors learned that one can solve most problems by applying job knowledge and innovations; hence, all should relentlessly increase job knowledge by studying vendor literature, tech journal articles and ads, and remembering these for timely use.

Author: S. Raghava Chari

Do you face any similar issues? Share with us through the below comments section.

If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

You've successfully subscribed !
Share

Recent Articles

  • PLC Tutorials

VFD Simulator Download – Free Yaskawa V1000 Software

VFD simulator download: Master the online tool from the Yaskawa V1000 & programming software for…

3 days ago
  • PLC Tutorials

Conveyor Sorting Machine PLC Program with Calculation Function

The conveyor sorting machine is widely used in the packing industries using the PLC program…

6 days ago
  • PLC Tutorials

Example of Flip-Flop PLC Program for Lamps Application

Learn the example of flip-flop PLC program for lamps application using the ladder logic to…

6 days ago
  • PLC Tutorials

STAR DELTA Programming using PLC Controller

In this article, you will learn the STAR DELTA programming using PLC controller to start…

6 days ago
  • Instrumentation Design

Single and Three Phase Immersion Electrical Heaters Wiring Circuits

Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…

3 days ago
  • Instrumentation Design

Immersion Heaters in Lube Oil Consoles

Rotating equipment packages such as pumps, compressors, turbines need the lube oil consoles for their…

6 days ago