Root Cause Analysis (RCA): Seawater pipeline spools from day-1 leaks threaten NH3 plant indefinite shutdown.
Article Type: | Root Cause Analysis (RCA) |
Category: | Mechanical |
Equipment Type: | Pipelines and Miscellaneous Problems |
Author: | S. Raghava Chari |
Note: This root cause analysis (RCA) is from real-time scenarios that happened in industries during the tenure of two or three decades ago. These articles will help you to improve your troubleshooting skills and knowledge.
Why do the final spools only leak and not the rest of the seawater pipelines?
The spools that came from Japan did not fit due to excessive axial and lateral offsets between the surface condenser nozzles and the concrete floor buried pipes vertical legs connected to the nozzles.
Hence, the erectors bolted the cut flanges from the spools to condenser flanges, adapted the pipes to match the flanges, and welded these in-situ.
Then they removed the damaged lining and rush epoxy-coated the bores to meet the start-up deadline. Perhaps the rushly done epoxy coatings are inadequate. Hence, the spools only leak!
CLs’ severe lateral and axial misalignments mentioned above, precludes spools prefabrication, lining, and replacing finished spools at convenient schedules.
A week of constant thinking flashed an answer to the author He stopped the 3.5 bar pressure seawater 6-10 dia jets by driving wooden taper plugs epoxy sealed them.
Then welded longitudinally split two halves of the next larger sized pipe as a jacket (below fig). Molten asphalt fill in the annular space serves as an in‑situ jacket bore seawater corrosion even in case the entire original pipe corrodes away.
Crew jacketed the entire 42 Nos. of spools working general shift hours only.
Non-amenability to prefabrication made spools replacement impractical during the plant’s 15‑day turnaround (TA) 30-months hence.
Again, another innovation – cement lining the spools solved the problem; with two bonus benefits viz. low costs, and stronger adherence to even corroded rough surfaces. Rubber or other linings require new spools of sandblast cleaned smooth surfaces.
Below listed are the innovative solution benefits
Author: S. Raghava Chari
Do you face any similar issues? Share with us through the below comments section.
If you liked this article, then please subscribe to our YouTube Channel for Instrumentation, Electrical, PLC, and SCADA video tutorials.
You can also follow us on Facebook and Twitter to receive daily updates.
Read Next:
In this article, we are going to discuss about shutter door control using induction motor…
Electrical Drives control the motion of electric motors. Motion control is required in industrial and…
PLC ladder logic design to control 3 motors with toggle switch and explain the program…
VFD simulator download: Master the online tool from the Yaskawa V1000 & programming software for…
The conveyor sorting machine is widely used in the packing industries using the PLC program…
Learn the example of flip-flop PLC program for lamps application using the ladder logic to…