Unreliable Ammonia Flow Transmitter Reading and Problems
Instrumentation engineering root cause analysis of unreliable ammonia flow transmitter reading and problems.
Instrumentation engineering root cause analysis of unreliable ammonia flow transmitter reading and problems.
Serious constraints which prevent using an available 3” 150# flanged turbine flow meter made flangeless for Bolting between 300 # RF Flanges.
Identify PLC critical alerts and program a trap to monitor the trigger conditions and the alert state for any deviation.
Measure and provide a baseline for memory usage for every PLC controller deployed in the production environment and trend it on the HMI.
Store PLC hard stop events from faults or shutdowns for retrieval by HMI alarm systems to consult before PLC restarts.
Log PLC uptime to know when it’s been restarted. Trend and log uptime on the HMI for diagnostics.
Summarize PLC cycle time every 2 to 3 seconds and report to HMI for visualization on a graph using trend.
Define safe states for the process in case of PLC restarts (e.g., energize contacts, de-energize, keep the previous state).
Restrict the type of PLC connections and available data for third-party data interfaces in a programmable logic controller,
Disable unused communication ports and protocols that are not required in PLC controllers and network interface modules.