Inst ToolsInst ToolsInst Tools
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Search
  • Books
  • Software
  • Projects
  • Process
  • Tools
  • Basics
  • Formula
  • Power Plant
  • Root Cause Analysis
  • Electrical Basics
  • Animation
  • Standards
  • 4-20 mA Course
  • Siemens PLC Course
Reading: OPC in Old PLC Systems
Share
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • Design
  • PLC
  • Interview
  • Control System
Search
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > PLC Tutorials > OPC in Old PLC Systems

OPC in Old PLC Systems

Last updated: March 4, 2021 12:09 pm
Editorial Staff
PLC Tutorials
No Comments
Share
6 Min Read
SHARE

OPC (Object Linking and Embedding for process control) was released in 1996 by the OPC Foundation and was soon adopted for the interoperability of industrial systems.

Contents
OPC in PLC SystemsWhich OPC is Commonly Used in Old PLC Systems?How does Classic OPC Work in PLC Systems?Why is Classic OPC Suitable for Old PLC Systems?Advantages of OPC in older PLC Systems

The name was later changed to Open Platform Communications in 2011 to broadening variations beyond Microsoft’s pioneer OPC. As a mechanism for interoperability, it is used by OPC Servers to provide data to PLC applications like HMI and Historian via OPC Clients.

OPC in PLC Systems

OPC in PLC Systems

OPC Basics (Source: Novotek)

Which OPC is Commonly Used in Old PLC Systems?

Among the first OPC, versions to be introduced include OPC Data Access (OPC DA) in 1996, OPC Alarms & Events (OPC AE) in 1999, and OPC Historical Data Access (OPC HDA) in 2001. These three were designated as classic OPC after the introduction of OPC UA.

While all three are highly compatible and preferred for old PLC systems, OPC DA stands out as the most commonly used. Classic OPC Clients and Servers send commands, requests, and data using Microsoft’s COM (Component Object Model) and DCOM (Distributed COM) technologies.

OPC Server and Client implemented in old PLC systems interact using COM when the programs reside in the same computer, and DCOM is used when the data being exchanged is located on a network.

How does Classic OPC Work in PLC Systems?

An OPC Client sends a request and goes into receive mode waiting for the OPC Server to transmit the data. With this classic architecture, OPC Server can support hundreds of OPC Clients without configuration or other details about the PLC.

On the other end, OPC Server exploits its knowledge of the protocol/API spoken by the PLC to retrieve the data requested by the Client from the PLC. Subsequently, the Server converts the data to OPC using embedded protocols like Modbus before sending it to the Client.

The design and specifications of classic OPC enable real-time interaction between hardware like devices on the factory floor and Human-Machine Interface (HMI) on Client-side like a jolly stick used by the operator via OPC Server.

OPC Servers are not designed as one-fits-all. For you to access data from a specific PLC, you need an OPC Server that knows how to talk to the PLC you’re interested in. Some manufacturers design unique OPC Servers for their PLCs while others rely on third-party providers.

For example, setting up an OPC Server/Client for Allen Bradley’s Controllogix and CompactLogix PLCs requires an RS-Linx Gateway license. Additionally, you will have to program an OPC Server for you to obtain the data you need. Apart from programming and suitability of OPC Server, data retrieval is also influenced by the robustness of the OPC Server software.

This is why it is important to seek the services of professionals and experts in classic OPC, OPC Server/Client, and all matters related to PLC systems. Through SupportPoint, you can access the expertise you need very quickly.

Why is Classic OPC Suitable for Old PLC Systems?

Classic OPCs are designed to offer a common bridge for process control hardware and software applications to interface SCADA and other HMIs. This protocol design allows access to field data from plant floor devices consistently regardless of data type and source.

In old PLC systems using the traditional I/O, OPC Server communicates securely over Ethernet, serial, and so on. For instance, the OPC Server used by Allen Bradley PLCs communicates over DH+, DF1, DH485, and Ethernet/IP.

One of the reasons why classic OPC is preferred for old PLC systems can be explained using Allen Bradley’s DH+ electrical interface, which uses differential signaling. The electrical interface consists of two transmission channels that do not have the same ground potential, which carries data represented as the difference in voltage.

Any common interference as noise is ignored since the data exchanged is encoded differentially, and all non-transmitting nodes go into receive mode when one node transmits. This process protocol is compatible with Server-Client interaction under classic OPC specification, where the Server only serves up data requested by the Client.  OPC Server waits for a request, and OPC Client waits for data after sending the request.

Advantages of OPC in older PLC Systems

An OPC system can extend the usability and the economic lifetime of your older or obsolete PLC system. Older proper working PLC systems do not have to be replaced if the operating and process still meet the requirements. Just extend the useful lifetime by adding solutions like OPC.

If you do not have the knowledge for an update like this or run into problems: new possibilities are available! Online expert support for PLC challenges like this.

Visit www.supportpoints.com for more information or drop us a message via [email protected] and we’re happy to help!

If you liked this article, then please subscribe to our YouTube Channel for PLC and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Door Lock with Delay PLC Exercise Problems
Instrumentation Engineer Activities & Documents – Detail Design Phase
Comparing ICS and IT Systems Security
Yokogawa DCS and SIS System Architecture
Count the Number of Cartons in a Storage Area PLC Logic
What is the DDE Protocol?
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
210kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

How to Connect Mitsubishi FX3U PLC with Weinview MT6071iE HMI?
Cars Garage Counter From the Same Door PLC Logic
PLC based Automatic Bell System for a School
Five Types of PLC Programming languages
Free Industrial Control System (ICS) Cyber Security Training Course
Job Skills Required for Industrial Electrical Maintenance
Automatic Car Washing using PLC
PID in Studio 5000

Keep Learning

PLC Ladder Logic Simulator Mobile Apps For Android

PLC Ladder Logic Simulator Mobile Apps For Android

PLC Program for Counting Objects on Conveyor

PLC Program for Counting Moving Objects on Conveyor

Codesys function block example

Create a User-Defined Function Block in Codesys

A Typical Sequential Function Chart

What is Sequential Function Chart (SFC?)

PLC Control for Baking Machines Logic

PLC Programming for Baking with Auto and Manual Modes

Types of PLC Memory

Types of PLC Memory

Difference Between PLC and CNC Machine

Difference Between PLC and CNC Machine

Ladder Logic for Flow Meter Totalizer

Ladder Logic for Flow Meter Totalizer

Learn More

Differential Pressure Transmitter Manifold

Field Instrument Calibration Errors

Control Valves Multiple Choice Questions

Control Valves Multiple Choice Questions

Ball Valve Parts

What is Ball Valve ?

FDA Process Validation

Why You Need FDA Process Validation and How to Do It Right ?

Alarm Chattering

Categorization of Alarms in a Process Plant

How to Upload PLC Program in Siemens PLC if Upload Icon is Disabled

Upload Option Disabled in Siemens PLC

DDE Protocol

What is the DDE Protocol?

PLC Automation for Product Weighing and Labeling

PLC Controlled Conveyor and Weighing with Labeling Automation

Menu

  • About
  • Privacy Policy
  • Copyright

Quick Links

  • Learn PLC
  • Helping Hand
  • Part Time Job

YouTube Subscribe

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?