Inst ToolsInst ToolsInst Tools
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Search
  • Books
  • Software
  • Projects
  • Process
  • Tools
  • Basics
  • Formula
  • Power Plant
  • Root Cause Analysis
  • Electrical Basics
  • Animation
  • Standards
  • 4-20 mA Course
  • Siemens PLC Course
Reading: Programmable Logic Controller (PLC) Questions and Answers – 2
Share
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • Design
  • PLC
  • Interview
  • Control System
Search
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > Practical Questions > Programmable Logic Controller (PLC) Questions and Answers – 2

Programmable Logic Controller (PLC) Questions and Answers – 2

Last updated: June 6, 2018 10:06 am
Editorial Staff
Practical Questions
1 Comment
Share
1 Min Read
SHARE

Suppose we have a PLC connected to three process switches as shown in this illustration:

PLC Questions - 2

In the above diagram :

  • X1 to X4 : Inputs
  • Y1 to Y4 : Outputs

Determine the switch actuation statuses (i.e. low versus high process stimulus) given the “live” display of the ladder logic program shown here:

PLC switch actuation

Also, determine the status of the lamp connected to the PLC’s Y1 output.

Answer : 

  • High pressure and low flow and low temperature.
  • The lamp will be de-energized.

Share Your Answer / Comments

Credits :  Tony R. Kuphaldt – under CC BY 1.0

For More PLC Questions : CLICK HERE

 

Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Resistance Temperature Detector (RTD) Questions – 1
Hydrostatic Pressure Measurement Questions
Determine the functions of Pressure Switches ?
Analytical Control System of Heat Exchanger Questions
Practical Process Control System Questions & Answers – 7
Instrument Salesperson Question
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
1 Comment
  • Hitesh says:
    December 31, 2018 at 12:55 pm

    The lamp will be energized when pressure & flow high & temp low

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
210kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

Find Thermocouple Ouput Voltage
Liquid Level Measurement using Pressure Transmitter Questions
Level Measuring Instruments Velocities of Propagation
Displacer Type Density Transmitter Question
Calculate Temperature of RTD
Identify High Flow Alarm and Low Flow Alarm?
Compressor Emergency Shutdown Root Cause Analysis
Solenoid Valves Questions & Answers – 4

Keep Learning

Identify Problem with Oily Water Filter Instrumentation

Identify Problem with Oily Water Filter Instrumentation

liquid level Measurement

Hydrostatic Level Measurement – Temperature related Density Change Effects

two chemical streams are mixed together

Practical Process Control System Questions & Answers – 12

three-phase motor control circuits

How Overload Heaters used to Automatically Shut the Motor OFF ?

Guided-wave Radar Asset Management Parameters

Guided-wave Radar Asset Management Parameters

A span error with wrong slope

Determine the Instrument Calibration Error

Steam Eductor Question

A Series of False Pressure Alarms

PLC Circuit Answers

PLC connected to Three Pushbutton Switches

Learn More

Fire Alarm System Commissioning Procedure

Fire Alarm System Commissioning Procedure

Dew Point Method Humidity Measurement

Humidity Measurement Principle

Zero Suppression in level Measurement

Zero Suppression and Zero Elevation Calculations

Analysis Instrumentation Objective Questions

Analysis Instrumentation Objective Questions

Fire Extinguisher Operation

Basics of Fire Extinguisher

Electric Motor Actuator Parts

Electric Motor Actuator Parts

Transistor Collector Feedback Bias

Transistor Collector Feedback Bias

Reed Switch Principle

Reed switch Working Principle

Menu

  • About
  • Privacy Policy
  • Copyright

Quick Links

  • Learn PLC
  • Helping Hand
  • Part Time Job

YouTube Subscribe

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?