What is Blowdown Valve (BDV)?

The blowdown valves are used for operation in the open position. The main function of the blowdown valve is mainly to control a continuous flow of steam/fluid under high differential pressure.

The outstanding feature of this type of valve is that it can maintain fluid-tightness and it is easily operated without the help of any wedging action.

Blowdown Valve (BDV)

What is Blowdown Valve (BDV)

Applications of Blowdown valves

The primary function of a blowdown valve is to control the concentrations of suspended & total dissolved solids (TDS) in the boiler.

Boiler blowdown is a severe service application which results in rapid erosion and wearing out of conventional valves.

Types of Blowdown valves

Continuous blowdown is usually an on-going process, whereas intermittent blowdown is performed on an as needed basis.

Continuous Blowdown (CBD) valves

Continuous Blowdown (CBD) valves are designed to operate in continuous open position by releasing water continuously through a blowdown tap near the boiler water surface, thereby maintaining the TDS level in the boiler drum.

Continuous Blowdown Valve is an angle type valve with a needle shaped trim in a venturi diffuser. The venturi diffuser provides sufficient area for the high velocity flashing water, thereby avoiding choked flow.

Intermittent Blowdown (IBD) valves

Intermittent Blowdown (IBD) valves are designed to operate at predetermined intervals by releasing water & accumulated sludge periodically through a blowdown tap near the bottom of the boiler.

The primary requirement of these valves is to provide tight shut-off even after repetitive blowdown operations.

Earlier, these two functions (blowdown and sealing) were performed by two different valves installed in series and operated in a definite sequence.

Intermittent Blowdown Valve carries out both these functions in sequence i.e. blowdown in open position and sealing in closed position.

This is achieved by providing a multi-step throttling plug, which splits the total pressure drop across each step.

The sealing area is separate from the throttling area, which reduces erosion and provides leak tightness even after prolonged usage.

Read Next:

You've successfully subscribed !

View Comments

  • Very informative article. I have a doubt, please clarify.

    Is it a good engineering practice to take close feedback of battery limit shutdown valves before open command goes to BDV during depressurization?
    Please share the reason.

Share

Recent Articles

  • PLC Tutorials

PLC Ladder Logic Design: Control 3 Motors with Toggle Switch

PLC ladder logic design to control 3 motors with toggle switch and explain the program…

3 weeks ago
  • PLC Tutorials

VFD Simulator Download – Free Yaskawa V1000 Software

VFD simulator download: Master the online tool from the Yaskawa V1000 & programming software for…

4 days ago
  • PLC Tutorials

Conveyor Sorting Machine PLC Program with Calculation Function

The conveyor sorting machine is widely used in the packing industries using the PLC program…

7 days ago
  • PLC Tutorials

Example of Flip-Flop PLC Program for Lamps Application

Learn the example of flip-flop PLC program for lamps application using the ladder logic to…

7 days ago
  • PLC Tutorials

STAR DELTA Programming using PLC Controller

In this article, you will learn the STAR DELTA programming using PLC controller to start…

1 week ago
  • Instrumentation Design

Single and Three Phase Immersion Electrical Heaters Wiring Circuits

Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…

5 days ago