You can find the top 10 objective questions and answers on Process Control Automation PLC. A quiz also available at the end of the article to practice the questions and evaluate yourself.
In case you have attended any competitive exams or interviews recently or have additional questions beyond what we covered, we encourage you to post them in our Instrumentation Forum to discuss about it further.
A) Control lag
B) Process lag
C) Dead Time
D) Error
A) False
B) True
A) Hysteresis
B) Control lag
C) Process lag
D) Dead Time
A) Process variable
B) Error
C) Manipulated variable
D) Setpoint
A) Error
B) Dead Time
C) Process Lag
D) Control Lag
A) Instrumentation
B) Automation
C) Control System
D) Mechatronics
A) Error & Gain
B) Control variable
C) Manipulated variable
D) Process variable
A) chemical quantity to physical form
B) mechanical quantity to electrical form
C) physical quantity to electrical form
D) electrical quantity to physical form
A) None of the Answers
B) Wiring
C) HMI
D) Automation
A) system to check the voltage
B) system to keep the parameters at highest value
C) system to maintain the parameters constant
D) system to keep the parameters at zero value
A) False
B) True
A) Gain
B) SetPoint
C) Error
D) Process variable
A) to control electrical parameters
B) to control mechanical parameters
C) to control optical parameters
D) to control physical parameters
A) Closed loop system
B) Either Closed or Open Loop
C) None of the Answers
D) Open loop system
A) All of the Answers
B) P & ID
C) Process equation
D) System
A) slow response
B) good accuracy
C) good stability
D) less error
A) 8 elements
B) 2 elements
C) 6 elements
D) 4 elements
A) Analog Indicator
B) Digital indicator
C) Integrator
D) Recorder
A) amplifier
B) clipper
C) sensor
D) comparator
A) internal and external disturbances
B) power
C) current
D) voltage
This quiz section consists of total 20 questions. Each question carries 1 points. No negative points for wrong answers. You need to score at-least 50% to pass the quiz i.e. 10 Points. You can get Quiz Answers after submitting all questions.
Also Practice Tests on : Instrumentation Quiz
The PLC panel and MCC panel interface signals are start, stop, run feedback, trip, local…
In this article, we are going to discuss about shutter door control using induction motor…
Electrical Drives control the motion of electric motors. Motion control is required in industrial and…
PLC ladder logic design to control 3 motors with toggle switch and explain the program…
VFD simulator download: Master the online tool from the Yaskawa V1000 & programming software for…
The conveyor sorting machine is widely used in the packing industries using the PLC program…