Instrumentation Design

Field Instruments Selection Aid

Operating Conditions and Requirements on the Measuring Point

When a New Field Transmitter installation is being planned, measuring point / tapping point to be selected and certain requirements must be satisfied in order for the desired measuring effect to be realized. Shall the meter provide information by itself (for example through local indication) or support another function (for example as an actual value generator for a controller). The planner begins his preparations for the meter selection by considering the operating conditions. He raises questions regarding the measuring medium, the local conditions and the measured value presentation requirements.

The following keyword summary is considered as a selection aid:

Properties of the Measuring Medium:

– Gas, steam: dry, wet
– Liquids: gas and solids content, crystallizing component deposits, dust in gas
– Density
– Temperature, temperature variations, time relationships
– Viscosity
– Electrical conductivity, of the deposits
– Chemical aggressiveness, material selection
– Abrasion danger

Operating Conditions:

– Pipe nominal diameter
– Design of a channel, slopes, damming
– Pressure rating
– Flow rate, smallest, largest value: type of flow changes (step changes)
– Flow conditions: linear, turbulent flow velocity distribution, swirl, pulsation
– Bidirectional (forward and reverse)
– Static pressure, pressure shock, pressure drop permissible

Ambient Conditions:

– Ambient temperature
– Humidity effects, degree of protection
– Dust entry, degree of protection
– Vibration
– Pipeline construction upstream and downstream of the measuring point
– Explosion protection
– Power supply, cabling
– Electromagnetic and radio frequency interference
– Mounting options

Measured Value Presentation:

– Measuring accuracy
– Fixed, adjustable, internal, external measuring range
– Internal, external monitoring capabilities
– Local indication
– Totalization, integration
– Alarm signalling unit
– Standardized analog output, what value?
– Pulse output for remote totalization
– Communication, which type?
– PROFIBUS, FOUNDATION Fieldbus
– HART Protocol
– Explosion protection
– Calibratability

You've successfully subscribed !
Share

Recent Articles

  • PLC Tutorials

VFD Simulator Download – Free Yaskawa V1000 Software

VFD simulator download: Master the online tool from the Yaskawa V1000 & programming software for…

2 days ago
  • PLC Tutorials

Conveyor Sorting Machine PLC Program with Calculation Function

The conveyor sorting machine is widely used in the packing industries using the PLC program…

5 days ago
  • PLC Tutorials

Example of Flip-Flop PLC Program for Lamps Application

Learn the example of flip-flop PLC program for lamps application using the ladder logic to…

5 days ago
  • PLC Tutorials

STAR DELTA Programming using PLC Controller

In this article, you will learn the STAR DELTA programming using PLC controller to start…

6 days ago
  • Instrumentation Design

Single and Three Phase Immersion Electrical Heaters Wiring Circuits

Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…

3 days ago
  • Instrumentation Design

Immersion Heaters in Lube Oil Consoles

Rotating equipment packages such as pumps, compressors, turbines need the lube oil consoles for their…

5 days ago