PLC Switch Actuation Status

Suppose we have an Allen-Bradley MicroLogix 1000 controller connected to three process switches as shown in this illustration:

Determine the necessary switch actuation statuses (i.e. low versus high process stimulus) to turn the blue lamp on, given the following program running in the PLC:

Next, determine the necessary switch actuation statuses (i.e. low versus high process stimulus) to turn the yellow lamp on, given the same PLC program.

Answer

High temperature and low flow and high level are required to energize the blue lamp.

Low temperature and high flow and high level are required to energize the yellow lamp.

Share Your Answer / Comments

Credits : by Tony R. Kuphaldt – under CC BY 1.0

You've successfully subscribed !
Share

Recent Articles

  • PLC Tutorials

Conveyor Sorting Machine PLC Program with Calculation Function

The conveyor sorting machine is widely used in the packing industries using the PLC program…

5 days ago
  • PLC Tutorials

Example of Flip-Flop PLC Program for Lamps Application

Learn the example of flip-flop PLC program for lamps application using the ladder logic to…

5 days ago
  • PLC Tutorials

STAR DELTA Programming using PLC Controller

In this article, you will learn the STAR DELTA programming using PLC controller to start…

5 days ago
  • Instrumentation Design

Single and Three Phase Immersion Electrical Heaters Wiring Circuits

Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…

2 days ago
  • Instrumentation Design

Immersion Heaters in Lube Oil Consoles

Rotating equipment packages such as pumps, compressors, turbines need the lube oil consoles for their…

5 days ago
  • PLC Tutorials

How to Blink Lights in Ladder Logic?

This article explains how to blink lights in ladder logic with a detailed explanation video…

4 weeks ago