Suppose we have an Allen-Bradley MicroLogix 1000 controller connected to three process switches as shown in this illustration:
Determine the necessary switch actuation statuses (i.e. low versus high process stimulus) to turn the blue lamp on, given the following program running in the PLC:
Next, determine the necessary switch actuation statuses (i.e. low versus high process stimulus) to turn the yellow lamp on, given the same PLC program.
Answer
High temperature and low flow and high level are required to energize the blue lamp.
Low temperature and high flow and high level are required to energize the yellow lamp.
Share Your Answer / Comments
Credits : by Tony R. Kuphaldt – under CC BY 1.0
The conveyor sorting machine is widely used in the packing industries using the PLC program…
Learn the example of flip-flop PLC program for lamps application using the ladder logic to…
In this article, you will learn the STAR DELTA programming using PLC controller to start…
Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…
Rotating equipment packages such as pumps, compressors, turbines need the lube oil consoles for their…
This article explains how to blink lights in ladder logic with a detailed explanation video…