Metro is one of the public transports widely used all over the world. In this project we are going to apply PLC automation in METRO. This project is completely built to practice the sequence of operation in PLC Programming. It may completely vary in real time.
Address | Description | Type |
I:0/0 | Human Presence | Input |
I:0/1 | Stop | Input |
I:0/2 | Bag Presence | Input |
I:0/3 | Ticket Sensor-Station A | Input |
I:0/4 | Starts At Station B | Input |
I:0/5 | Starts At Station A | Input |
I:0/6 | Ticket Sensor-Station B | Input |
I:0/7 | Starts At Station C | Input |
I:0/8 | Ticket Sensor-Station C | Input |
I:0/9 | Ticket Sensor-Station D | Input |
B3:1 | Gun | Memory |
B3:2 | Knife | Memory |
B3:3 | Bomb | Memory |
B3:4 | Bone | Memory |
B3:5 | Blood | Memory |
O:0/0 | Person Allowed | Output |
O:0/1 | Entry Gate Open | Output |
O:0/2 | Bag Allowed | Output |
O:0/3 | Train Door Open | Output |
O:0/4 | Train Door Close | Output |
O:0/5 | Train Running From A To B | Output |
O:0/6 | Station B Door Open | Output |
O:0/7 | Station B Exit Gate | Output |
O:0/8 | Train Running From B To C | Output |
O:0/9 | Train At Station C Door Open | Output |
O:0/10 | Station C Exit Gate | Output |
O:0/11 | Pay Extra Money At Station C | Output |
O:0/12 | Train Running From C To D | Output |
O:0/13 | Train At Station D Door Open | Output |
O:0/14 | Station D Exit Gate | Output |
O:0/15 | Pay Extra Money At Station D | Output |
Human Checking – whether the human is having any restricted materials like Gun, bomb,Crackers ,Knife etc.
Language checking-whether the bags are having any Restricted material like petrol, Blood Bone etc.
After Taking ticket, she/he going to board metro from station A.
Five seconds given to People for boarding and door get closed after 5 seconds.
Metro train travelling from station A to B for 10 seconds
After reaching Station B, door gets open and ticket checking at exit door is happening.
(Ticket cost from Station A to B is 10/-)
Metro started running from station B to C.
After reaching Station C, door gets open and ticket checking at exit door is happening.
(Ticket cost from Station B to C is 20/-)
If the person is having ticket less than 20 rupee, It won’t allow the person to exit until he pay additional amount.
Same procedure the person who are all boarded in station B.
Metro started running from station C to D.
After reaching Station D, door gets open and ticket checking at exit door is happening.
(Ticket cost from Station A to D is 30/-)
If the person is having ticket less than 30 rupee, It won’t allow the person to exit until he pay additional amount.
Same procedure the person who are all boarded in station B and C
Program runs continuously until STOP PB is pressed
The above explained concept is designed for practicing sequence of operation in PLC for Metro Automation Project.
If you liked this article, then please subscribe to our YouTube Channel for PLC and SCADA video tutorials.
You can also follow us on Facebook and Twitter to receive daily updates.
Read Next:
PLC & Transmitter Readings Mismatch
On Delay Timer as Off Delay Timer
Electrical Drives control the motion of electric motors. Motion control is required in industrial and…
PLC ladder logic design to control 3 motors with toggle switch and explain the program…
VFD simulator download: Master the online tool from the Yaskawa V1000 & programming software for…
The conveyor sorting machine is widely used in the packing industries using the PLC program…
Learn the example of flip-flop PLC program for lamps application using the ladder logic to…
In this article, you will learn the STAR DELTA programming using PLC controller to start…
View Comments
Give me a HMI view for plc based Metro automation