Digital Electronics MCQ

Digital Electronics Objective Questions – Set 9

Practice Online Digital Electronics Test and check your score before you appear for your next written test.

Digital Electronics MCQ Online Test

Digital Electronics Objective Questions

1. The output of a logic gate is 1 when all its inputs are at logic 0. The gate is either

A) a NOR or an X-NOR
B) a NAND or an X-OR
C) an OR or an X-NOR
D) an AND or an X-OR

2. For checking the parity of a digital word, it is preferable to use

A) AND gates
B) NOR gates
C) NAND gates
D) X-OR gates

3. A gate is enabled when its enable input is at logic 1. The gate is

A) NAND
B) NOR
C) none of the answers
D) OR

4. The output of a logic gate is 1 when all its inputs are at logic 0. The gate is either

A) an OR or a NAND
B) an X-OR or an X-NOR
C) an AND or an X-NOR
D) a NAND or a NOR

5. The output of a gate is HIGH if and only if all its inputs are LOW. It is true for

A) NOR
B) X-NOR
C) X-OR
D) NAND

6. A bubbled NOR gate is equivalent to a

A) AND gate
B) X-OR gate
C) NOR gate
D) NAND gate

7. The output of a gate is LOW when at least one of its inputs is HIGH. This is true for

A) NOR
B) AND
C) OR
D) NAND

8. The output of a gate is HIGH when at least one of its inputs is LOW. It is true for

A) NAND
B) NOR
C) OR
D) X-OR

9. Which of the following gates cannot be used as an inverter?

A) AND
B) NAND
C) X-NOR
D) NOR

10. A gate is disabled when its disable input is at logic 0. The gate is

A) AND
B) none of the answers
C) OR
D) NOR

Click on the below button to launch the Quiz.

All 30 questions and answers are available in the Quiz.

Share your answers with us through the below comments section.

Take All Tests :

You've successfully subscribed !

View Comments

Share

Recent Articles

  • PLC Tutorials

PLC Emergency Stop Example Program

In the PLC emergency stop example program, when the emergency button is pressed, the elevator…

6 days ago
  • Common

Pneumatic Cylinder Movement Control with Timer Circuit

This article is about controlling the double-acting pneumatic cylinder movement control with a timer circuit.

2 weeks ago
  • Instrumentation Design

Instrumentation and Electrical Teams Interactions (Detail Design Engineering)

In this article, we will review the main responsibility scopes of the instrumentation and electrical…

4 days ago
  • PLC Tutorials

Daily Alarm PLC Program using Real-Time Clock

Learn the daily alarm PLC program using real-time clock instruction as per the required timings…

4 days ago
  • PLC Tutorials

Real-Time Clock in Omron PLC? – CX Programmer

A Real-Time Clock accurately tracks time from seconds to years and stores the data in…

2 weeks ago
  • PLC Tutorials

CX-Programmer Products Sorting & Counting – Omron PLC

Omron PLC logic for sorting the number of products and counting the number of products…

2 weeks ago