Inst ToolsInst ToolsInst Tools
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Search
  • Books
  • Software
  • Projects
  • Process
  • Tools
  • Basics
  • Formula
  • Power Plant
  • Root Cause Analysis
  • Electrical Basics
  • Animation
  • Standards
  • 4-20 mA Course
  • Siemens PLC Course
Reading: SCADA Multiple Choice Questions
Share
Font ResizerAa
Inst ToolsInst Tools
Font ResizerAa
  • Courses
  • Design
  • PLC
  • Interview
  • Control System
Search
  • Courses
  • Automation
    • PLC
    • Control System
    • Safety System
    • Communication
    • Fire & Gas System
  • Instrumentation
    • Design
    • Pressure
    • Temperature
    • Flow
    • Level
    • Vibration
    • Analyzer
    • Control Valve
    • Switch
    • Calibration
    • Erection & Commissioning
  • Interview
    • Instrumentation
    • Electrical
    • Electronics
    • Practical
  • Q&A
    • Instrumentation
    • Control System
    • Electrical
    • Electronics
    • Analog Electronics
    • Digital Electronics
    • Power Electronics
    • Microprocessor
  • Request
Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Inst Tools > Blog > PLC Tutorials > SCADA Multiple Choice Questions

SCADA Multiple Choice Questions

Last updated: March 4, 2021 3:48 pm
Editorial Staff
PLC Tutorials
3 Comments
Share
4 Min Read
SHARE

You can find the top 10 objective questions and answers on SCADA ( Supervisory Control and Data Acquisition ). A quiz also available at the end of the article to practice the questions and evaluate yourself.

Contents
SCADA Multiple Choice QuestionsClick on below button to launch the Quiz.

In case you have attended any competitive exams or interviews recently or have additional questions beyond what we covered, we encourage you to post them in our Instrumentation Forum to discuss about it further.

SCADA Multiple Choice Questions

SCADA Multiple Choice Questions

1. A ___________consists of high speed, unidirectional digital communication channel (e.g. fiber optics link, twisted-wire pair, etc.) which’s arranged as a closed loop or ring microcomputers are attached to the ring by ring interface units.

A) All the Answers
B) Ring system
C) Hierarchical system
D) Shared bus systems

2. A SCADA system performs Data acquisition, Networked data communication, _________ and Control.

A) Analog to Digital Conversion
B) 4-20mA to HART
C) All the Answers
D) Data representation

3. Sensors and control relays can’t generate or interpret protocol communication, _______ is needed to provide an interface between the sensors and the SCADA network.

A) Remote Terminal Units (RTUs)
B) All of the Answers
C) Field Instruments
D) HMI

4. A central host computer server or servers called ________

A) Switch
B) Master Terminal Units (MTUs)
C) Junction Box
D) Microcontroller

5. A collection of standard and/or custom software systems used to provide the SCADA central host and operator terminal application, support the communications system, and monitor and control remotely located field data interface devices called as ______

A) HART Protocol
B) Human Machine Interface (HMI)
C) Input Output Modules
D) Network Gateway

6. Combine communications paths to and from many RTUs into a single bit stream, usually using time division multiplexing (TDM) or other such bit stream manipulation techniques.

A) Human Machine Interface (HMI)
B) Multiplexers
C) Barrier
D) PLC

7. SCADA systems encompass the transfer of data between a central host computer and a number of ______________and/or Programmable Logic Controllers (PLCs), and the central host and the operator terminals.

A) Microcontrollers
B) Remote Terminal Units (RTUs)
C) Input Output Modules
D) Motor Control Center

8. _______ may employ one or more workstations and can be configured at the workstation or by an off-line personal computer.

A) RTU
B) Router
C) DCS
D) Gate Way

9. A _________ consists of number of minicomputers or microcomputers inter connected in a tree structure.

A) All the Answers
B) Hierarchical system
C) Shared bus systems
D) Ring system

10. In __________the connected processors communicated over a common channel using time-sharing, thus allowing attached computers to transmit information in short-duration, high speed bursts.

A) Ring system
B) All the Answers
C) Shared bus systems
D) Hierarchical system

Click on below button to launch the Quiz.

This quiz section consists of total 20 questions. Each question carries 1 points. No negative points for wrong answers. You need to score at-least 50% to pass the quiz i.e. 10 Points. You can get Quiz Answers after submitting all questions.

MCQ

Share your feedback on the quiz

Also Practice Tests on : Instrumentation Quiz

If you liked this article, then please subscribe to our YouTube Channel for PLC and SCADA video tutorials.

You can also follow us on Facebook and Twitter to receive daily updates.

Read Next:

SCADA & Telemetry Systems

Difference Between SCADA and HMI

How does SCADA Works ?

SCADA Interview Questions and Answers

PLC do the Scaling for a Sensor 

Don't Miss Our Updates
Be the first to get exclusive content straight to your email.
We promise not to spam you. You can unsubscribe at any time.
Invalid email address
You've successfully subscribed !

Continue Reading

Things to Take Care of When Designing SCADA System
4-20 mA Transmitter Wiring Types : 2-Wire, 3-Wire, 4-Wire
Design Counters in PLC Programming With a Move Instruction
Pump and Mixer Operations Example: PLC Timer-Based Control
PLC Programming for Tank Heating Control using Heater
PLC Example on Manufacturing Line Assembly
Share This Article
Facebook Whatsapp Whatsapp LinkedIn Copy Link
Share
3 Comments
  • Mohsin Raza says:
    January 31, 2021 at 1:22 pm

    Nice

    Reply
  • Janani says:
    April 19, 2021 at 11:17 am

    Answers please

    Reply
  • S Bharadwaj Reddy says:
    April 19, 2021 at 11:49 am

    Click on the “START QUIZ” button for the answers.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

128.3kFollowersLike
69.1kFollowersFollow
210kSubscribersSubscribe
38kFollowersFollow

Categories

Explore More

Automatic Vacuum Cleaner Programming in Omron PLC
PLC Analog Signals Wiring Techniques
Communication between Wincc and Tia Portal
PLC Programming to Control Lights in a Sequence
Getting to Know the LED Indications on GE Make PLC
Difference Between Static and Temp Memory in Siemens PLC TIA Portal
Lamp Control using PLC Logic Condition
How to Design a System Architecture in Industrial Automation?

Keep Learning

Save and BR Memory in Siemens PLC Programming

SAVE and BR Memory Instructions in Siemens PLC Programming

Types of Instructions in PLC Programming

Types of Instructions in PLC Programming

Difference Between PLC and SCADA

Difference Between PLC and SCADA

Light Tower in Industrial Automation

What is a Tower Lamp? – Light Tower in Industrial Automation

Leave Operational Logic in the PLC

#3 PLC Best Practices – Leave Operational Logic in the PLC wherever feasible

Difference Between Industrial Computer and Normal Computer

Difference Between Industrial Computer (IPC) and Normal Computer (PC)

Face Mask Making Machine using PLC and HMI

Face Mask Making Machine using PLC and HMI

Car Wash Program using Functional Block Diagram (PLC)

Car Wash Program using Functional Block Diagram (PLC)

Learn More

Fuse in a Electrical Circuit

Advantages & Disadvantages of Fuse in a Electrical Circuit

How to Read an Electrical Wiring Diagram

How to Read an Electrical Wiring Diagram?

Piping and Instrument Drawing

Difference between PFD and P&ID with Example

Control Systems Questions & Answers

Control Systems Objective Questions & Answers – Set 2

Ziegler-Nichols closed-loop Formula

Tuning a Temperature Process Control Loop

Embedded Systems

Introduction to Embedded Systems – Features, Types, Applications

Does Really a Safety Barrier is Important

Does Really a Safety Barrier is Important? – PLC DCS Systems

ORP Measurement

Basics of ORP Measurement

Menu

  • About
  • Privacy Policy
  • Copyright

Quick Links

  • Learn PLC
  • Helping Hand
  • Part Time Job

YouTube Subscribe

Follow US
All rights reserved. Reproduction in whole or in part without written permission is prohibited.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?