🔥 FREE FIELDBUS COURSE → REGISTER NOW 🚀 Online Training

Burst Transformer – Electrical Problem Solved

Electrical engineering root cause analysis (RCA) related to burst transformer and related problem solved.

Hardware Troubleshooting Steps for PLC Automation Systems

Learn the hardware troubleshooting steps and procedures of industrial automation systems like PLC, DCS, SCADA.

Poorly Built Switchgears – Why Breaker Parts Tear apart or don’t work?

Electrical engineering root cause analysis (RCA) related to poorly built Switchgears and Why do breaker parts tear apart or don’t work?

Alternate 110 KV Connection to Feeder A

Electrical engineering root cause analysis (RCA) related to Alternate 110 KV connection to Feeder A.

Frequent Feeder-A Lightning Arrester (LA) Bursts – Root Cause Analysis

Electrical engineering root cause analysis (RCA) related to frequent feeder-A Lightning Arrester (LA) bursts problems and solutions.

11 kV, 3.3 kV, and 400 V systems insulation resistance (IR) Problems

Electrical engineering root cause analysis (RCA) related to 11 kV, 3.3 kV, and 400 V systems insulation resistance (IR) values made infinity forever.

Recurring Short Circuit Flash Overs Safety Hazards & Damages

Phase to Phase and or Phase to earth short circuit flashovers damaged the bus ducts, switchgears, transformers, and other electrical equipment.

What is a Magnetic Contactor? – Principle, Types, Advantages

Basically, a magnetic contactor works on the same principle as a relay, connecting and disconnecting electricity.

A Large Gate Valve’s Failed Motorized Operation

A large gate valve’s failed motorized operation threatens NH3 plant guarantee test completion.

CO2 Absorber Corroded Wall Thickness & Weld Building

Every turnaround (TA) done CO2 Absorber corroded wall thickness weld building – a perennial problem resolved.