Root Cause Analysis (RCA): 1800 kW 8000 to 750 RPM Gearbox (GB) within week failing journal bearing (JBs) upset plant operations.

Antifriction Bearings Caused Machine Changeovers Posed Outages

Root Cause Analysis (RCA): Too poor antifriction bearings lives caused machine changeovers posed upsets / outages.

Antifriction bearings (AFB) Problems and Delays Plant Restarts

Too poor Antifriction Bearings (AFB) lives in general & delay plant restarts production loss from Impossible to remove Antifriction bearings.

Condensate Pump Frequent Wrecks Threatens Long Plant Outages

Root Cause Analysis (RCA) related to the Condensate Pump Frequent Wrecks Threatens Long Plant Outages.

Cooling Tower Fans Frequently Failing

Root Cause Analysis (RCA) related to the eleven numbers of Cooling Tower Fan frequently failing drives.

Within Few Weeks Failing Acid Dozing Pumps

A plunger pump dozing sulfuric acid to a urea plant’s water treatment ion-exchange vessel stopped pumping after first week end.

Phosphate Dozing System Problems

Small quantities of phosphate solution injection called ‘Phosphate Dozing’ into boiler drums precipitate the BFW residual salts.

Carbamate Plunger Pump Packing Problems Eliminated

Carbamate Plunger Pump packing 24 months lives fallen to 3 months & associated problems eliminated.

Cooling Water Circulating Pump Low throughput Resolved

Root Cause Analysis (RCA): Cooling water circulating Pump Low throughput resolved & proposed Rs 20 million pump add averted.

[RCA] Pump Low throughput Eliminated

Root Cause Analysis (RCA): A Plant BFW Pump Low throughput eliminated. Learn the problems and solutions.