Current flows from a three-phase generator on the left, represented as three Y-connected single-phase sources, via a transmission line into a symmetric Y-connected load on the right. The phases have been arbitrarily coloured red, green, and blue. The angular separation between the phases is 120°, or 2π/3 radians. The supply frequency you observe in this animation will depend on your computer performance, but should be around 0.3 Hz.
At any point along the transmission line, the net flow is zero at all times during the cycle. The neutral circuit, which would connect between the centre Y-points of generator and load, has been omitted. In a balanced system, it would carry no current.
The phase sequence is red→green→blue, indicated by the order in which current flows into the three loads in turn.
The conveyor sorting machine is widely used in the packing industries using the PLC program…
Learn the example of flip-flop PLC program for lamps application using the ladder logic to…
In this article, you will learn the STAR DELTA programming using PLC controller to start…
Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…
Rotating equipment packages such as pumps, compressors, turbines need the lube oil consoles for their…
This article explains how to blink lights in ladder logic with a detailed explanation video…