Ferroresonance in Power Transformers

Ferroresonance: 

Ferroresonance phenomenon can be triggered off through interaction of the system capacitance with a non-linear inductance, when transformer is at no-load. This oscillatory phenomenon or resonance phenomenon result in over-voltages which can damage the cable and the power transformer. Series ferroresonance is dangerous to power transformer

Ferroresonance can occur when: 

  • The power transformer is on no-load (even an active load which can be less than one tenth of the rated power can be sufficient to prevent the phenomenon of ferroresonance to occur by absorbing the energy).
  • A large capacitance exists in line or the cable connected to at least one terminal of the transformer while the other terminals remain at normal potential
  • An unbalanced situation is created by a single phase trip out, a break in the conductor or blowing of one or two fuses

Methods to Prevent Ferroresoance: 

  • Ferroresonance can be reduced by reducing the length between the transformer terminals and the section circuit-breaker or fuses
  • Avoid non simultaneous switching of power transformer
  • Earth the neutral point directly or through a resistor limiting the single phase fault current
You've successfully subscribed !
Share

Recent Articles

Conveyor Sorting Machine PLC Program with Calculation Function
  • PLC Tutorials

Conveyor Sorting Machine PLC Program with Calculation Function

The conveyor sorting machine is widely used in the packing industries using the PLC program…

4 days ago
  • PLC Tutorials

Example of Flip-Flop PLC Program for Lamps Application

Learn the example of flip-flop PLC program for lamps application using the ladder logic to…

5 days ago
  • PLC Tutorials

STAR DELTA Programming using PLC Controller

In this article, you will learn the STAR DELTA programming using PLC controller to start…

5 days ago
  • Instrumentation Design

Single and Three Phase Immersion Electrical Heaters Wiring Circuits

Lube oil consoles of rotary equipment packages in industrial process plants are usually equipped with…

2 days ago
  • Instrumentation Design

Immersion Heaters in Lube Oil Consoles

Rotating equipment packages such as pumps, compressors, turbines need the lube oil consoles for their…

4 days ago
  • PLC Tutorials

How to Blink Lights in Ladder Logic?

This article explains how to blink lights in ladder logic with a detailed explanation video…

4 weeks ago